Original source · versioned page text
Referenced Document - MCU12/0216
Quarry Rehabilitation Lake Macdonald Drive, Lake Macdonald © 2012 - TTM Consulting (SC) Pty Ltd Reference No: 12SCT0037 Table Index Table 3.1: Local Road Hierarchy 5 Table 4.1: Existing Daily Traffic Volumes 7 Table 6.1: Two Lane Rural Road Capacity – Rolling Terrain Two-Way Flow 11 Table 6.2: Maximum AADT’s for Various LOS on Two-Lane Two-Way Rural Roads 12 Table 7.1: Westridge Quarry Access Characteristics 14 Table 7.2: White Pit Quarry Access Characteristics 17 Table 8.1: Observed Road Key Issue Condition Summary 23 Figure Index Figure 1.1: Site Location 2 Figure 2.1: Proposed Haul Route 3 Figure 4.1: Existing (Surveyed) Peak Hour Traffic Volumes 2011 6 Figure 5.1: Estimated Development Generated Turn Movements 9 Figure 5.2: Estimated 2014 Peak Hour Traffic, Without Development (6% p.a. growth) 9 Figure 5.3: Estimated 2014 Peak Hour Traffic, With Development 10 Figure 6.1: RPDM Table 13.4 Intersection Capacity 13 Figure 7.1: Westridge Quarry Access: Aerial and Site Photographs 15 Figure 7.2: White Pit Quarry Access: Aerial and Site Photographs 18 Figure 7.3: White Pit Quarry Secondary Access: Aerial and Site Photographs 20 Figure 8.1: Typical Haulage Pavement Conditions: Lake MacDonald Drive Corridor 24 T:\Projects\12SCT\12SCT0037 CSR West Ridge Quarry Lake McDonald\Reports\TTM Traffic Report 03 December 2012 Final.docx iv
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.