Skip to the record
Search everything, all in one place.

Council archive · source document

Swmp · 132001.210327.1

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                 ABN 51 640 311 842
                                                                                                            CONTACT
                                                                                                    arcosgroup.com.au
                                                                                                             OFFICES
                                                                               Sunshine Coast | Brisbane | Gold Coast




FIGURE 2: SITE PLAN (SOURCE: SEALAND ARCHITECTS)




FIGURE 3: EXISTING SITE PLAN (SOURCE: SEALAND ARCHITECTS)



3        Existing Drainage
There is no existing public stormwater network near the subject lot. Instead, the existing dwellings roof
runoff is captured and discharged to a rubble pit. This rubble pit is located downhill of the dwelling near
the lot’s eastern boundary, see Figure 4. The rubble pit sheet flows to the east towards Sunshine Beach
Park before reaching the beach itself.




28 August 2024

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SWMP.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.