Skip to the record
The only place to find full transcripts.

Council archive · source document

51993.961.1.01 Change to an approval

of 13

Text shows just the words. Original shows the document exactly as it was published.

Very large file (11.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

 i6. List below all of the forms and_supportfnglnformation tot accompany this application (IriclJ^e all IDAS.forms;.
 checklist's mandatory supporting mforrri`ation"etc thafwill oe submiftei3 as part of tins a pjiEaf[on-.-NbfeAW-- -- &--K
    does not apply_for applications made"ori=lin
                                             , e' us]     Smart eDA)_`


Description of attachment or title of attachment                                                    Method of lodgement to
                                                                                                    assessment manager




      By making this application, I declare that all information in this application is true and correct (note: it is unlawful to
I provide false or misleading Information).


Notes for completing this form


Question 8:
• Section 263 of the Sustainable PlanningAct 2009 sets out when the consent of the owner of the land is required for an
  application. Section 26o(i)(e) of the Sustainable Planning-Act 2009 provides that If the owner's consent is required
  under section 263. then an application must contain, or be accompanied by, the written consent of the owner, or
  Include a declaration by the applicant that the owner has given written consent to the making of the application.
• Owner's consent is not required for a mobile and temporary ERA.


Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development Involves a state resource, a
      regulation may require the application to be supported by certain evidence prescribed underthe regulation. Schedule
      14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is required to be
      given, and the evidence required, to support the application.

Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable long
      service leave levy is payable.
•     The portable long service'leave levy amount and other prescribed percentages and rates for calculating the levy are
      prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.


Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and Construction
      Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development permit is issued.
•     Building and Construction Industry Notification and Payment Forms are available from any Queensland post office or
      agency, on request from QLeave, or can be completed on the QLeave website at www.gieave.gld.gov.au. For further
      information contact QLeave on 18oo 803 481 or www.qleave.qld.gov.au.




                  o                                                                              'lpplic.itior, details -1DA5form Y
                                                                                                    Veisioii 1. o 18 December 2009

Used in these records

About this file

File size
11.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

51993.961.1.01 Change to an approval.pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.