Sealed Final Judgment
TOTAL Contribution Amount = $ 70,745 $ 40,5.2 $ 111,257
Please note, that these amounts are all subject to variations in the Consumer Price
Index, All Grou s Brisbane from SEPTEMBER 2008 until the date of a merit.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works for the relevant stage.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should not
be paid at the due time, Council shall call upon the trading bank guarantee in full.
Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council's Land
Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses
or is cancelled, the paid contributions and/or the trading bank guarantee will be returned.
General
56. A suitably qualified Registered Professional Engineer shall prepare engineering drawings
and specifications for all engineering works that will become Council infrastructure, which
shall be submitted in conjunction with an application for a Development Permit for
Operational Works. To avoid conflict with underground pipes or services, all existing and
proposed services required by the development shall be shown on the plans.
57. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
58. The transportation of all materials to and from the site shall be undertaken in a manner
such that no particle matter escapes onto a public road. All vehicles carrying materials
either to or from the site shall be covered to prevent materials including dust being
windblown from the vehicle.
Environmental Health
59. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy No. 9 "Waste Management Multi-Dwellings and Commercial and
Industrial Premises", including an external imperviously paved area correctly sized for all
refuse and recycling containers and suitably screened from public places and neighbouring
properties.
60. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulations 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
61. All refrigeration plant including motors, shall be situated within the building or suitably
provided with noise reduction measures and located as to prevent a noise nuisance
beyond the subject land in accordance with the nuisance provisions of the Environmental
Protection Regulation 1998. On the spot fines apply for such offences.
62. Noise emission from air conditioning equipment shall comply with the following
requirements:
62.1. The equipment shall be installed and located in a manner which prevents noise
nuisance beyond the subject land in accordance with the nuisance provisions of the
Environmental Protection Regulation I 998 and Council's Local Law No. I2 - Control
of Nuisances. Infringement Notices (on-the-spot fines) may apply for offences.
62.2. Submission of written certification from a suitably qualified person confirming that the
noise levels comply when measured at the nearest residential boundary. This is
required immediately after installation of the equipment and prior to any occupation
of the building, and in a format approved by Council.
DocumentZ
8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Sealed Final Judgment.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.