               DEVELOPMENT ASSESSMENT DELEGATED REPORT

               Author                  Senior Development Engineer, Daniel Epps
                                       Development Assessment



                    APPLICATION DETAILS

                    Application No.                OPW26/0095

                    Applicant                      Rees Peter Maddren
                                                   Megan Clare O'Leary

                    Proposal                       Operational Works - Earthworks

                    Properly Made Date             29 July 2026

                    Information Request Date       Not Applicable

                    Information Response Date      Not Applicable

                    Decision Due Date              8 October 2026

                    Report Reviewed &              Will Lowe – 21 September 2026
                    Finalised By


                    PROPERTY DETAILS

                    Property Address               392 Sister Tree Creek Rd Kin Kin Qld 4571

                    RP Description                 Lot 1 SP 241381

                    Land Area                      10.5326 Hectares

                    Existing Use of Land           Vacant (Rural)


                    STATUTORY DETAILS

                    SEQRP Designation              Regional Landscape and Rural Production Area

                    Zone                           Rural

                    Precinct                       Not applicable

                    Local Plan Area                Not applicable

                    Overlays                       Landslide Hazard, Agricultural Land, Biodiversity, Waterways
                                                   and Wetlands, Bushfire Hazard,

                    Assessment Type                Code

               1.      PROPOSAL
               The application seeks approval for Operational Works - Earthworks.



Document Set ID: 25188797
Version: 3, Version Date: 21/09/2026
Full text of the other 8 pages

Page 2

               The locality and proposal plan are included below.




                                                         Figure 1 – Locality




                                                         Figure 2 – Site Plan

               2.     SITE DETAILS
               2.1. Site History
               There is no higher order approval requiring these works.
               It is understood that the works are to service the future construction of a dwelling.
                                                                                                       Page 2 of 9

Document Set ID: 25188797
Version: 3, Version Date: 21/09/2026

Page 3

               2.2. Site Description
               The allotment crests in the centre of the site and experiences a level change from 55m AHD to
               103m AHD.
               2.3. Surrounding Land Uses
               Rural.
               3.     ASSESSMENT
               3.1. Instruments for Statutory Assessment
               Under the Planning Act 2016 the application must be assessed against each of the following
               statutory planning instruments to the extent they are relevant to the development:
               •      State Planning Policy;
               •      South East Queensland Regional Plan;
               •      Planning Regulation 2017; and
               •      Noosa Plan 2020 (20 March 2026).
               3.2. Noosa Plan 2020
               The following codes from the Noosa Plan 2020 are applicable to this development:
               •      Works Codes
               •      Landslide Hazard Overlay Code
               The application has been found to generally comply with all applicable statutory instruments. The
               pertinent issues arising out of the assessment are discussed below:
               The proposed earthworks are to service the construction of an internal driveway (and driveway
               crossover – which falls under the accepted development provisions) and a future dwelling house.
               The works results in a surplus of 1,000m3 which is proposed to be retained on site towards the rear
               of the allotment. This is considered reasonable provided the balance is appropriate stabilised.
               The works are contained to within the site (aside from the accepted development works). Therefore
               many of the prestart conditions have not been recommended.
               The site is located in the Landslide Hazard Overlay, and a Geotechnical Report has not been
               provided. This can be conditioned.
               It is recommended that the proposed driveway crossover and building pad is crossed off the
               approved plans because they do not relate to this application.
               Engineering is generally satisfied that the proposed works satisfy the relevant provisions of The
               Noosa Plan 2020 subject to the following conditions which are recommended.
               4.     CONSULTATION
               4.1. Referral Agencies
               Not Applicable
               4.2. Internal Council Referrals
               Not applicable
               5.     CONCLUSION & REASONS FOR DECISION
               The proposed development generally complies with the requirements of the planning scheme and
               does not raise any significant issues that cannot be addressed by reasonable and relevant
               conditions. The application is therefore recommended for approval.
               The report is provided in accordance with Section 63(5) of the Planning Act 2016.
               RECOMMENDATION


                                                                                                     Page 3 of 9

Document Set ID: 25188797
Version: 3, Version Date: 21/09/2026

Page 4

               With regard to Application No OPW26/0095 for Operational Works - Earthworks situated at 392
               Sister Tree Creek Rd Kin Kin Qld 4571 and described as Lot 1 SP 241381, it is recommended the
               application be approved in accordance with the following details for the Decision Notice:
               1.      APPLICATION DETAILS

                   Application No:               OPW26/0095

                   Street address:               392 Sister Tree Creek Rd Kin Kin Qld 4571

                   Real property description:       Lot 1 SP 241381

                   Planning Scheme:              Noosa Plan 2020 (20 March 2026)

               2.      DECISION DETAILS

               Council decided to issue the following type of approval:
               •       Development Permit for Operational Works - Earthworks
               3.      CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.      ASSESSMENT MANAGER CONDITIONS

               APPROVED PLANS
               1.      Development undertaken in accordance with this approval must generally comply with the
                       approved plans of development. Where there are inconsistencies between the approved plan
                       and the conditions of the approval, the conditions of the approval override the approved
                       plans.
                       The approved plans are listed in the following table unless otherwise amended by these
                       conditions.

                          Plan No.              Rev.    Plan/Document Name                      Date

                          200                   C       Earthworks Plan Erosion & Sediment 12            August
                                                        Control Plan                       2026
                                                        Prepared by Infinity CE
                                                        As Amended by Council

                          300                   C       Driveway Site Plan                      12       August
                                                                                                2026
                                                        Prepared by Infinity CE
                                                        As Amended by Council

                          320                   C       Driveway Long-section & Typical Cross 12         August
                                                        section                               2026
                                                        Prepared by Infinity CE

               CURRENCY PERIOD
               2.      The Currency Period for this development approval lapses if the development has not
                       substantially started by 21 September 2028, unless an application to extend the currency
                       period is approved by Council.




                                                                                                      Page 4 of 9

Document Set ID: 25188797
Version: 3, Version Date: 21/09/2026

Page 5

               SITE SPECIFIC CONDITIONS
                      Geotechnical Stability
               3.     The “proposed fill area” detailed in the Approved Plans must:
                      a.      be positioned in such a way that will not block, redirect or otherwise adversely affect
                              surface flow; and
                      b.      be provided with ground cover that achieves both short- and long-term stabilisation.
                      (*) Refer to Advisory Note.
               4.     All works must be carried out in accordance with a Geotechnical Report (or part thereof)
                      prepared by a qualified person*.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               5.     All necessary approvals from external service providers (e.g., Unitywater) and external
                      parties on which the development works are proposed have been obtained and a copy
                      supplied to Council.
               6.     Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               7.     Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               8.     The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               9.     All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               10.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      the approved plans/documents and conditions detailed in this Decision Notice;
                      b.      all relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines; and
                      c.      the latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Works within Road Reserve/Reinstatement
               11.    Safe pedestrian and vehicle access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               12.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.

                                                                                                        Page 5 of 9

Document Set ID: 25188797
Version: 3, Version Date: 21/09/2026

Page 6

               13.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Earthworks and Retaining Walls
               14.    earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on
                      Earthworks for Commercial and Residential Development.
               15.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council.
               16.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies;
                      b.      1 in 4 for grassed areas;
                      c.      1 in 3 for planted areas; and
                      d.      1 in 2 for combined structural engineering and planting solutions.
                      Stormwater Drainage
               17.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               18.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g., by blocking or interfering with natural overland flows).
               19.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.
                      Erosion and Sediment Control
               20.    Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
                      Regulation 2019) must not be released from the site or to waters within the site, or be likely
                      to be released should rainfall occur, unless all reasonable and practicable measures are
                      taken to prevent or minimise the release and concentration of contamination.
               21.    Sediment and erosion control measures must be in place prior to works commencing. If such
                      measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
                      fines can be issued if sediments from the site are found to enter or have the potential to enter
                      Council’s stormwater system, natural waterways, any downstream stormwater filtration
                      system or adversely impacting on other properties. The sediment and erosion control design
                      and measures have NOT been approved, it is the site's Supervising Engineer who is
                      responsible for ensuring that the sediment and erosion control measures have:
                      a.      been duly designed by an RPEQ or CPESC and constructed in accordance with "best
                              practise" methods;
                      b.      been revised by an RPEQ or CPESC to address the issues raised by changes in the
                              projected construction schedule and/or methods;
                      c.      been revised to address predicted rainfall events; and
                      d.      achieve the desired environmental outcomes.
                      Council may request further controls to be installed should the implemented measures be
                      found inefficient.
               22.    The erosion and sediment control measures must be designed, installed and maintained in
                      accordance with the supervising engineer instructions and the current best practice
                      standards.
                      (*) Refer to Advisory Note

                                                                                                         Page 6 of 9

Document Set ID: 25188797
Version: 3, Version Date: 21/09/2026

Page 7

               23.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                      extent of disturbance and minimising the duration of soil exposure to adverse weather
                      conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
                      to rainfall occurring.
               24.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               25.    Prior to the completion of the development and commencement of use, all site surfaces must
                      be effectively stabilised using methods which have achieved effective short-term
                      stabilisation, and which will continue to achieve effective stabilisation in the medium to long-
                      term.
                      For the purpose of this condition, an effectively stabilised surface is defined as one that does
                      not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion
                      or lead to sedimentation, or lead to water contamination.
                      Damage to Services and Assets
               26.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               FOLLOWING CONSTRUCTION
                      Certification
               27.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.
               28.    Within 3 months of the completion of the work, certification from a suitably qualified person
                      (RPEQ – Registered Professional Engineer of Queensland) must be provided to Council
                      certifying that the works have been undertaken in accordance with a Geotechnical Report
                      prepared by a suitably qualified person and that the works achieve a global instability risk of
                      low or very low.
               5.     REFERENCE DOCUMENTS

               Not applicable.
               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes




                                                                                                               Page 7 of 9

Document Set ID: 25188797
Version: 3, Version Date: 21/09/2026

Page 8

               1.     Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               2.     Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.
               3.     Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Environmental Advisory Notes
               4.     The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               5.     Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control.
               6.     Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
                      in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
                      Engineer of Queensland (RPEQ).
               7.     As a general rule, a site is determined to have achieved effective short-term stabilisation if:
                      a.      Methods of stabilisation are:
                              •    appropriate for slopes and slope lengths; and
                              •    are consistent with best practice environmental management practices such as in
                                   the Manual for Erosion and Sediment Control or the IECA Manual; and
                      b.      Stormwater runoff from the site is not currently, and is not likely to result in visible
                              evidence of sedimentation or erosion, or lead to water contamination.
                      Biosecurity Act 2014 – Fire Ant Control
               8.     Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.
               10.    FURTHER DEVELOPMENT PERMITS REQUIRED

               Not applicable.



                                                                                                         Page 8 of 9

Document Set ID: 25188797
Version: 3, Version Date: 21/09/2026

Page 9

               11.    SUBMISSIONS

               Not applicable.
               12.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                      Page 9 of 9

Document Set ID: 25188797
Version: 3, Version Date: 21/09/2026

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning - OPW26 0095 (As Published).pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.