Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Sealed Final Judgment

of 19

Page text read automatically using OCR, there may be inaccuracies

 

— EyaAP ory =
ba Planning and Environment Court p IN oh WILL ERo. 3126 of 2015

  

eld at: Brisbane

K

uBetween: | NOOSAVILLE MEDICAL AND PROFESSIONAL CENTRE Appellant
2 PTY LTD
<q

  

ind: NOOSA COUNCIL Respondent

JUDGMENT
[e fore His Honour Judge Rackemann

Date of Hearing: 3 February 2017

B

 

 

Date of Order: 3 February 2017

THIS MATTER having this day come on for hearing by way of an appeal against the decision of
the Respondent, contained in its notice dated 13 July 2015, granting, in part, the Appellant's
request to change a development permit for material change of use for Commercial Business
Type 1 Office & Type 2 Medical, Retail Business Type 1 Local & Type 2 Shop, Education Type
3 Adult and Entertainment & Dining Business Type 1 Food and Beverage (the development
approval) for land formally described as Lot 3 on SP264909 and located at 90 Goodchap
Street, Noosaville in the State of Queensland

UPON HEARING the Counsel for the Appellant and the Counsel for the Respondent

AND UPON READING the affidavit of Shane Michael Adamson sworn 10 January 2017 and the
affidavit of Shane Michael Adamson sworn 2 February 2017

AND UPON THE COURT BEING SATISFIED THAT the changes to the development approval,
as set out in the affidavit of Shane Michael Adamson sworn 10 January 2017 and the affidavit of
Shane Michael Adamson sworn 2 February 2017, are permissible changes within the meaning
of the Sustainable Planning Act 2009

IT IS ADJUDGED BY CONSENT THAT:

A The appeal be allowed.
B The Respondent's decision of 13 July 2015 be set aside.
Cc The development approval is changed in accordance with the conditions of approval

and plans contained in Annexure A (pages 2 — 19).

 

Filed on: 03/02/2017

Filed by Thomson Geer

Service Address: Level 16 Waterfront Place, 1 Eagle Street, Brisbane QLD 4000

Phone: (07) 3338 7500

Fax: (07) 3338 7599

Email: [email protected] - i
Registrar

JUDGMENT THOMSON GEER

Filed on behalf of the Appellant Level 16 Waterfront Place

Form PEC-7 1 Eagle Street

BRISBANE QLD 4000

Tel: +61 7 3338 7500

Fax: +61 7 3338 7599

DX: 134 Brisbane

Matter no: MFM:3752191
Legal/47541127_1

 

Log in to download the original (Sealed Final Judgment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 18 pages

Page 2

                                        ANNEXURE A

                     CONSOLIDATED CONDITIONS OF APPROVAL


APPLICATION DETAILS

Application No:                132007. , 2.6

Street Address:                90 Goodchap Street, Noosaville Qld 4566
Real Property Description:     Lot 4 SP 196846 & Lot 2 SP I 55870
Planning Scheme:              The NODSa Plan (16 September 20.3)


CONSOLIDATED CONDITIONS OF APPROVAL

Land Use
I.   Development undertaken in accordance with this approval must generally comply with
     the approved plans of development, The approved plans are listed in the following
     table unless otherwise amended by these conditions.
       Plan No         Rev Plan/Document Name                                  Date
      CP2.02C-,             Overall Parking Layout, drawn by Middap            May 2016
                              Architecture Pty Ltd
      0427 - DAO2E            Site Plan - Overall Podium Level drawn by        I3/12/2007
                              Middap Ditchfield Pty Ltd
                              Amended in Red
      9427 - DAO3E            Site Plan - Overall Upper Plan, drawn by         I3/12/2007
                              Middap Ditchfield Pty Ltd
                              Amended in Red
      0427 - DAO5E            Stage 2 Stage 2 Podium Plan, drawn by Middap I31,212007
                              Ditchfield Pty Ltd
      0427 ~ DAO6E            Stage 2 Upper Floor Plan, drawn by Middap        I3/1 2/2007
                              Ditchfield Pty Ltd
      0427 - DAO70            Stage 2 Roof Plan, drawn by Middap Ditchfield    I3/1 2/2007
                              Pty Ltd
      0427 - DAO80            Existing Approved Elevations & Sections, drawn I 3/12/2007
                              by Middap Ditchfield Pty Ltd
      0427 - DAO90            Proposed Elevations & Sections, drawn by        13/4 212007
                              Middap Ditchfield Pty Ltd
                              Plan of Lots 4.5 & Emt D (Restricted) in Lot 4
                              SP 196846, drawn by Jones Flint & Pike
2.   The development must be undertaken and operated in a manner that causes no
     detrimental effect upon the amenity of the neighbourhood by reason of the creation of
     excessive noise, lighting nuisance or other emissions.
3.   The open space and setback areas are to be landscaped in accordance with Council's
     Policy on Landscaping Guidelines and a properly prepared landscape plan prepared
     by a suitably qualified Landscape Architect or Horticulturalist. Such landscaping is to
     be completed prior to the premises being occupied and maintained at all times
     thereafter. The Landscape Plans required to be submitted are to demonstrate dense
     vegetation comprising native trees and shrubs and include some mature plantings
     within the setback areas of the proposed car park structure, to assist providing a visual
     screen and buffer to adjoining residential premises.




                                                                                                 2

Page 3

        Existing trees on the site and within road reserves are to be retained, except where
        required to be removed due to building operations or the conduct of the approved use.
        Any advertising sign or device is to comply with Council's policies on advertising.
        All goods are to be displayed on site within the properly boundaries and/or on the
        premises approved for the use.
        Secure bicycle racks shall be provided on site to accommodate a minimum of 35 bicycles.
        The proposed bicycle racks shall be identified on the plans submitted for Operational
        Works approval and shall be located to the reasonable satisfaction of the Council.
        End of trip facilities shall be provided within the approved buildings at a minimum rate of I8
        lockers and 3 showers.

        Deleted.

        The proposed development shall not exceed a maximum height of 2 storeys and 10
        metres above natural ground level, with the exception of building B, which may be 3
        storeys in height in accordance with the approved plans.
        A verification survey of the building is to be carried out by a Licensed Surveyor and a
        certificate lodged with Council at completion of work confirming compliance with the
        maximum allowable building height as required by the condition 10 of the approval.
        The development is permitted a total maximum use area of 6,054m' with each individual
        use permitted the following maximum use areas at any one time:-
        12.1. Education - Type 3 Adult - 2,723m' comprising a maximum of 1,400m' student
              contact area and I 323m' of non-student contact area
         12.2. Retail Business - Type I Local - loom'
        12.3. Retail Business Type 2 Shop and Salon or Entertainment and Dining Business Type
              I Food and Beverages - 236m' (includes I6m' of outdoor dining).
        I2.4. The remaining use area being available for:
              Commercial Business Type I - once
              Commercial Business Type 2 - Medical
        Student contact area comprises all areas used for student lectures, tutorials or the like.
I3.     Any new hot water systems installed shall be either solar systems; electric heat pump
        systems; or gas systems (LPG or natural).
I4.     Any new kitchen, laundry and bathroom fittings are to comply with the AAA Water
        Conservation Rating System as defined by the As/NZS 6400 (Water Efficient Products -
        Rating and Labelling 2003) and As/NZS 3500 (National Plumbing and Drainage Standard
        Part I. 2), with toilets to comply with the AAAA Water Conservation Rating System. All tap
        ware and shower roses shall not exceed a maximum flow of 9 litres per min. Dishwashers
        and washing machines are excluded from this requirement.
I5.     Deleted.

I6.     The development shall be undertaken in accordance with the recommendations of the
        Acoustic Report prepared by TTM Consulting (SC) Pty Ltd.
I7.     Security in the form of a cash bond or trading bank guarantee to the sum of $25,000 must
        be submitted, to secure performance of all conditions of this approval, prior to the issue of
        a Development Permit for Operational Works. The cash bond or trading bank guarantee
        will be returned on performance of the conditions of approval less any costs incurred by
        Council in respect of enforcing performance of this permit.



Documen. 2



                                                                                                         3

Page 4

    I8. The requirements of this development approval are to be effected, prior to the use of the
          premises. Council reserves the right to call upon the bond or guaranteed sum referred to in
           this approval to effect compliance with conditions.
    I9. The Development Permit for a Material Change of Use and Reconfiguring a Lot lapses if
          the use has not happened by 17 February 20.4, unless an application to extend the
           currency is approved by Council.
    20. The developer must obtain all of the other Development Permits referred to in the Decision
          Notice, prior to obtaining a Development Permit for Building Works.
    Land DeveloDment

    Reconfiguring a Lot
    21. The lot reconfiguration shall be in accordance with plan SPt96846 as submitted by Jones
            Flint & Pike Pty Ltd except as modified heroin.
    22. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
           documentation shall be presented to Council and shall be submitted in the correct form
           with the fees prescribed in Council's adopted fee schedule.
.
    23. Pursuant to Section 3.7.3(3)(c) of the Integrated Planning Act, all outstanding rates and
         charges due and payable to Noosa Council in respect of the lots being reconfigured shall
           be paid prior to endorsement of the Plan of Survey,
    24. The applicant shall provide a 2m by 2m truncation on each corner of Lot 4 adjacent to Lot
            I on RP802360 on either side of Council's pathway to assist service vehicle access. An
           underground electricity service shall be provided to service all parts of Lot 4 if not already
           provided. The service shall be provided before the use commences.
    25. All parts of lot 4 shall be serviced by water supply appropriate for necessary requirements,
           such as firefighting. The service shall be provided before the use commences.
    Vehicle Access

    26. The eastern site access intersection shall be modified to increase the length of the parallel
           right turn storage lane to at least 20 metres.
    27. The existing primary vehicular access driveway off Goodchap Street (eastern access) shall
           be modified by the construction of a splitter island at the entrance should be extended to
         preclude right turns in or out of the car parking aisle along the front of the eastern building.
    28. All driveways shall be designed and constructed to Council's design standards and to
         grades that prevent vehicles from scraping and/or bottoming whilst also allowing
           pedestrians movements along the footpath without any step or level difference. Should
           any driveways be constructed to grades that do not comply with As2890. I-2004, Council
           will require that the driveway be removed and reconstructed to levels that do comply.
    29. To ensure pedestrian safety between vehicles exiting the site and pedestrians/cyclists on
         the footpath, the driveway and any associated fencing or vegetation near the driveway
           shall comply with the minimum sight line requirements as defined in As2890. ,, section
           3.2.4. The applicant shall demonstrate compliance by illustrating these sight lines on the
           plans submitted for both Operational Works approval and Building Works approval.
    30, In regard to the existing pathway between the two parts of Lot 4, buildings shall be
          modified as necessary to achieve these sight distances and this compliance demonstrated
          in the plans submitted as part of the operational works approval. The crossing shall also
          be a raised type, be appropriate Iy lit and give priority to pedestrians and cyclists.
    31. The access to and from Traders Lane will only be permitted for use by service and
         emergency vehicles. A sign indicating this shall be installed at the exit.


    Document2



                                                                                                            4

Page 5

32. In any operational works application, the developer shall demonstrate by the way of a
      turning template, that service and emergency vehicles can access the site via Traders
      Lane, If this cannot be achieved the building shall be set back or modified to allow entry of
       these vehicles.

33. All vehicles shall enter and leave the site in a forward direction.

Loading Areas
34. Two combined loading zone/carpark spaces shall be included on site and operate as a
     Loading Zone between the hours of 8 am to I I am weekdays and shall be sign posted to
       indicate this.

35. The combined loading zone I carpark space shall be sized to accommodate a small rigid
     vehicle in accordance with As 2890.2 - I 989. These spaces will be indicated on the
     operational works application for car parking.
Car Parking
Off Street

36. The development shall provide car parking spaces on the site at a minimum rate of 369 car
     parking spaces (including 40 parking spaces for the childcare centre).
37. All public parking spaces should be a minimum of 5.4m by 2.6m with 6.2m wide aisles.
     although staff parking spaces may be reduced to 5.4m by 2.4m with 6.2m aisles. In all
       other respects, the designs should comply with As2890. , - 2004.
38. Vehicular access to the site shall be primarily from Goodchap Street and car parking shall
       be generally in accordance with the approved plans.
39. All carparking shall be kept, maintained and line-marked in a condition fit for use.
40. All staff carpark spaces shall be clearly defined by line marking each space with the words
      "Staff Parking Only" and by sign posting each space with a similar wording.
Pathway Lighting
41. The existing pathway between the two existing lots shall have lighting installed from
     Goodchap Street to the rear boundary of Lot 4. This lighting shall have a high energy
     efficient rating to the reasonable satisfaction of Council and be designed to meet
       appropriate safety standards and riot to adversely impact residences in the area.
Vegetation Protection & Preservation
42. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
     shall be designed as a pervious pavement (such as grass paving cells or similar), as this
     will allow water that falls on this surface to penetrate to the trees root system. The
     pavement shall be constructed so as riot to damage the tree or their root system and in
     this regard temporary fencing shall be provided around the trees during construction to
       help protect them.
       Plans shall be submitted to the Council for approval that clearly show the type and extent
       of the pervious pavement and the temporary fencing prior to obtaining a Development
       Permit for Operational Works.
Frontage Works
43. Tree planting is required to the Goodchap Street frontage of Proposed Lot 5 in accordance
      with Planning Scheme Policy PSP03 Landscapyhg Plants & Guidelihes.




Document2



                                                                                                      5

Page 6

Roof Water & Stormwater Drainage
44, Roof runoff from any new building shall be directed to a rainwater storage system or tank
         (minimum storage the greater of 5000 litres or I 51itres/in' of roof area) that is installed to
         ensure water from the tank is used for external uses (such as watering gardens, irrigation,
         ornamental ponds, water features, outdoor cleaning, etc) and for use in flushing of toilets
         internal to the building. All rainwater tanks are to be designed and installed in accordance
         with the Queensland Development Code (QDC), Part 25 - Rainwater Tanks, and shall be
         part of the plumbing application in conjunction with the building approval. The location and
         capacity of the tanks shall be clearly shown on the plans submitted for Building Works I
         Operational Works approval and any overflow shall be directed to an approved discharge
         point.
45. All stormwater drainage (including roof water overflow from the rainwater storage system)
         shall be collected and discharged so there is no net increase in stormwater runoff from the
         site

46. A Stormwater Management Plan shall be submitted to Council in conjunction with an
     operational works application to demonstrate how water quality and quantity objectives are
     to be met, This Management Plan shall set the objectives and include a plan indicating
     location and sizing of the devices prosed. The operational works application shall be in
         accordance with this plan and buildings shall be modified if required to accommodate the
         necessary treatment infrastructure.
         All other clean stormwater, such as roof water, can be collected on site and discharged
         through a single underground drain line directly into the existing drainage system,
         bypassing the grease/oil arrestor and treatment system.
         A maintenance plan for the treatment devices shall be complied with for the duration of the
         approved uses.
         A Development Permit for Building Works shall not be granted until a Development Permit
         for Operational Works has been issued in regard to the drainage scheme.
47. All site stormwater drainage shall be by means of a gravity system.
Sewer Mains

48. All parts of the site shall be connected to Council's existing sewerage reticulation systems
         and be constructed in accordance with Council's standards and requirements at no cost to
         Council.

Town Water Supply
49. All parts of the site shall be connected to Council's existing town water supply and be
         constructed in accordance with Council's standards and requirements at no cost to
         Council.

50. For Multiple Uses (including Building Format Plans, Group Title Plans, etc) the
         development shall be served by:
         50.1. A single Body Corporate water meter to measure the total water consumption
               (including fire hose reels, but excluding fire hydrants and fire sprinkler systems), and
         50.2. Individual water meters to each tenement capable of being separately rated, and
         50.3. A fire service (fully testable single detector check with metered bypass), where
               applicable, for flows to fire hydrants and fire sprinkler systems (excluding fire hose
                  reels).




Docu, rent2



                                                                                                           6

Page 7

    Earthworks

    51. Filling works required on site shall be carried out in accordance with Section 3.8 of
           Council's Engineering Design Standards Manual and so as not to cause the additional
           ponding of water on any adjoining lands or the blockage of, or interference with, any
           existing overland flowpaths. Detailed site surveys indicating natural surface levels and
           contours of the adjoining properties must be provided with the application for a
           Development Permit for Operational Works for Filling and Drainage.
           This may require the design and construction of drainage pipes and/or an overland flow-
           path within the development site that caters for drainage from the adjoining sites for a
           design storm with an Average Recurrence Interval of I in I 00 years, A private easement
           for the Drainage of Water encompassing the drainage pipes or overland flow-path will also
           be required. In this regard a Development Permit for Operational Works shall be obtained.
           Should evidence be provided to Council indicating that no additional ponding of stormwater
           will occur on the adjoining properties the requirement for the drainage pipes, overland flow-
           path and easement shall not apply.
    52. Earthworks carried out on site shall riot affect the structural integrity of any of the existing
o          fences or structures that border the development site. Fences that are affected shall be
           replaced prior to the Building Certifier issuing the Certificate of Classification. In this
           regard any fences to be replaced shall be clearly shown on the plans submitted for
           Operational Works approval.
    Acid Sulfate Soils

    53. As the site is located below the 5m AHD, any excavation works consisting of I 00m' or
         greater and/or any filling works consisting of 500m' or greater and with an average depth
           of 0.5m or greater will need to be carried out in accordance with State Planning Policy 2102
           Planning and Managing Development Involving Acid Sulfate Soils. In this regard
           appropriate testing and supporting documentation prepared by a suitably qualified
           specialist shall be submitted to Council for approval prior to obtaining a Development
           Permit for Operational Works.
    Erosion and Sediment Control

    54. Any person acting on this permit shall prevent erosion and sediment export from leaving
         the site. Site control measures such as silt fencing, controlled gravel access to the site
         and controlled disposal of waste, will be necessary.
           In this regard plans detailing the methods of controlling erosion and sediment are required
           to be submitted to the Council for approval prior to obtaining a Development Permit for
           Operational Works.
    55. Monetary contributions shall be paid to Noosa Council towards the cost of providing and/or
         upgrading various infrastructure at the rates applicable at the time of payment. An
         estimate only of the contribution amounts under the current Council policies and
           requirements is outlined in the table below:
                                                                           STAGE B
                                                                                          TOTAL
                                                             STAGE A          (in
           Contribution Required For:                                     addition to    Stage A +
                                                                           Sta eA         Stage B
           PSP12 - Public Open Space Contributions                                        $ 3,233
            Park                                               $ 3,233        $0
            PSP, 6 - Sewera e Headworks Contributions         $ 34,617     $ 14,785      $ 49,402
                PSP, 7 - Water Supply Headworks                                          $ 55,356
                            Contributions
                                                              $ 29,629     $ 25,727
           PSP20 - Pathway Trunk Network                                                  $ 3,266
           Contributions
                                                               $ 3,266        $0


    Document2

Page 8

       TOTAL Contribution Amount =                        $ 70,745 $ 40,5.2 $ 111,257
       Please note, that these amounts are all subject to variations in the Consumer Price
       Index, All Grou s Brisbane from SEPTEMBER 2008 until the date of a merit.

       All contributions must be paid prior to the issue of a Development Permit for Operational
       Works for the relevant stage.
       Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should not
       be paid at the due time, Council shall call upon the trading bank guarantee in full.
       Processing of bonds for security where specific Council approval has been given for the
       bonding of contributions will incur an administration fee in accordance with Council's Land
       Development Commercial & Regulatory Fees at the time of lodgement.
       In the event that the Development Permit for Material Change of Use of Premises lapses
       or is cancelled, the paid contributions and/or the trading bank guarantee will be returned.
General

56. A suitably qualified Registered Professional Engineer shall prepare engineering drawings
      and specifications for all engineering works that will become Council infrastructure, which
      shall be submitted in conjunction with an application for a Development Permit for
      Operational Works. To avoid conflict with underground pipes or services, all existing and
      proposed services required by the development shall be shown on the plans.
57. Any alteration of any public utility or other facilities necessitated by the development of the
       land or associated construction works external to the site shall be at no cost to Council.

58. The transportation of all materials to and from the site shall be undertaken in a manner
     such that no particle matter escapes onto a public road. All vehicles carrying materials
     either to or from the site shall be covered to prevent materials including dust being
       windblown from the vehicle.

Environmental Health

59.    The developer must provide waste storage and disposal facilities in accordance with
       Planning Scheme Policy No. 9 "Waste Management Multi-Dwellings and Commercial and
       Industrial Premises", including an external imperviously paved area correctly sized for all
       refuse and recycling containers and suitably screened from public places and neighbouring
       properties.
60.    Refuse containers must be provided in accordance with the requirements of the
       Environmental Protection (Interim Waste) Regulations 1996 and (Waste Management)
       Regulation 2000, for the storage and collection of refuse.
61.    All refrigeration plant including motors, shall be situated within the building or suitably
       provided with noise reduction measures and located as to prevent a noise nuisance
       beyond the subject land in accordance with the nuisance provisions of the Environmental
       Protection Regulation 1998. On the spot fines apply for such offences.
62.    Noise emission from air conditioning equipment shall comply with the following
       requirements:
       62.1. The equipment shall be installed and located in a manner which prevents noise
             nuisance beyond the subject land in accordance with the nuisance provisions of the
             Environmental Protection Regulation I 998 and Council's Local Law No. I2 - Control
             of Nuisances. Infringement Notices (on-the-spot fines) may apply for offences.
       62.2. Submission of written certification from a suitably qualified person confirming that the
             noise levels comply when measured at the nearest residential boundary. This is
             required immediately after installation of the equipment and prior to any occupation
             of the building, and in a format approved by Council.


DocumentZ



                                                                                                        8

Page 9

                                                     .8.


            62.3. A person must not use equipment on any day if it makes or causes noise to be made

                  62.3. , . Before 7am or after IOpm: More than the lower of either -
                           . 40 d(B)A
                           . 3 d(B)A above the background noise level
                  62.3.2. From 7am to 7pm: More than the lower of either -
                           . 50 d(B)A
                           . 5 d(B)A above the background noise level
                  62.3.3. From 7pm to lopm: More than 3 d(B)A above the background noise level.
    Additional Conditions 7/3/08

    63. The applicant shall enter into an infrastructure agreement with Council with regard to the
          provision of private services within the 5m wide road reserve that divides the two separate
          parts of Lot 4 prior to the use commencing on the northern part of Lot 4. The conditions of
         the infrastructure agreement shall:
            a) Provide for the installation, maintenance and preservation of the private water an
                  electrical services that supply the separate parts of Lot 4,
            by Provide for the maintenance of the road reserve in those parts affected by the private
                  services,

            c) State that the applicant is responsible for obtaining approval for the design and
                  construction of the various services from the relevant authority,
            d) State that the design and construction of the services shall be wholly at the
                 applicant's expense and shall not entail a financial encumbrance on future
                 purchasers of the proposed lot, and
            e) Be to the satisfaction of the Department of Natural Resources and Water (DNR&W),
                 If DNR&W does riot consent to the private services crossing their land the applicant
                 shall find an alternative means of providing services to the balance of Lot 4 prior to
                 the use commencing.
    64. The required contributions shall be paid to Council and the associated car parking
            constructed.
.
    Additional Conditions I 6/3/10

    65, Vehicular access arrangements can be varied to allow for an alternative access
         arrangement for northern vehicle access to the site from Goodchap Street. The alternative
         access arrangement shall be generally in accordance with Drawing No. PIOC, Job No.
         06679 prepared by ToD Noosa dated 29 May 2009. The works shall include but riot be
            limited to:-

            i. The linemarking necessary to provide the right turn lane and associated medians,
            ii. The direction linemarking within the existing access,
            iii. The widening of the current vehicle crossover, and
            iv. Any works associated with the existing Telstra pit to the satisfaction of Telstra,
                  Suitable certification from Telstra shall be submitted to Council prior to the
                  commencement of any works and at the completion of the works.
            Further, a schedule of works, specifications and plans detailing this work shall be prepared
            and submitted to Council for approval as part of an application for Operational Works
    66. Where vehicular access arrangements are varied in accordance with the alternative access
         arrangements identified by Condition 65, the applicant shall design and construct an
    Docu, rend



                                                                                                           9

Page 10

       indented bus bay in Goodchap Street to replace the existing kerb side bus stop located in
       the frontages of N0 135-1 37 Goodchap Street. The works for the bus bay shall include but
       not be limited to the following:-
       i. Be located generally in accordance with Drawing No. PI OC, Job No. 06679 prepared
             by ToD Noosa dated 29 May 2009,
       ii. Be designed and constructed generally in accordance with Translink's "Regular
             Stop" as shown on Translink Drawing No. TL-R02 with the following modifications:
             a. The kerb type in the tapers must provide unimpeded access to the two affected
                 residential properties,
             b. The minimum taper on the approach should be approximately20m,
             c. The new taper should be I in 7, and
             d. The minimum length of the bus stop itself is 20m.
       Iii. The pad, seat, bin, signage and tactile indicators as shown on Translink's "Regular
             Stop" as shown on Translink Drawing No. TL-R02.
       Iv. Any modifications to and realignment of the existing residential access driveways,
       v. A 2m wide concrete footpath connecting the bus stop to the existing footpath in
             Goodchap Street.
       In this regard a schedule of works, specifications and plans detailing this work shall be
       prepared and submitted to Council as part of an application for Operational Works.

       Prior to the issue of any Building Approval and commencement of the construction of the
       multi-level car park in the northwest corner of the site, an Operational Works approval shal
       be obtained to address necessary vehicle access arrangements and additional vehide
       movements to, and within the site.




Document2



                                                                                                      10

Page 11

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

EUMUNDI ROAD
ROUNDABOUT

 

 

 

 

     
 

94

*f

     

97 [98

 

  

99 | 100

  

      

101} 102 ‘ yoq{ 104.) 106] 107) 108) 109 120 |12t

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

122 | 123 | 124

     
 
 
 
 
 

 

 

   
 
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

  
    

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

  

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

 

 

 

   
    
 
 
 

 

1
1
\ tet .. Bee" Se ete
' s * w We
eT ye S, ye Phe |
1 . S. “ppc .
4 . ” s 555 2500 TOT TT BESTS
1 s . %
TP Tv = SSS Se at g
‘ | as ‘ “ ~ = fe 7 PO] tM) 2} taf asa it8] 116
Lt lec LI Lf ys, ‘ oo
TELSTRA BUILDING fot , a “ 1
My as ~S
| fips “Hy DOUBLE CHILD CARE , rt if alle i of , ah! af eleg
~S “he ~s Oe Eire shpre pap es nas ae BT TO so as aor aati >
Si Sig CENTRE Son 8 eee inder-ground Carpark - 80 spaces
es "ag * bs, Sos ad ie 2000, 2005, 2000 a0, ee LL
i 7. ie +. me MW} 1g 12] on
% i “be — BS sos g
i = me sisi, @ 8 if 5] | | 2] rl ao
| vot] 190] Tee) 10d 16 te v0] 164] 103] v2] veil: 180 Ye veh 475] 174] 173] sze] aril ao] 6s] 10s] 16 ¥
ny how ~k 179 178 Br -|- -4- -F-l-4. a BS Si F %
ee. | ol, cisraLto —|orsaa.do * Ph -[- [pee ‘ “p59 ~| ~o0} for] say a} oe
U]\. > Sheeeo anor em Ts B00" BRD FES BED FAG S rave pean a4 00 FeO TE 05 "Hoo 6S TTS yo H
tN Se Mae ~s.& Carpark - 51cars | 0 A
Ny \ +2900 ~ 523400 ox2H00 200, 3200 >= 338001942600 = > Ls i ite
{ ‘Fh ys tno rf .
4 ! I qo2 | 198 ] 194 | 195 |196 |197 } 196 | 190 ] 200 | 20t {200 203 ans fae | ay | ame) zo] v0} an) a2) an
isfrta ts [12] TH] 4] 15] Td TT TR] V9] Toro) Texf’ Tah yg 1 s . SABLE saat
I a 242] 2a] 240] 239] 238] 297 _ 236] 235] 234] 23d] 232) at] 230 zat] ~226
- ae ai ON dd lag ado | an
ee po aan ser ar "sora a0 Be OTHE TOTS 5
es : % _- Under-ground Carpark - 69spaces. - [B.
os A My)? Scotter Pas “Ss
& 7 44g] 1-48] year] 746 Ho45. | 1244] 143 y 4 "2500x1200 7
\ro \ ™
i Ty | \ | | | iP
ql on g| | 64 1-6 1-69 1-59 72 1-56] 1-5 fs 5 137 ~ > = mp 243] 24g 245 | 266 N47 | 248g 249 Bog 2937 Age 5" 256g ine
“aco om och _brztobae — ae 57 | 28] 29] 2604 ym 263] 2647 265 | we 267 "| 269] 270] fer "| 7
Slr j 72 spaces 12@2600wide TN, Preble \ ry po Tt +
Tai 60@2400wide MEDICAL ANBPROFESSIONAL. gene 5 wal oy SITE PLAN
i Be So i CENTRE BUNDING B -- - Architects
106 4 7170 ff-69 4-68 fer |7-66 | 1-65] 1-64 | T-63 oy ~ dele] a TRADERS LANE MIDDAP ARCHITECTURE Pty Ltd
ear ~ 3} 1 1 *y \ . abn 89 671 642 980
pfu a. a oh age fit 2oi| 290] 299 N28 a7 | age} za5 | 264 | 253] 242] “2ei] go} 279f\gra| zzz] ore] 27s] 24 P.O.Box 1352
Ee SST | .q maa Cy cy Total Parking - 369 preosir aces.
H rr aT 291 existing (including 40 CCC parks) Email ~ [email protected]
x r — t Hy Sewer Mains ass > = 72 in proposed new carpark ant
‘. 2g 1 ~ Lodtign om JP-+P Survey ‘ —_ “4 6 "
i} HL AinFeb 2015 ] | ([email protected] [email protected] wide) N.C. Oler Propeniies Ile
' = | | \| 3 on one way street Goodchap Development
! SSS ! LocaTion
Ht / Edsting Tree Trunk Li Serr ee manne 3 (as 12 motorcycles) Goodchap Street
1 xisting Tree Trunk Line ; -~ ----4 Noosaville
ouncil ss DRAWING
. PROPOSED PARKING ON SITE 369
roposed OVERALL PARKING LAYOUT
ikeway ae

scale raw
41600 May 2016 PM
P

ro} NO, Dwg no.
1516 CP 2.02C-1 | 1
ie For

Page 12

   

GOODCHAP STREET

  
   
  

in accordance with,

   
       
 

 
 

.m

04 }.05 11.06
°AQ> -|~ 404-1104
sq.m} sq.mt sq.m

   
    
   
    

- - #.

1.07

430- - - .
sq.m

    
   
  

18) sq.m

   
 
 

4 +16 sq." fof outdoor @
acne Sy Ssq ~seating

     
  

6

  
     

  
  

   

 
   
 
  
  
  

| LEVEL 4
Stee ===

  

  

WY poo rs

   

i
i
1
1
1

K Sus

         

   
 
        
   
 

     

    

          
   
    

 
         

   

      

     
 
  

     

  
     

maj on ay 4] OD - aeaben--b-de-d g-o-- nerf
NOT PART OF THIS APPROVAL tiga OEY oT HT
1A 1 8 NaS) GEIR IM tN aha oN ta-npoeedntd
ee a te ao * a PODIUM LEVEL FLOOR PLAN
—" “|

   
    

  

  
 

  
 

Sy 56] 55 53] 52] Sip 50)

'
-4---4

  

© Architects
anne > MIDDAP DITCHFIELD Pty Ltd
® 8 abn 49 064 466 708

Cnr Mary and Thomas Streets
NOOSAVILLE Qld 4566

Ph - (07) 5474 0877 Fax - (07) 5474 0906
Email - [email protected]

 

 

CLIENT

N.C. Oliver Properties P/L

PROJECT

Office STAGE 2

LOCATION

Goodchap Street

Noosaville

DRAWING

Site Plan

OVERALL PODIUM LEVEL
ee 30. ae “600 May 2007 a

Proj no. Dwg no.

0427 DA02E

 

ED
Issue For 1 ?

Page 13

69

GOODCHAP STREET

10.5 al

    
    
   
 
  

Landscaping acadane Vth approved Landscaping Plan,

      
  
   

    
 

n4la.05] No de

~~ -[187sam
wsisait fe

12. 03).
2, 02 50sq.m

~2898q."0 ~

     
  

2.04

50 sq.m

    
   

    

    

   

   

carpark-RL9.3 > ~

  
  
   
   
  

NOT PART OF THIS APPROVAL

  

 
 
  
 

  

So

 
 
 
 

    
   
  

!
!
Mi
a
=e ee
ty
1

  

 

as oF i Medm NL UPPER LEVEL FLOOR PLAN
ALAN s =
103 102 101 100 9% 98 97 9 95 = . SAG----
© Architects
MIDDAP DITCHFIELD Pty Ltd
a abn 49 064 466 708

Cnr Mary and Thomas Streets
NOOSAVILLE Qld 4566

Ph - (07) 5474 0877 Fax - (07) 5474 0906
Email - [email protected]

so

 

 

CLIENT

N.C. Oliver Properties P/L
PROJECT

Office STAGE 2

LOCATION

Goodchap Street
Noosaville

DRAWING

Site Plan

OVERALL UPPER PLAN
scale date drawn

1:600  May2007 di

Proj no. Dwg no.
9427 DA03E

 

 

Issue For 3

Page 14

 

 

 

 

 

 

 

 

 

   

 

 

 

 

Lhe of balcony over

°
|
|

 

B95?

 

4)

2

14

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Architects

MIDDAP DITCHFIELD Pty Ltd

abn 49 064 466 708

Cnr Mary and Thomas Streets

NOOSAVILLE QlId 4566

Properties P/L

iver

[email protected]

Ol
Office STAGE 2

Ph - (07) 5474 0877 Fax - (07) 5474 0906
LOCATION

Email -
PROJECT

CLIENT
N.C.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Goodchap Street

Noosaville
DRAWING

STAGE 2 PODIUM PLAN

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

@
5 S
r Os 2
ir Os =
ey | 2
a TZ
i 2 <
i <x 3
fi D
i © Eu Su
/ Bo eo
n x oO a A:
5
o x ra a = 3
L---+~8) on on
os Ot
o8 08
2o £5
ti <tr
o
Ht oost
/
B
g /
of
} -8--Go
/
=
a
s
=
3 S
2 te
a

drawn
dl

date

scale

May 2007

4:250

Dwg no,

Projo,

TOTAL

DA 05E

0427

Issue

         
    

4

For

Page 15

 

 

Area of Existing Approval
Floor Space = 650sq.m

 

 

 

 

YS ‘| Area of Proposed Additional
Floor Space = 950sq.m

 

TOTAL = 1600sq.m

0

2 4 6

8

10

15

  
   
   

20

 

 

Architects
MIDDAP DITCHFIELD Pty Ltd

abn 49 064 466 708

Cnr Mary and Thomas Streets
NOOSAVILLE Qld 4566

Ph - (07) 5474 0877 Fax - (07) 5474 0906
Email - [email protected]

 

 

CLIENT

N.C. Oliver Properties P/L
PROJECT

Office STAGE 2

LOCATION

Goodchap Street
Noosaville

DRAWING

STAGE 2 UPPER FLOOR PLAN
scale fate drawn

41250 May 2007s dl

Proj no, Dwg no,
0427 DA 06 E
Issue For

5

Page 16

po

!

 

Architects
MIDDAP DITCHFIELD Pty Ltd

abn 49 064 466 708
Cnr Mary and Thomas Streets

ROOF PLAN NOOSAVILLE Qid 4566

Ph - (07) 5474 0877 Fax - (07) 5474 0906
Email - [email protected]

 

 

CLIENT

N.C. Oliver Properties P/L

 

Be PROJECT

Spent Office - Stage 2
LOCATION
Goodchap Street
Noosaville
DRAWING
Stage 2
ROOF PLAN
scale date drawn,
1:250 May 2007 dl
Proj no. Dwg no,
0427 DA 07D

Issue For 6

Page 17

                                                                                                                                                                                                                       @




                                                                                                                                                               1/11"1111/11 11




                                                                                                                                                          a^I^^
                                                                                                                                                               I^^;
                                                                                                                                                          .B^. a, ^                                                                  ----
                                                                                                                                                                                                                                   --------




                              11/1/'11iiiiiiiiiiimiiiiun!nulluniii! '.:'
                        ~,!^11^^i^.^!^.^^1.1
                                                                                                                                                                                                                           in^.^111 ^in^^.
                 I __

             'I~'




                                                                                           o
                                                                                           *                        'I
                                                                                                                                                                                                                                                  RLi8. I


               WWW111111:1111/11/11^11/11. in^\!;\I^;!;IRMll!twin111;, 11/11/1111                                                            ^, 1111/11/11^'111,111,11111,1/11/1111^,,,,,,,..__
                                                                                                                                                             ^^                                            ..--




               ,,,,,,,,,,,,!"""""";!,,,,,,,.,.,_,                                                                                         -
                                                                                                                                              ^^^^^^;:^!,^=11^^^^^^^!.
                                                                                                                                                  ---          ---                    --       ---        -
                                                                                                                                                                                                                                            it 3.1 I'M




              _ ,_:!:!!^^I^! '^^' '.,,,,,,,, .                                                                 ,.
                                                                                                                    """i^^:!^I^^^,^!^^^^^^^=!    ..            -                  -.                  ---          ,-
                                                                                                                                                                                                                                            ER 5 ,,,


                                                                                   T       I      I      ,________,__,_____.                                                                                                                                Architects
                                                                                    """""""' ^' MIDDAP DITCHFIELD Pty Ltd
                                                                                    ~~~~~~-~~--------.----~-------=---~-----==~~~=~~~~----------------~-~---------H------------J ^.. a
                                                                                                                                                                                                                                                            abn 49 064466708

                                                                                               NORTH ELEVATION                                                                                                                                              Cnr Mary and Thomas Streets
                                                                                               Scale I : 100                                                                                                                                                NOOSAVILLE Old 4566
                                                                                                                                                                                                                                                            Ph - (07) 5474 0877 Fax - (07) 5474 0906
                                                                                                           @             @                               @                                    @                    @           o                            Email - madarc@o2email. coin. au
                                                                           18.1

                        ^,=.
                                                             ^
                                                             ^
                                                                                                      'I'
                                                                                                                                    ,,.
                                                                                                                                                    ------
                                                                                                                                                           *-
                                                                                                                                                                                      ^.. ^
                                                                                                                                                                                                      _ , _ ^12. .,        '   F'                           CLIENr


                                                             .                                                                        ^..^..^,', * , . _                                              -^ ^ ^ ^                                              N. C. Oliver Properties PIL
                                                             ^                                                                    -------.---
                                                                                                                                                                                      ^      ^        ^   --   ^                                            PROJECT
                                                             .

                                                             ^                                                                 once Space                                                                                                                   Office - Stage 2
                                                                                                                                  '13/6                                                                                                                     LOCAnON

                                                                                                                                                                                                      ,,..,.,.*^^~,'. *^Z,
                                                           ^!^!="' .I. E-Sill^!^!^I,
                                                           ip ~..^L!     11 .,,.,,,,ip.' I                                                         I I                                 Office Space
                                                                                                                                                                                                          ----------                                        Goodchap Street
                                                                                                                                                                                                                                                            Noosaville
                                                                                                                                                                                                                                                            DRAWING
      Childcare A - RL 9.60                                                                                                                                                              .*"
                                                                                                                                                                                                                                                            Existing approved
                                                                                  ^,^:I.                                                                                                                                                                    ELEVATIONS + SECTIONS



I~~
                                                                                                               ^^^


                                                                                                                           C it ~~~
                                                                                                                         I Carpal ~                                              ^-
                                                                                                                                                                                                                                                            eral.       date           draml
                                                                                                                                   ."
                                                                                                                                                                                                                                                            1:250           May 2007   dl
                                                                                                                                                                                                                                    -   -   ---^
                                                                                                                                                                                                                                                            PI^ he                     009 co.
                                                                                                                                                                                                                                                            0427                       DA 08 D
                                                                                                                             Seal, I : 100                                                                                                                  100ue     Fin
                                                                                                                                                                                                                                                                                                       7

Page 18

)

 

    

 

 

 

 

 

RL9.5_Podtum Level

]

RL 5.8 _carparkLevel

 
  
  

1 | 1
! SOUTH ELEVATION
1 I

Scale 1: 100

ALIA i i ' i

 

LAA Upper Level 1 RL. pert
I

RL9,5_Podtum evel

_ RL 9.5 Pode Level i

i
I
i
i
i
i
i
1
1
t
t
I

 

ofl 5.8 Cupark Level

ALS.8_Capak Love
eee

'
1
r
t

 

 

   

WEST ELEVATION

Scale 1: 100

EAST ELEVATION

Scale 1: 100 '

I
1
1
I

OD

! 1 1
! | | \ \ i } ! 1 1

RL 5.8 Carpark Level

{NORTH ELEVATION

' Scale 1: 100

 

  

 

Office Space

L130

   
 
 

Office Space
AL9.SO

 

   

 

1 1
1 1

SECTION B-B | i I i

Scale 1: 100

Sees

° Architects
MIDDAP DITCHFIELD Pty Ltd

abn 49 064 466 708

Cnr Mary and Thomas Streets
NOOSAVILLE Qld 4566

Ph = (07) 5474 0877. Fax - (07) 5474 0906
Email - [email protected]

 

CLIENT

N.C. Oliver Properties P/L
PROJECT

Office - Stage 2

LOCATION

Goodchap Street

Noosaville
DRAWING

Proposed
ELEVATIONS + SECTIONS
scale

4:250

Proj no.
0427

Issue

date

May 2007

drawn

dl
Duig no.
DA 09 D

For

8

Page 19

~ SE wn

Sd veep eo eer

| a

 

AQVNIATTA ad -smors voig

oN BWA

 

_@

S98006ds GR"

 

 

 

 

 

Yoreyy ‘ANNO

OL8SSIdS YO ZBI s}O7 Buysouog

NILNVMZL “HSIN

Aaw uo sig, ‘Vase ay} JO JJOd jasd9} ut UD S} aot Sty

|
jonoidde youn[7 Jo woroAAsues Surinp 20320 ADU JOY?
ODIO} BUD aZ'S ‘BOOYS JOs a} Sj yaupUaiE Aun 0,
AYPYUSUOSSHS OU S}IIIIO OP] AI PHicf WP MAF ne

84S Bl] UO So} pasodosd ai go azis pud vonHa0f

 

 

 

 

     

 

 

poprjou Sureg a208 Si JRAYIM P2ITpOLds4 OG joy :

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

evdsetds card ny Bsn go soci 4 6)
if nee
y IO, UI ‘ .
CaVONVLS youn, (P2}914ASE4) G JUL RG  $}07 JO udjd
OOO TST ‘a109g .
“panesesubuadooajojg = wage. | i I TP aujoo 7 T I a I Te al
oF
of
a3
= Ra
b S_rH
o ga
NL
o : 3
~ = Oy a
Sta a x
z 3 .
| wm:
are . Ss
a & 2 x
ar Ss & "3
L° ¥ :
or . ci gS
. = a~ iy
aL 8 Boy sm CO OS
"| § gs z Raz
yo ® = N
a Se ge as SS 38 BGT SZ:
al-# NS gr RES ho ERNE OY
Pe 2,» T= AA 4 .
ol e3 oN <a, " Py 2
° a — A XC) & WY  - 5
= S _ oy “ A y 2 *
ats — 2
= : Se: “
er oo. _ a» NP _ on eb e ee
a= & .
Sr go &/ a
- a8 sé
a ts
af?
§ 7 az i
% aN
‘2
a gy Sy ,
SS az ral Ne, GY 9
< J es “ x gy oe ;
Im a? 355 SS / we
a2 & * §
gs 8 SE Ca &
a @ OR Feces os es [oe [tm
: g ° e283 A? ay a
x = > re 44 hs 1S
\ 3 ay = 2 g > a y nq
Ce oA 8 RRB
A £ i ¥ oh val a me ‘
Po o” 8 taf
o Q Sek
| = ae Eatiea ed
[ooo ef se eet ce ier eee eRe ke La,
22 75g bat
9005 pant ~ Poe,
. Fu rea Ne
Ei bs KE
yp, 2S Sele
NO0S 4 o> =P
®C4p ze S
ag
Os
<2
Ro
or
= = =
Tt ‘
yo [39045 N¥1d ASAYNS

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.