FIGURE 2: SITE PLAN (SOURCE: SEALAND ARCHITECTS)
FIGURE 3: EXISTING SITE PLAN (SOURCE: SEALAND ARCHITECTS)
3 Existing Drainage
There is no existing public stormwater network near the subject lot. Instead, the existing dwellings roof
runoff is captured and discharged to a rubble pit. This rubble pit is located downhill of the dwelling near
the lot’s eastern boundary, see Figure 4. The rubble pit sheet flows to the east towards Sunshine Beach
Park before reaching the beach itself.
28 August 2024