Council archive · source document
Minor Change Existing Approval - 132007.2399.03 (AS PUBLISHED)
A maximum penalty of $1,500 applies to an offence under this legislation.
3. The applicant is advised that development contributions and infrastructure charges
applicable to this development approval have been based on the following Uses Class/ Uses
and applicable quantities:-
Existing Development Approved Development
STAGE
Approved
Existing Use
Class / Use
Existing Quantity Use Class / Approved Quantity
Use
Open Space
Recreation 1 x Lot
+ +
Open Space
1 1 x Lot Multiple
Recreation 1 x Detached house lot
Housing - within a group title
Type 4 – subdivision
Conventional
Multiple Multiple
1 x Detached house lot 27 x Detached house lot
Housing - Type Housing -
2
4–
within a group title within a group title
subdivision Type 4 –
Conventional subdivision
Conventional
4. The applicant is informed that approval of this development application will trigger an
Infrastructure Charge in accordance with the Coastal Major Road Network Infrastructure
Charges Plan for the estimated amount of Stage 1 = $2,905 and Stage 2 = $75,522 (TOTAL
= $78,427) and is subject to variations in the Consumer Price Index, All Groups Brisbane
from JUNE 2008 until the date of payment. An Infrastructure Charge Notice will be issued
in accordance with Chapter 5 of the Integrated Planning Act 1997.
5. The applicant is informed that payment via credit card transaction will not be an acceptable
method of payment for development contributions conditioned in this permit or for
infrastructure charge notices issued separately.
6. The following property note (or similar) will be placed on Council’s rates records for the new
allotments:
"This property is close to Noosa Coastal Wastewater Treatment Plant. Whilst computer odour
modelling has determined that the development complies with the Queensland Odour
Amenity Guideline, odour may be detected at some times."
7. Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act
if the cost of operational works exceeds $80,000, then a portable long service leave levy is
required to be paid. In accordance with Section 77.(1) of the Act, Council is required to sight
the approved form issued by the Building and Construction Industry (Portable Long Service
Leave) Authority that confirms that the requirements of the Act have been satisfied. A
statutory declaration outlining the cost of the operational works must be submitted to Council
with the lodgement of any application for operational works over the site.
8. The applicant is advised that a Compliance Permit for all plumbing and drainage works within
the boundaries of the development site shall be obtained from Council’s Plumbing Services
Section prior to obtaining a Development Permit for Building Works.
9. The applicant is advised that this development may require the provision of fire hydrants and
a booster pump in accordance with the Building Code of Australia, and consultation may also
be needed with Queensland Fire Services to ensure suitable fire fighting infrastructure is
provided. To this end any necessary fire hydrants shall be clearly shown on the plans
submitted for both Operational Works and Building Works approval and if a booster pump is
deemed necessary, the plans shall indicate where the fire truck is to be accommodated in
order to provide boosting to the water supply.
Page 15 of 19
Document Set ID: 24764739
Version: 6, Version Date: 18/05/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval - 132007.2399.03 (AS PUBLISHED).pdfRelated documentApplication case desk ↗
About this file
- File size
- 216 KB (small file)
- File type
No other editions are linked here.