Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2021-02-04 Special Meeting Minutes

of 91

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

         Hinterland Adventure Playground


                      Flood Management:

• Council’s 2018 flood model of Cooroy Creek used combined
  with LIDAR survey of local topology and proposed site levels
• Major storm events modelled from BOM datasets
• Q100 flood event in year 2100
• Risk management is centered on information, low-flow time-
  to-flood and management of patron evacuation
• Design incorporates resilient infrastructure (eg: electrical) and
  will minimise loss of materials and potential damage
• Site development will not exacerbate local or downstream
  flooding conditions
• Post-flood operations will check site for contamination,
  damage, etc. and any repairs needed: site will remain closed
  at this time
Log in to download the original file

2021-02-04 Special Meeting Minutes(PDF, 8MB).pdf · 8.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.