Original source · versioned page text
Referenced Document - MCU12/0216
Quarry Rehabilitation
Lake Macdonald Drive, Lake Macdonald
© 2012 - TTM Consulting (SC) Pty Ltd Reference No: 12SCT0037
9. Traffic Management Plan
TTM understands that a further Traffic Management Plan will be prepared prior to any on-site
activities, which will be in accordance with the MUTCD.
TTM further understand that a Drivers’ Code of Conduct will be undertaken to ensure maintain a
high level of safety during the haulage operation.
It is recommended for a reduction in the existing speed limit to 60km/h during the period of
operational works. This will help in reducing vehicle speeds and minimising any potential
interaction between the truck activity and passing through traffic on Lake MacDonald Drive.
Page | 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.