Referenced Document - MCU12/0216
Quarry Rehabilitation
Lake Macdonald Drive, Lake Macdonald
© 2012 - TTM Consulting (SC) Pty Ltd Reference No: 12SCT0037
5.4 Future (2014) Project Traffic Demands
The future project case scenario is obtained by the addition of development traffic generation
shown in Figure 5.1 to the base traffic volumes shown in Figure 5.2. These expected traffic
movements are shown in Figure 5.3.
132 / 76
Westridge
0/0
Quarry
0/0
Access 5/8
8/5
44 / 121
167 / 101
White Pit 5/5
Quarry
Access 5/5
0/3
Macdonald
Legend
123 / 456 = AM / PM
3/0
66 / 151
Drive
Lake
Figure 5.3: Estimated 2014 Peak Hour Traffic, With Development
Page | 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.