Original source · versioned page text
Operational Works Application OPW26/0086 - DA Form 1, Standard drawing, xover drawing, Photo images - 125 Cooroy Belli Creek Rd, Cooroy
PART 2 - LOCATION DETAILS
3) Location of the premises (complete 3.1) or 3.2), and 3.3) as applicable)
Note: Provide details below and attach a site plan for any or all premises part of the development application. For further information, see DA
Forms Guide: Relevant plans._________________________________________________________________________________________
3.1) Street address and lot on plan
® Street address AND lot on plan (a// lots must be listed), or
□ Street address AND lot on plan for an adjoining or adjacent property of the premises (appropriate for development in
water but adjoining or adjacent to land e.g. jetty, pontoon. All lots must be listed).
Unit No. Street No. Street Name and Type Suburb
Belli
a)
Postcode Lot No. Plan Type and Number (e.g. RP, SP) Local Government Area(s)
D'JoSA
Unit No. Street No. Street Name and Type Suburb
b) Local Government Area(s)
Postcode Lot No. Plan Type and Number (e.g. RP, SP)
3.2) Coordinates of premises (appropriate for development in remote areas, over part of a lot or in water not adjoining or adjacent to land
e.g. channel dredging in Moreton Bay)
Note: Place each set of coordinates in a separate row.
□ Coordinates of premises by longitude and latitude
Longitude(s) Latitude(s) Datum Local Government Area(s) (if applicable)
□ WGS84
□ GDA94
□ Other:
□ Coordinates of premises by easting and northing
Easting(s) Northing(s) Zone Ref. Datum Local Government Area(s) (if applicable)
□ 54 □ WGS84
□ 55 □ GDA94
□ 56 □ Other:
3.3) Additional premises
□ Additional premises are relevant to this development application and the details of these premises have been
attached in a schedule to this development application
[xLNot required
4) Identify any of the following that apply to the premises and provide any relevant details
□ In or adjacent to a water body or watercourse or in or above an aquifer
Name of water body, watercourse or aquifer: ____________
□ On strategic port land under the Transport Infrastructure Act 1994
Lot on plan description of strategic port land: ____________
Name of port authority for the lot: ____________
□ In a tidal area
Name of local government for the tidal area (if applicable):
Name of port authority for tidal area (if applicable)
Page 2
DA Form 1 - Development application details
Version 1.6— 2 August 2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.