Original source · versioned page text
2021-02-04 Special Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Hinterland Adventure Playground
Flood Management:
• Council’s 2018 flood model of Cooroy Creek used combined
with LIDAR survey of local topology and proposed site levels
• Major storm events modelled from BOM datasets
• Q100 flood event in year 2100
• Risk management is centered on information, low-flow time-
to-flood and management of patron evacuation
• Design incorporates resilient infrastructure (eg: electrical) and
will minimise loss of materials and potential damage
• Site development will not exacerbate local or downstream
flooding conditions
• Post-flood operations will check site for contamination,
damage, etc. and any repairs needed: site will remain closed
at this time
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.