Original source · versioned page text
Referenced Document - MCU12/0216
Quarry Rehabilitation
Lake Macdonald Drive, Lake Macdonald
© 2012 - TTM Consulting (SC) Pty Ltd Reference No: 12SCT0037
7.1.2 Warrants for Turn Treatments Review
A review of warrants for turn treatments in Austroads Part 4A identifies that with the anticipated
traffic volumes, basic right (BAR) and basic left (BAL) turn treatments are required at each access
location.
Given the duration of haulage activities taking place and low existing background traffic volumes,
it is recommended that adequate signage be provided in lieu of the turn treatments noted above,
with any signage to be in accordance with the Manual of Uniform Traffic Control Devices
(MUTCD).
Page | 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.