Attach_1-Certification+Plan

Attached to the e-mail Change to DA (Height condition) - MCU16/0138.02 & OPW16/0257.02.

of 4

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4. Description of component/s
certified                                      Field survey to measure height at completion and certify the Finished Floor Level
Clearly describe the extent of work            and Height above Natural Ground
covered by this certificate, e.g. all
structural aspects of the steel roof
beams.

5. Basis of certification
Detail the basis for giving the                Survey was carried out in accordance with the Survey and Mapping
certificate and the extent to which            Infrastructure Act 2003 and Surveyors Act 2003 and associated Regulations and
tests, specifications, rules, standards,       Standards on 28/8/19 by Tayvon Jack (Registered Surveying Associate) for
codes of practice and other
publications, were relied upon.
                                               whose work the Skyline Surveyors takes responsibility. On this day he found that
                                               the recently constructed building was built with a Finished Floor Level of RL
                                               2.82m AHD and the roof is 8.71m above Natural Ground as defined by Noosa
                                               Shire Council at the highest point.

6. Reference documentation
Clearly identify any relevant                  Skyline Surveyors Contour and Detail Survey 6999 DET, PSM Sketch 105735
documentation, e.g. numbered                   RL 4.577m AHD
structural engineering plans.
7. Building certifier reference               Building certifier reference number        Development approval number
  number and development
  approval number
8. Building certifier, competent              Name (in full)
  person or QBCC licensee
  details
                                               Skyline Surveyors
A competent person must be                    Company name if applicable                    Contact person
assessed as competent before                   Skyline Surveyors Pty Ltd                     Corey James
carrying out the inspection.
The builder for the work cannot give a        Phone no. (business hours) Mobile no.                    Fax no.
stage certificate of inspection.               07 5493 4877               0408 713 913
A competent person is assessed by
the building certifier for the work as        Email address
competent to practice in an aspect of          [email protected]
the building and specification design,
because of the individual’s skill,            Postal address
experience and qualifications. The
competent person must be registered
                                               11c/69 Attenuata Drive
or licensed under a law applying in the        Mountain Creek                                             Postcode 4557
State to practice the aspect.
If no relevant law requires the               Licence class                              Licence number
individual to be licensed or registered,       Consulting Cadastral Surveyor              5758
the certifier must assess the individual
as having appropriate experience,             Date approval to inspect received from building certifier
qualifications or skills to be able to give
the help.                                      N/A
If the chief executive issues any
guidelines for assessing a competent
person, the building certifier must use
the guidelines when assessing the
person.
9. Signature of building certifier,
  competent person or QBCC                    Signature                                            Date
  licensee
Note: A building certifier must sign this                                                                    28/08/19
form for temporary swimming pool
fencing under section 4 of Schedule 1
of QDC MP 3.4.

  The Building Act 1975 is administered by the Department of Housing and Public Works
Log in to download the original file

Attach_1-Certification+Plan.pdf · 1.3 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.