Skip to the record
Every meeting, every word.

Council archive · source document

DA Form 1 Application Details · MCU18/0015

of 11

Text shows just the words. Original shows the document exactly as it was published.

   10.2) Will the subdivision be staged?
       Yes – provide additional details below
       No
   How many stages will the works include?
   What stage(s) will this development application
   apply to?

   11) Dividing land into parts by agreement – how many parts are being created and what is the intended use of the
   parts?
   Intended use of parts created             Residential              Commercial              Industrial               Other, please specify:


   Number of parts created

   12) Boundary realignment
   12.1) What are the current and proposed areas for each lot comprising the premises?
                                    Current lot                                                                  Proposed lot
   Lot on plan description                    Area (m2)                               Lot on plan description                Area (m2)



   12.2) What is the reason for the boundary realignment?



   13) What are the dimensions and nature of any existing easements being changed and/or any proposed easement?
   (attach schedule if there are more than two easements)
   Existing or               Width (m)        Length (m)        Purpose of the easement? (e.g.                     Identify the land/lot(s)
   proposed?                                                    pedestrian access)                                 benefitted by the easement




Division 3 – Operational work
Note: This division is only required to be completed if any part of the development application involves operational work.
   14.1) What is the nature of the operational work?
       Road work                                                Stormwater                            Water infrastructure
       Drainage work                                            Earthworks                            Sewage infrastructure
       Landscaping                                              Signage                               Clearing vegetation
       Other – please specify:

   14.2) Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)
       Yes – specify number of new lots:
       No
   14.3) What is the monetary value of the proposed operational work? (include GST, materials and labour)
   $

PART 4 – ASSESSMENT MANAGER DETAILS
   15) Identify the assessment manager(s) who will be assessing this development application




                                                                                                                                                Page 5
                                                                                                             DA Form 1 – Development Application details
                                                                                                                               Version 1.0—3 July 2017

Used in these records

About this file

File size
153 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

DA Form 1 Application Details.pdf · 153 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.