Referenced Document - MCU12/0216
Quarry Rehabilitation
Lake Macdonald Drive, Lake Macdonald
© 2012 - TTM Consulting (SC) Pty Ltd Reference No: 12SCT0037
Table 8.1: Observed Road Key Issue Condition Summary
Chainage Observed Road Condition
Westridge Quarry Access to Hoy Full pavement construction in relatively good condition.
Road
No major cracking or breakup of carriageway observed.
Unbound gravel surface leading from Lake McDonald Drive into site.
Hoy Road to Lake Ridge Court Full pavement construction in relatively good condition.
No major cracking or breakup of carriageway with minor surface
distress observed.
Lake Ridge Court to White Pit Full pavement construction in relatively good condition.
Quarry Access
No major cracking or breakup of carriageway with minor surface
distress observed.
White Pit Quarry Access Full pavement construction in relatively good condition.
No major cracking or breakup of carriageway observed.
Unbound gravel surface leading from Lake McDonald Drive into site.
8.3 Limitations of the Survey
TTM note that this study is a visual study of the existing road condition only. There has been no
soil testing carried out on the road material or the road foundations or any measurement of the
depth of gravel or road capping.
As noted, minor areas of maintenance concern or road deterioration have been observed, with
the following site pictures, as shown in Figure 8.1 indicating typical road pavement conditions
along the haulage route on the Lake MacDonald Drive corridor.
Page | 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.