Currency Period
3. This development approval lapses if the use has not happened by 16 April 2032, unless an
application to extend the currency period is approved by Council.
Building Height
4. The maximum height of the development must not exceed 8 metres above ground level.
5. Certification must be submitted to Council from a Licensed Surveyor which certifies that the
building does not exceed the maximum height requirement of this Decision Notice.
Performance Bond
6. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000 must
be submitted to Council, to secure performance of all conditions of this approval, prior to the
issue of a Development Permit for Building Works. The cash bond or trading bank guarantee
will be returned on performance of the conditions of approval less any costs incurred by
Council in respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
POD
7. All building works must be wholly contained within the building envelope applying to the site.
8. The developer is to undertake construction practices that prevent damage and destruction
of vegetation outside the building envelope. To this end, the building envelope is to be
delineated by tape or other means to limit encroachment by builders into the protected area.
Coastal Protection
9. External colours and finishes of the building must comprise of muted/environmental tones
that blend with the natural environment.
Coastal Protection
10. All lighting must be positioned and managed to reduce sky glow and light spill onto the beach
to minimise disruption to turtle nesting and sea-finding behaviour of hatchlings. The following
must be undertaken:
a. All windows, glass doors, glass panels and sky lights facing the beach (NE, E, SE)
must have 15% visible light transmittance tinting.
b. All windows, glass doors, glass panels and sky lights facing the beach (NE, E, SE)
must be fitted with opaque blinds, to be drawn from 8pm during turtle nesting and
hatching season (October – May).
c. All outdoor lights must have a maximum of 2700 K correlated colour temperature
(CCT). All indoor lights must have a maximum of 3000 K CCT. All lighting (interior and
exterior) must avoid the use of halogen, metal halide, or fluorescent lights.
d. Amber LED (590-610 nm) or low pressure sodium lighting must be used as a standard.
Warm white is to be used only where colour rendition is required. LED lights must not
contain short wavelength blue light and supplier should be asked to provide spectral
power curve of requested LEDs to prove the absence of short wavelengths.
e. The number and wattage of lights must be minimised.
f. All lights must be recessed into structures and roof, and directed away from the turtle
nesting habitat.
Page 3 of 13
Document Set ID: 24685347
Version: 4, Version Date: 29/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
New Decision Notice Tribunal decision - MCU25 0060 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 559 KB (small file)
- File type
No other editions are linked here.