Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Operational Works Application OPW26/0086 - DA Form 1, Standard drawing, xover drawing, Photo images - 125 Cooroy Belli Creek Rd, Cooroy

of 17

Page text read automatically using OCR, there may be inaccuracies

   10) Subdivision
   10.1) For this development, how many lots are being created and what is the intended use of those lots:
   Intended use of lots created               Residential              Commercial              Industrial               Other, plga^e specify:


   Number of lots created

   10.2) Will the subdivision be staged?
   □ Yes - provide additional details below
   □ No_________________________
   How many stages will the works include?
   What stage(s) will this development application
   apply to?


  11) Dividing land into parts by agreement - how many parts are being created and what is the intended use of the
      parts?
   Intended use of parts created              Residential              Co      iercial         Industrial              Other, please specify:


   Number of parts created

   12) Boundary realignment
   12.1) What are the current and proposed areas for each lot comprising the premises?
                                Current lot       /                                                         Proposed lot
   Lot on plan description              Area^-fn2)                            Lot on plan description               Area (m2)



   12.2) What is the reason for the boundary realignment?



  13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
  (attach schedule if there are more than two easements)
  Existing or                Width (m)        Length (m)       Purpose of the easement? (e.g.                      Identify the land/lot(s)
  proposed?                                                    pedestrian access)                                  benefited by the easement




Division 3 - Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
  14.1) What is the nature of the operational work?
  □ Road work                                              □ Stormwater                           □ Water infrastructure
  □ Drainage work                                          □ Earthworks                           □ Sewage infrastructure
  □ Landscaping                                            □ Signage                              □ Clearing vegetation
  KI Other - please specify:
  14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
  □ Yes - specify number of new lots:
 '0JMo




                                                                                                                                Queensland
                                                                                                                         Hr Government

Log in to download the original (Operational Works Application OPW26_0086 - DA Form 1, Standard drawing, xover drawing, Photo images - 125 Cooroy Belli Creek Rd, Cooroy.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.