Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Referenced Document - MCU12/0216

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Quarry Rehabilitation
Lake Macdonald Drive, Lake Macdonald

© 2012 - TTM Consulting (SC) Pty Ltd                                   Reference No: 12SCT0037



7.4        Internal Site Access Review

7.4.1      Internal Parking and Manoeuvring
TTM understands that a dedicated on-site compound will be established, which will provide
dedicated parking for up to 5 vehicles and adequate turning areas for truck activity.


7.4.2      Bridge Structures
TTM understands that the established creek crossing structure(s) along the Westridge Quarry
access have been designed to cater for the predicted development truck loads. TTM anticipates
that the structures will adequately cater for the development demands; however, a further
inspection by a structural engineer may be warranted.




                                                                                      Page | 21
Log in to download the original file

REFERENCED DOCUMENT - MCU12_0216.pdf · 2.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.