e) Be revegetated with a species mix and density reflective of the local variant of the
Regional Ecosystem, site specific conditions and infrastructure requirements.
f) Turf cannot replace existing vegetation.
*(Refer to Advisory Note)
18. Where damage occurs to any Council asset as a result of the development works, it must be
repaired immediately where it creates a hazard that presents risk to person or property. Other
damage must be repaired prior to completion of works.
ENGINEERING
Property Access and Driveways
19. A residential driveway must be constructed to the subject site.
Stormwater Drainage
20. Stormwater runoff from the development must be disposed of without causing scour or
damage to the subject site or any adjoining property. On-site disposal must be undertaken
in accordance with the recommendations of a site-specific geotechnical report and endorsed
through a Building Permit.
Easements
21. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
22. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
23. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Geotechnical Stability
24. All works must be carried out in accordance with Tectonic’s Proposed Residential
Development (25038-001) dated 25 August 2025 and endorsed through the building permit.
(*) Refer to Advisory Note
25. Certification must be submitted to the private building certifier from a qualified person* which
certifies that the development has been constructed in accordance with the
recommendations contained in Tectonic’s Proposed Residential Development (25038-001)
dated 25 August 2025 and that the development has a minimum factor of safety against
landslip of 1.5 in the long term.
(*) Refer to Advisory Note
Earthworks and Retaining Walls
26. All earthworks and associated retaining structures/batters, both above and below ground
level, both temporary and permanent, must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
Page 5 of 13
Document Set ID: 24685347
Version: 4, Version Date: 29/04/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
New Decision Notice Tribunal decision - MCU25 0060 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 559 KB (small file)
- File type
No other editions are linked here.