Council archive · source document
Swmp · 132001.210327.1
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
8 Conclusion
This SWMP has been prepared to support the application on the proposed renovation at 2/27 Ross
Crescent.
Arcos confirms the following:
• The existing dwelling has a fully functional and operating rubble pit;
• The portion of the proposed renovation which is replacing the existing will reuse the existing
rubble pit;
• To manage roof runoff effectively, alleviating any scour potential to the sensitive coastal erosion
area the new garage and new office will discharge to a secondary rubble pit which has been
adequately sized and located;
• No stormwater quality or quantity measures are required for this renovation.
In summary, this report shows that the stormwater can be adequately managed for this renovation in
accordance with Council's code requirements.
28 August 2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SWMP.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.