Decision Notice - 010.2008.00001546.001 [As Published] · 132008.1546

of 9

Text shows just the words. Original shows the document exactly as it was published.

                                                 Officer:          Glen Conforti
                                                 Direct Telephone: (07) 5449 5379
                                                 Response Address: Locked Bag 72
                                                                   Sunshine Coast Mail Centre QLD 4560
                                                 Email:            [email protected]
                                                 Our Reference:    2008/1546
                                                 Your Reference:
4 September 2009

Kawana Building Approvals
14/21 Nicklin Way
BUDDINA QLD 4575



Dear Sir/Madam

                                         Decision Notice
                                      Integrated Planning Act 1997

I refer to your application and advise that on 27 August 2009 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                     2008/1546
    Street address:                     16 Whale Drive, Sunshine Beach
    Real property description:          Lot 23 RP 865301
    Planning Scheme:                    The Noosa Plan

2        DECISION DETAILS
The following type of approval has been issued:
        Development Permit for Material Change of Use - Detached House

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS
Approved Plans
1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development. The approved plans are listed in the following table and as
         may be amended by these conditions.
          Plan No.               Plan -Prepared by                                          Date
          Dwg No: 1 of 17        Site Plan – Tim Lowe Building Design/Axis Surveys          6 May 2009
          Dwg No: 2of 17         Basement Floor Plan – Tim Lowe Building Design             6 May 2009
          Dwg No: 3 of 17        First Floor Plan – Tim Lowe Building Design                6 May 2009

                                                                                              Page 1 of 9
Full text of the other 8 pages

Page 2

                                                                                        2008/1546



      Dwg No: 4 of 17       Second Floor Plan – Tim Lowe Building Design              6 May 2009
      Dwg No: 5 of 17       Third Floor Plan – Tim Lowe Building Design               6 May 2009
      Dwg No: 6 of 17       Slab Plan – Tim Lowe Building Design                      6 May 2009
      Dwg No: 7 of 17       Elevations – Tim Lowe Building Design                     6 May 2009
      Dwg NO: 8 of 17       Elevations – Tim Lowe Building Design                     6 May 2009
      Dwg No: 9 of 17       Elevations – Tim Lowe Building Design                     6 May 2009
      Dwg No: 10 of 17      Elevations – Tim Lowe Building Design                     6 May 2009
      Dwg No: 11 of 17      Section A – Tim Lowe Building Design                      6 May 2009
      Dwg No: 12 of 17      Section B – Tim Lowe Building Design                      6 May 2009
      Dwg No: 13 of 17      Section C & D – Tim Lowe Building Design                  6 May 2009
      Dwg No: 14 of 17      Sections E & F – Tim Lowe Building Design                 6 May 2009
      Dwg No: 15 of 17      Section G & Notes – Tim Lowe Building Design              6 May 2009

Relevant Period
2.   The Development Permit for a material change of use lapses if the use has not happened by
     27 August 2013, unless an application to extend the currency is approved by Council.
Security Bond
3.   Security in the form of a cash bond or trading bank guarantee to the sum of $5,000 must be
     submitted, to secure performance of all conditions of this approval, prior to the issue of a
     Development Permit for building works. The cash bond or trading bank guarantee will be
     returned on performance of the conditions of approval less any costs incurred by Council in
     respect of enforcing performance of this permit.
Landscaping
4.   Dense screening vegetation shall be planted to the front setback either side of the driveway
     and to gardens in front of the retaining walls. These plantings (minimum 200mm pot size)
     consisting of native, endemic species with a mature height of not less than 3 metres are to be
     planted at a minimum of 1.5 metre centres in accordance with Council’s Landscaping Plants
     and Guidelines.
5.   A minimum of 20% of the site shall be retained as soft landscaping.
6.   Interference with vegetation on the site shall only occur to accommodate the proposed
     Detached House.
7.   All other vegetation shall be protected from interference resulting from clearing or construction
     activities by:
     7.1.     Clearly marking vegetation to be retained with flagging tape;
     7.2.     installing protective fencing around the drip line of the vegetation;
     7.3.     Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
              cause interference with vegetation; and
     7.4.     Low impact construction techniques are used around vegetation to minimise
              interference with the vegetation.
8.   Cleared vegetation is to be suitably processed by one of the following methods and removed
     from the site:


                                                                                       Page 2 of 9

Page 3

                                                                                      2008/1546



      8.1.   Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
             loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
             minimum of 10 metres between edges of heaps.
      8.2.   Disposal for firewood.
      8.3.   Disposal for landscaping purposes.
      8.4.   Transport to alternative site for breaking down materials provided that all necessary
             permits have been obtained to allow the alternate site to be used for this purpose.
      8.5.   The applicant is advised that burning off is an unacceptable method of disposal.
General
9.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
10.   The transportation of all materials to and from the site shall be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying materials either to or
      from the site shall be covered to prevent materials including dust being windblown from the
      vehicle.
11.   The proposed development shall have all kitchen, laundry and bathroom fittings that comply
      with the AAA Water Conservation Rating System as defined by the AS/NZS 6400 (Water
      Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and
      Drainage Standard Part 1.2), with toilets to comply with the AAAA Water Conservation Rating
      System. All tap ware and shower roses shall not exceed a maximum flow of 9 litres per min.
      Dishwashers and washing machines are excluded from this requirement.
12.   Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) shall
      not be constructed under overhead electricity transmission lines, or within any easements.
13.   External colours and finishes of the building shall comprise of muted/environmental tones that
      blend with the natural environment.
Vehicle Access
14.   A vehicular access driveway to serve the house shall be constructed from the Whale Drive
      frontage of the site with a maximum width of 3.0m.
15.   The driveway shall be designed and constructed to Council’s design standards and to grades
      that prevent vehicles from scraping and/or bottoming whilst also allowing pedestrians
      movements along the footpath without any step or level difference. Should any driveways be
      constructed to grades that do not comply with AS/NZS 2890.1-2004, Council will require that
      the driveway be removed and reconstructed to levels that do comply.
      Please note, a step between the driveway and the footpath shall be avoided, as it is preferred
      to have the footpath continue at a constant grade to minimise the potential for pedestrians to
      trip or fall.
16.   To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
      the driveway and any associated fencing or vegetation near the driveway shall comply with the
      minimum sight line requirements as defined in AS 2890.1, section 3.2.4. The applicant shall
      demonstrate compliance by illustrating these sight lines on the plans submitted for the Building
      Works approval.
17.   A Road/Footpath Permit shall be completed and submitted for the construction of the access
      driveway in accordance with Council’s Local Law No.8. If approval is given the driveway shall
      be constructed in accordance with Council’s standard drawings, which will be provided at time
      of approval.


                                                                                     Page 3 of 9

Page 4

                                                                                        2008/1546




Roof Water & Stormwater Drainage
18.   The overland flow drainage path within Easement E, as shown on Registered Plan 865301,
      must be maintained at all times. In this regard, plans must be submitted with the application for
      Building Works Approval that demonstrate the overland flow drainage path will be maintained,
      and scour will be prevented within Easement E at all times during and post construction
      phase.
19.   All stormwater drainage (including roof water overflow from the rainwater storage system)
      shall be collected and discharged so there is no net increase in stormwater runoff from the
      site. Stormwater drainage permitted to drain from the site shall be discharged to Council’s:
      19.1.   existing drainage structures in Whale Drive. Plans of the drainage design shall be
              prepared by a Registered Professional Civil Engineer and submitted to Council for
              approval prior to obtaining a Building Works approval; and/or
      19.2.   kerb & channel street drainage system in Whale Drive. Plans of the drainage design
              shall be prepared by a Registered Professional Civil Engineer and submitted for the
              Building Works approval.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
      drainage system at any one location is 25 litres/second.
20.   Roof runoff from any new building shall be directed to a rainwater storage system or tank that
      is installed to ensure water from the rainwater storage system or tank is used for external uses
      (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming
      pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps
      and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the
      Queensland Development Code (QDC) current at the time of building approval, and shall be
      part of the plumbing application for approval. The location and capacity of the tank(s) shall be
      clearly shown on the plans submitted for Building Works approval and any overflow shall be
      directed to the road frontage/the stormwater drainage system/etc located at Whale Drive.
21.   All site stormwater drainage shall be by means of a gravity system.
Services
22.   The applicant must provide reticulated water supply and sewerage services to the proposed
      development in accordance with The Noosa Plan.
23.   The outermost projection of the building (roof fascia) must be located to provide a minimum of 1.0
      metre horizontal clearance from the barrel of the Council sewer located on the southern boundary
      of the development site. Plans must verify this clearance.
24.   The sewer must be accurately located on site prior to building setout to ensure approved
      clearances from the Council sewer are maintained.
25.   A minimum of 750mm finished cover must be maintained over the Council sewer main where
      the proposed driveway crosses the sewer.
26.   The building walls, footings, and retaining structures greater than 1.0 metre in height must be
      located a minimum of 1.5 metres from Council sewerage infrastructure.
27.   The foundations of the building must be designed to ensure no load is placed on the sewer by the
      building.
28.   A deed of indemnity must be completed by the property owners for the encroachment of the
      building eaves within 1.5 metres of the Council sewer.
29.   The applicant must ensure that no stormwater, groundwater or sump pump shall be permitted
      to discharge to Council’s sewerage system.

                                                                                      Page 4 of 9

Page 5

                                                                                       2008/1546



30.    The applicant must ensure that on site storm water treatment tanks, soakage trenches, and
       gross pollutant traps maintain a minimum of 1.5 metres clearance from Council’s sewerage
       infrastructure.
31.    Location of the sewerage connection point for the development shall be clear of any proposed
       driveway.
32.    The applicant must adjust the level of the existing sewerage manhole, if necessary, to suit the
       proposed finished surface levels. Work to be undertaken by Sunshine Coast Water at the
       applicants cost.
33.    Any construction works to be undertaken in the vicinity of Council’s existing water supply or
       sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs
       associated with repair, replacement or alteration of existing infrastructure must be met by the
       applicant
Earthworks and Site Stability
34.    Earthworks carried out on site shall not affect the structural integrity of any of the existing
       fences or structures that border the development site.
35.    All excavations must be undertaken in accordance with the recommendations of the Letter to
       Bob Hedges from STA Alliance dated 3 June 2009 and Drawing STR-0217 number S01 Rev
       1 titled Site Plan Layout & Typ Wall Elevations dated 10 June 2009 by STA Consulting
       Engineers.
Erosion and Sediment Control
36.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
       site. Site control measures such as silt fencing, controlled gravel access to the site and
       controlled disposal of waste, will be necessary.
       In this regard, a plan detailing the methods of controlling erosion and sediment in accordance
       with the Healthy Waterways document and fact sheet series titled “Controlling Stormwater
       Pollution on your Building Site dated 2006” are required to be submitted with the application
       for a Building Works Permit.
General – Engineering
37.    Any damage caused to any public utility during the course of construction shall be repaired to
       Council’s standards and at no cost to Council.
38.    Any alteration of any public utility or other facilities necessitated by the development of the
       land or associated construction works external to the site shall be at no cost to Council.

5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency        Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan No.                    Plan -Prepared by                                      Date
 Dwg No: 1 of 17             Site Plan – Tim Lowe Building Design/Axis Surveys      6 May 2009
 Dwg No: 2of 17              Basement Floor Plan – Tim Lowe Building Design         6 May 2009

                                                                                      Page 5 of 9

Page 6

                                                                                         2008/1546



 Dwg No: 3 of 17             First Floor Plan – Tim Lowe Building Design             6 May 2009
 Dwg No: 4 of 17             Second Floor Plan – Tim Lowe Building Design            6 May 2009
 Dwg No: 5 of 17             Third Floor Plan – Tim Lowe Building Design             6 May 2009
 Dwg No: 6 of 17             Slab Plan – Tim Lowe Building Design                    6 May 2009
 Dwg No: 7 of 17             Elevations – Tim Lowe Building Design                   6 May 2009
 Dwg NO: 8 of 17             Elevations – Tim Lowe Building Design                   6 May 2009
 Dwg No: 9 of 17             Elevations – Tim Lowe Building Design                   6 May 2009
 Dwg No: 10 of 17            Elevations – Tim Lowe Building Design                   6 May 2009
 Dwg No: 11 of 17            Section A – Tim Lowe Building Design                    6 May 2009
 Dwg No: 12 of 17            Section B – Tim Lowe Building Design                    6 May 2009
 Dwg No: 13 of 17            Section C & D – Tim Lowe Building Design                6 May 2009
 Dwg No: 14 of 17            Sections E & F – Tim Lowe Building Design               6 May 2009
 Dwg No: 15 of 17            Section G & Notes – Tim Lowe Building Design            6 May 2009

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.      The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
        Local Law No. 12, prevents a builder or building contractor carrying out building work on a
        building site in a way that makes or causes audible noise to be made from the building work:
        1.1.    On a Sunday or public holiday, at any time; or
        1.2.    On a Saturday or a business day, before 7.00am or after 6.30pm.
        A maximum penalty of $1,500 applies to an offence under this legislation.
2.      Prior to the commencement of the development, a plumbing assessment must be obtained
        from Noosa Council’s Plumbing Services Section in accordance with the Plumbing &
        Drainage Act 2002 (as applicable).
3.      This property is located in the catchment area for the Coastal Major Road Network
        Infrastructure Charges Plan. A Building Works application may trigger an Infrastructure
        Charge payable to Council in accordance with the Infrastructure Charges Plan and Chapter
        5 of the Integrated Planning Act 1997
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

                                                                                        Page 6 of 9

Page 7

                                                                                     2008/1546



8        PROPERTY NOTES
Not applicable

9        PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable
10       FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required         Subject of the required Development Permit
 Development Permit for Building Works       All Building Works

11       SELF ASSESSABLE CODES

The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
         Detached House Code
         Detached House Driveways Code
12       SUBMISSIONS

Not applicable
13       REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable

14       RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15       OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,




Denis Wallace
SENIOR DEVELOPMENT PLANNER




                                                                                    Page 7 of 9

Page 8

                                                                                                      2008/1546



                                                        Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated
                                                                    (6) If an application involves assessment against a
Planning Act (Chapter 4).                                      concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to                      for the application are not available against the part of
development applications                                       the approval that represents the concurrence agency’s
                                                               response for the code.
Appeals by applicants
                                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following-          4.1.29.(1) An advice agency may, within the limits of
                                                               its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development      development approval for a development application
      application;                                             if-
(b) a matter stated in a development approval,                 (a) the development application involves impact
      including any condition applying to the                      assessment; and
      development, and the identification of a code
      under section 3.1.6;1                                    (b) the advice agency told the applicant and the
                                                                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a             application as a submission for an appeal.
      development permit was applied for;
                                                                  (2) The appeal must be started within 20 business
(d) the length of a relevant period;                           days after the day the decision notice or negotiated
(e) a deemed refusal.                                          decision notice is given to the advice agency as a
    (2) An appeal under subsection (1)(a) to (d) must          submitter.
be started within 20 business days (the “applicant’s           Appeals for matters arising after approval given
appeal period”) after the day the decision notice or           (co-respondents)
negotiated decision notice is given to the applicant.          4.1.30.(1) For a development approval given for a
    (3) An appeal under subsection (1)(e) may be               development application, a person to whom any of the
started at any time after the last day a decision on the       following notices have been given may appeal to the
matter should have been made.                                  court against the decision in the notice-
Appeals by submitters                                          (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application               extension of the relevant period for an approval;
may appeal to the court about-                                 (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including                minor change to an approval.
      any conditions (or lack of conditions) or other              (2) The appeal must be started within 20 business
      provisions of the approval; or                           days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval.          the person.
    (2) The appeal must be started within 20 business                (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day            approval resulted from a development application
the decision notice or negotiated decision notice is           (superseded planning scheme) that was assessed as
given to the submitter.                                        if it were an application under a superseded planning
                                                               scheme.
    (3) If a person withdraws a submission before the
application is decided, the person may not appeal the             (4) Also, a person who has made a request
decision.                                                      mentioned in subsection (1) may appeal to the court
                                                               against a deemed refusal of the request.
    (4) If an application involves both impact
assessment and code assessment, appeal rights for                 (5) An appeal under subsection (4) may be started
submitters are available only for the part of the              at any time after the last day the decision on the
application involving impact assessment.                       matter should have been made.
    (5) If an application is processed under section           Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the                Appeals for matters arising after approval given
application are available only for the aspects of the          (no co-respondents)
development that would have required public
notification under the repealed Act.                           4.1.31.(1) A person to whom any of the following
                                                               notices have been given may appeal to the court
                                                               against the decision in the notice-
a.                                                             (a) a notice giving a decision on a request to change
                                                                   or cancel a condition of a development approval.
1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                                     Page 8 of 9

Page 9

                                                                                                   2008/1546

(b) a notice under section 6.1.442 giving a decision to     (d) the length of a period mentioned in section 3.5.21
     change or cancel a condition of a development                relevant period;
     approval.                                              (e) a deemed refusal.
    (2) The appeal must be started within 20                    (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision      be started within 20 business days (the “applicant’s
is given to the person.                                     appeal period”) after the day the decision notice or
   (3) Also, a person who has made a request                negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the                (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request.              started at any time after the last day a decision on the
    (4) An appeal under subsection (3) may be               matter should have been made.
started at any time after the last day the decision on      The Registrar for the Building and Development
the matter should have been made.                           Tribunal may be contacted at the website
Appeals against decisions to change approval                http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
                                                            For Infrastructure Charges Only
decision made on an application to change the               4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under              charges
section 2.19(3)or section 4.4 of the repealed Act may       (1) This section applies to a person who has been
appeal to the court against-                                given, and is dissatisfied with, an infrastructure
(a) the decision; or                                        charges notice or a regulated State infrastructure
(b) a deemed refusal of the application.                    charges notice.
    (2) An appeal under subsection (1)(a) must be           (2) The person may appeal to the court against the
started within 20 business days after the day notice of     notice.
the decision is to be given to the person.                  (3) The appeal must be started within 20 business
    (3) An appeal under subsection (1)(b) may be            days after-
started at any time after the last day a decision on the    (a) if the notice is given because of a development
matter should have been made.                                    approval or master plan approval-the day the
Appeals against local laws                                       applicant is given notice of the decision about the
                                                                 approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions            (b)    otherwise-the day the notice is given to the
applied under a local law about the use of premises or             person.
the erection of a building or other structure permitted     (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court              (a) whether a charge in the notice is so
against the decision or the conditions applied.                  unreasonable that no reasonable relevant local
    (2) The appeal must be started within 20 business            government, State infrastructure provider or
days after the day notice of the decision is given to the        coordinating agency could have imposed it; or
applicant.                                                  (b) an error in the calculation of the charge.
For Building Works Only                                     (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the          appeal under this section can not be about the
Integrated Planning Act 1997 as follows:                    methodology used to establish the charge in the
                                                            relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
                                                            State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
     application;
(b) a matter stated in a development approval,
     including any condition applying to the
     development, and the identification of a code
     under section 3.1.6;3
(c) the decision to give a preliminary approval when a
     development permit was applied for;

a.
2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
   Section 3.1.6 (Preliminary approval may override
  local planning instrument)
                                                                                                 Page 9 of 9

Used in these records

About this file

File size
65 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00001546.001 [As Published].pdf · 65 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.