Skip to the record
The gold standard in government transparency.

Council archive · source document

Approved Plans and Documents - OPW22/0303

of 104

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (15.4 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 2, section 1. The text section number identifies this passage in the reader.

                          GENERAL NOTES                                        ENVIRONMENTAL CONDITIONS                             EROSION AND SEDIMENT                                    SOFT SPOTS AND / OR LOOSE AREAS WHICH DO NOT
                                                                                                                                                                                            IMPROVE WITH COMPACTION ARE TO BE EXCAVATED TO A
                                                                                                                                                                                                                                                  ALL PAVEMENT GRAVELS & TRENCHES SHALL BE BACK
                                                                                                                                                                                                                                                  FILLED IN LAYERS NOT EXCEEDING 150mm COMPACTED
                                                                                                                                                                                                                                                                                                       STORMWATER DRAINAGE NOTES                            PAVEMENT AND SIGNAGE NOTES
                          PRIOR TO COMMENCEMENT OF WORKS THE                   VEGETATION PROTECTION
                                                                                                                                    CONTROL PROGRAM                                         MINIMUM DEPTH OF 500mm AND REPLACED. THESE AREAS
                                                                                                                                                                                            ARE TO BE INSPECTED BY A GEOTECHNICAL ENGINEER
                                                                                                                                                                                                                                                  THICKNESS TO NOT LESS THAN:
                                                                                                                                                                                                                                                                                                       ALL STORMWATER DRAINAGE PIPES 225Ø OR SMALLER        ALL PAVEMENT MARKING AND SIGNAGE TO BE IN
                          CONTRACTOR IS TO IDENTIFY AND BE SATISFIED OF THE                                                                                                                 TO ASSESS WHETHER FURTHER EXCAVATION IS               LOCATION          DENSITY     FREQUENCY              SHALL BE CLASS '2' RCP OR CLASS DWV uPVC.            ACCORDANCE WITH THE D.O.T. AND AS 1742 MANUAL FOR
                                                                               TREES LOCATED ALONG THE FOOTPATH SHOULD BE,
                          CORRECT LOCATION OF ALL EXISTING SERVICES            WHERE POSSIBLE TRANSPLANTED PRIOR TO                 GENERAL                                                 REQUIRED OR IF OTHER MEASURES (SUCH AS                UNDER ROADS     98% SMDD  1 TEST PER 2 LAYERS                                                             UNIFORM TRAFFIC CONTROL DEVICES.
                          WHETHER INDICATED OR NOT ON THE PLANS. ANY           CONSTRUCTION, OR REPLACED IF DESTROYED.                                                                      CONSTRUCTION OF A BRIDGING LAYER ) CAN BE                                       PER 40m WITH AT            ALL STORM WATER PIPES 300Ø OR GREATER SHALL BE
                                                                                                                                    1. PRIOR TO COMMENCING WORK ON SITE THE                                                                       A) >500mm BELOW
                          DAMAGE TO EXISTING SERVICES IS TO BE RECTIFIED AT                                                                                                                 ADOPTED. SELECT REPLACEMENT MATERIAL TO BE                                                                 CLASS '2' RCP UNLESS NOTED OTHERWISE.                ALL SIGNS TO BE SIZE SIZE A.
                          THE CONTRACTOR'S EXPENSE.                                                                                 CONTRACTOR SHALL ERECT AND/OR CONSTRUCT ALL                                                                   SUBGRADE                  LEAST 1 TEST IN 5
                                                                               WHEN WORKING WITHIN 4m OF TREES, RUBBER OR                                                                   (MINIMUM CBR15) PLACED IN LAYERS NOT EXCEEDING                                  BEING ADJACENT TO
                                                                                                                                    ENVIRONMENTAL       CONTROLS (SEDIMENT FENCES,                                                                                                                                                                          FOR SIGNAGE AND ASSEMBLY DETAILS REFER TMR
                                                                               HARDWOOD GIRDLES SHOULD BE CONSTRUCTED WITH
                                                                                                                                    DIVERSION DRAINS AND SEDIMENT BASINS) AS SHOWN
                                                                                                                                                                                            150mm COMPACTED THICKNESS, COMPACTED TO THE           B) <500MM BELOW 100% SMDD
                                                                                                                                                                                                                                                                            A MANHOLE OR
                                                                                                                                                                                                                                                                                                       FRC PIPES SHALL NOT BE USED.
                          ANY WORK ON EXISTING SERVICES THAT REQUIRE           1.8m BATTENS CLOSELY SPACED AND ARRANGED                                                                     COMPACTION REQUIREMENTS.                              SUBGRADE                                                                                                  MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
                          RELOCATION BY AUTHORITIES SHALL BE CARRIED OUT BY                                                         ON MPN DRAWING 8662-ES.1.101C. RECEIVING WATERS                                                                                         GULLY
                          THE RELEVANT AUTHORITY BUT WITHIN TERMS OF THE
                                                                               VERTICALLY FROM GROUND LEVEL. GIRDLES MUST BE                                                                4. FILL MATERIAL                                      C) PAVEMENT     95% MMDD
                                                                                                                                                                                                                                                                                                       ALL STORMWATER PIPES 675Ø OR GREATER SHALL BE
                                                                                                                                                                                                                                                                                                                                                            FOR ROADWORK DELINEATOR DETAILS REFER TMR
                                                                               STRAPPED TO TREES PRIOR TO CONSTRUCTION AND          ARE TO BE TESTED FOR pH, TURBIDITY AND TSS AND                                                                                                                     FLUSH JOINTED.
                          CONTRACT AND SHALL BE CO-ORDINATED BY THE                                                                                                                         IMPORTED FILL MATERIAL SHALL BE APPROVED                                                                                                                        MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES.
                                                                               REMAIN UNTIL COMPLETION.                             LOGGED IN THE ENVIRONMENTAL LOG.                        GRANULAR MATERIAL FREE OF VEGETABLE MATTER AND        ELSEWHERE         98% SMDD    1 TEST PER LAYER
                          CONTRACTOR.                                                                                               2. ALL RUNOFF FROM THE SITE IS TO BE DIRECTED TO THE                                                                                                               ALL STORMWATER PIPES 600Ø OR SMALLER SHALL BE
                                                                                                                                                                                            CONFORMING TO THE FOLLOWING:-                                                       PER 200m
                                                                               WHERE POSSIBLE, TREE ROOTS SHOULD BE TUNNELLED       RELEVANT ENVIRONMENTAL CONTROL DEVICE PRIOR TO                                                                                                                     RUBBER RING JOINTED.                                 EXISTING PAVEMENT MARKING ARE TO BE REMOVED BY
                          PRIOR TO COMMENCEMENT OF WORKS THE                                                                                                                                AS SIEVE                       % PASSING                                                                                                                        GRINDING.
                                                                               UNDER, RATHER THAN SEVERED. IF ROOTS ARE SEVERED     DISCHARGING FROM THE SITE.                                                                                    SMDD - STANDARD MAXIMUM DRY DENSITY
                          CONTRACTOR WILL PROVIDE SCOUR AND EROSION                                                                                                                         75mm                           100
                                                                               THE DAMAGED AREA SHOULD BE TREATED WITH A                                                                                                                          MMDD - MODIFIED MAXIMUM DRY DENSITY                  ALL STORMWATER BEDDING SHALL BE TYPE 'H2' U.N.O.
                          PROTECTION INCLUDING PROVISION OF SEDIMENT TRAPS                                                          3. DURING THE CONSTRUCTION PROGRAM THE                  4.75mm                         30 - 100                                                                                                                         LINE MARKING SHALL BE DULUX ROADMASTER WATER
                                                                               SUITABLE FUNGICIDE. CONTACT COUNCIL ARBORIST FOR                                                             0.075mm                        3 - 30                 (AS PER AS. 1289)
                          AND FENCES TO MINIMISE DEPOSITION OF MATERIAL                                                             CONTRACTOR SHALL INSPECT ALL ENVIRONMENTAL                                                                                                                                                                              BASED PAVEMENT MARKING OR APPROVED EQUIVALENT.
                                                                               FURTHER ADVICE.                                                                                              LIQUID LIMIT                   35% MAX.                                                                    1m SUBSOIL LEAD IN TO PITS AND MANHOLES IS
                          ONTO DOWNSTREAM OF THE PROPERTY AS INDICATED                                                              CONTROL DEVICES ON A WEEKLY BASIS AND AFTER EACH                                                              PAVEMENT MATERIALS SHALL BE COMPACTED AND
                                                                                                                                                                                            PLASTICITY INDEX               15% MAX.                                                                    REQUIRED IN ALL STORMWATER TRENCHES.
                          ON THE DRAWINGS.                                                                                          MAJOR STORM EVENT (IE. RAINFALL EXCEEDING 25mm IN                                                             MAINTAINED AT MOISTURE CONTENTS AT PLACEMENT
                                                                               ANY TREE LOPPING REQUIRED SHOULD BE UNDERTAKEN
                                                                               BY COUNCIL'S RECOMMENDED TREE SERVICES.              24 HOURS). ANY RECTIFICATION OF DAMAGE TO THE
                                                                                                                                                                                            CBR                            5% MIN.
                                                                                                                                                                                                                                                  WITHIN THE RANGE OF 2% WET TO 2% DRY OF STANDARD     FILL BETWEEN MULTI CELL BOX CULVERTS TO BE DRY
                                                                                                                                                                                                                                                                                                                                                            MAINTENANCE NOTES - DEFECTS
                          THIS DRAWING SHALL BE READ IN CONJUNCTION WITH                                                                                                                    LINEAR SHRINKAGE               8% MAX.
                                                                                                                                                                                                                                                  OPTIMUM MOISTURE CONTENT U.N.O
                          ALL OTHER WORKING DRAWINGS, SPECIFICATIONS AND       SOIL                                                 ENVIRONMENTAL CONTROL DEVICES OR CLEANING OUT           TEST CERTIFICATES ON THE TEST FILL MATERIAL SHALL                                                          LEAN MIX.                                            LIABILITY
                                                                               TOPSOIL AND SUBSOIL SHOULD BE STOCKPILED             OF THE DEVICES IS TO BE CARRIED OUT BY THE              BE SUPPLIED TO THE SUPERINTENDENT FOR APPROVAL
                          REPORTS AND WITH SUCH            OTHER WRITTEN                                                            CONTRACTOR AS REQUIRED.                                                                                       TRENCH BACKFILL TESTING SHALL BE CARRIED OUT ON      BITUTHENE TAPE TO BE USED ON BOX CULVERT JOINTS.
                          INSTRUCTIONS AS MAY BE ISSUED DURING THE COURSE      SEPARATELY. CARE SHOULD BE TAKEN TO PREVENT                                                                  PRIOR TO THE USE OF THE FILL MATERIAL.                                                                                                                          SUCH MAINTENANCE SHALL BE CARRIED OUT IN
                                                                                                                                                                                                                                                  EACH ALTERNATE COMPACTED LAYER AT MAXIMUM 50m
                          OF CONSTRUCTION.        ALL DISCREPANCIES AND        SEDIMENT FROM ENTERING THE STORMWATER SYSTEM.        SEDIMENT BASIN                                                                                                CENTRES AND NO MORE THAN 3m FROM MANHOLE             ALL DOWN PIPE CONNECTIONS SHALL BE PVC PIPE,         ACCORDANCE WITH THE PROVISIONS OF THE GENERAL
                                                                               THIS MAY INVOLVE PLACING APPROPRIATE SEDIMENT                                                                ALL FILL MATERIAL INCLUDING ROAD PAVEMENT U.N.O. IS                                                                                                             CONDITIONS OF CONTRACT WITH RESPECT TO MAKING
                          VARIATIONS SHALL BE REFERRED TO THE ENGINEER                                                              1. WITHIN 36 TO 48 HOURS AFTER EACH STORM EVENT                                                               STRUCTURE.                                           RUBBER RING JOINTED CLASS DWV
                                                                               CONTROLS AROUND STOCKPILES.                                                                                  TO BE PLACED IN LAYERS NOT EXCEEDING 150mm                                                                                                                      GOOD DEFECTS AND OTHER FAULTS DUE TO FAULTY
                          BEFORE PROCEEDING WITH THE WORK.                                                                          THE WATER IN THE SEDIMENT BASINS IS TO BE TESTED
                                                                               REHABILITATION                                                                                               COMPACTED THICKNESS AND COMPACTED TO THE                                                                                                                        REPAIR AND/OR WORKMANSHIP AND SHALL INCLUDE
                                                                                                                                    FOR TURBIDITY. SHOULD THE SUSPENDED SOLIDS OF                                                                 PAVEMENT MATERIAL CERTIFICATES AND GRADINGS ARE      DE-WATERING WHERE REQUIRED TO BE AT THE
                          ALL LEVELS ARE TO BE TO A.H.D LEVEL DATUM.                                                                                                                        FOLLOWING DENSITIES:                                                                                                                                            CLEANING UP AND REPAIR DUE TO STORM DAMAGE.
                                                                               PRE-DISTURBANCE SOIL PROFILES AND COMPACTION         THE WATER EXCEED 50MG/LITRE THEN THE WATER IS TO                                                              TO BE PROVIDED TO THE SUPERINTENDENT FOR             CONTRACTORS COST.
                          P.S.M. SURVEY ORIGIN IS PERMANENT BENCHMARK NO.      LEVELS ARE TO BE REINSTATED.                                                                                  BUILDING AREA    100% MAXIMUM DRY DENSITY            APPROVAL PRIOR TO CONSTRUCTION.
                                                                                                                                    BE TREATED WITH GYPSUM AT THE RATE OF 32Kg / 100m3                                                                                                                                                                      THE DEFECTS LIABILITY PERIOD SHALL BE FOR TWELVE
                          56522, RL 7.30m LOCATED PRODUCTION STREET.                                                                TO SETTLE OUT THE SUSPENDED SOLIDS. WATER IS TO                                STANDARD COMPACTION                                                                 ALL CONNECTIONS FROM DOWN PIPES TO MAIN DRAIN
                                                                               PRE-DISTURBANCE VEGETATION PATTERNS SHOULD BE                                                                                                                      PAVEMENT MATERIAL SHALL EXTEND 150mm BEHIND          LINES SHALL BE MADE WITH MANUFACTURED FITTINGS       MONTHS FROM THE DATE OF PRACTICAL COMPLETION.
                          CONTACT BENNETT AND FRANCIS PTY LTD ON Ph. (07)                                                           BE RETESTED PRIOR TO RELEASE.
                                                                               RESTORED. FOR FURTHER INFORMATION CONTACT                                                                     UNDER ROADS     98%     MAXIMUM DRY DENSITY          KERB AND KERB AND CHANNEL.                           UNLESS NOTED OTHERWISE.
                          3239 5444 FOR MORE INFORMATION.                                                                           THE pH OF WATER IS TO BE TESTED. IF THE pH IS OUTSIDE
                                                                               COUNCIL ECOLOGICAL ASSESSMENT OFFICER.                                                                        A) >500mm BELOW         STANDARD COMPACTION
                          STORMWATER SURVEY WAS CARRIED OUT BY NORRIES                                                              OF THE RANGE 6.5 pH TO 8.5 pH UNITS IT SHALL BE          SUBGRADE                                             WHERE NEW PAVEMENT JOINS EXISTING PAVEMENT THE       INVERT LEVELS SHOWN ON PLAN ARE AT PIPE /
                          CLARKE & O'BRIEN PTY LTD, CONTACT ON Ph. (07)        NOTE: ALL ENVIRONMENT PROTECTION MEASURES            TREATED TO BRING IT WITHIN THIS RANGE.                                                                        EXISTING PAVEMENT IS TO BE SAW CUT AS INDICATED TO
                                                                                                                                                                                             B) <500MM BELOW 100% MAXIMUM DRY DENSITY                                                                  STRUCTURE JUNCTION.
                          30120000 FOR MORE INFORMATION.                       SHOULD BE IMPLEMENTED PRIOR TO ANY CONSTRUCTION      WHEN THE SUSPENDED SOLIDS LEVEL IS ACCEPTABLE                                                                 PROVIDE A NEAT STRAIGHT LINE.
                                                                               WORK, INCLUDING CLEARING, COMMENCING.                THE WATER IS TO BE RELEASED OR PUMPED OUT                SUBGRADE             STANDARD COMPACTION                                                                  PIPE LENGTHS SHOWN ON PLAN / LONG SECTION ARE TO
                          A SOILS INVESTIGATION HAS BEEN CARRIED OUT BY CORE                                                        ENSURING CAREFUL ATTENTION NOT TO DISTURB THE                                                                 ALL FINISHED SURFACE LEVELS ARE SHOWN AT THE LIP     CENTRE OF STRUCTURE.
                          CONSULTANTS PTY LTD , REFERENCE No.                                                                                                                               REFER TO GEOTECHNICAL REPORT AND SPECIFIC CASE        OF THE KERB AND CHANNEL OR THE NOMINAL FACE OF
                          J001701-006-R-Rev1, DATED OCT, 2022                  EROSION AND SEDIMENTATION                            SETTLED SEDIMENT.
                                                                                                                                    2. WHEN THE DEPTH OF SEDIMENT IN THE BASE OF ANY
                                                                                                                                                                                            FILL SHALL BE COMPACTED AND MAINTAINED AT             THE KERB UNLESS NOTED OTHER WISE.                    MINIMUM COVER TO STORMWATER PIPES TO BE AS
                                                                                                                                                                                            MOISTURE CONTENTS AT PLACEMENT WITHIN THE RANGE
                          THIS REPORT MUST BE READ IN ITS ENTIRETY PRIOR TO
                          CONSTRUCTION BEING UNDERTAKEN.
                                                                               CONTROL NOTES                                        SEDIMENT BASIN EXCEEDS 300mm, THE BASIN OR DAM          OF 2% WET TO 0% DRY OF STANDARD OPTIMUM               KERB AND KERB AND CHANNEL TO BE IN ACCORDANCE
                                                                                                                                                                                                                                                                                                       FOLLOWS:
                                                                                                                                                                                                                                                                                                       PIPES IN ROADWAYS - 600mm COVER
                                                                                                                                    SHALL BE DRAINED AND THE SEDIMENT EXCAVATED AND         MOISTURE CONTENT U.N.O. (REFER GEOTECHNICAL           WITH IPWEA STANDARD DWG NO. RS-080.                  PIPES IN LANDSCAPE AREAS - 450mm COVER U.N.O.
                                                                               ALL WORK TO BE IN ACCORDANCE WITH THE                REMOVED FROM SITE BY THE CONTRACTOR.                    REPORT AND SPECIFIC CASE.)
                          ALL WORK TO CONFORM TO NOOSA SHIRE COUNCIL                                                                                                                        5. GEOTECHNICAL INSPECTIONS AND TEST
                                                                               INTERNATIONAL EROSION CONTROL ASSOCIATION            ENVIRONMENTAL LOG                                                                                             KERB RAMPS ARE TO BE IN ACCORDANCE WITH NOOSA        ALL STORMWATER MANHOLES SHALL BE IN ACCORDANCE
                          STANDARDS AND SPECIFICATIONS UNLESS OTHER WISE
                                                                               GUIDELINES.                                                                                                  CERTIFICATES                                          SHIRE COUNCIL STANDARD DWG NO. NSD-9006E.            WITH IPWEA STANDARD DWG NO. DS-010.
                          SHOWN ON PLANS OR DIRECTED BY THE                                                                         1.THE CONTRACTOR SHALL MAINTAIN A DEDICATED ON
                          SUPERINTENDENT.                                                                                           SITE ENVIRONMENTAL LOG WHICH NOTES ALL WATER            COMPACTION TESTS. TO BE CARRIED OUT IN
                                                                               IF DIRECTED BY THE ENGINEER, TOPSOIL STOCKPILES                                                              ACCORDANCE WITH AS 3798 (REFER TO GEOTECHNICAL        WHERE COUNCIL STANDARD DOES NOT NOMINATE             ALL STORMWATER TO         HAVE   A   HEAVY    DUTY
                                                                               ARE TO BE SOWN WITH A COVER CROP AS SOON AS          QUALITY SAMPLING AND MONITORING DATES, RESULTS                                                                CONSTRUCTION METHODS OF CONCRETE KERB
                          SETOUT OF CARPARK BAYS AND AISLES BY ARCHITECT'S                                                                                                                  REPORT AND SPECIFIC CASE).                                                                                 TRAFFICABLE LID U.N.O.
                                                                               PRACTICAL AFTER STOCKPILING.                         AND MAINTENANCE RECORDS.                                                                                      SECTIONS TOOLED GROOVE JOINTS ARE TO BE PLACED
                          U.N.O.                                                                                                    IT SHALL INCLUDE ALL       RELEVANT INFORMATION                                                                                                                                                                                                                          NOOSA COUNCIL
                                                                                                                                                                                            'LEVEL 1' GEOTECHNICAL SUPERVISION AS DEFINED IN      AT 3m MAXIMUM CENTRES. PLACE ADDITIONAL JOINTS TO    ALL STORMWATER GULLY PITS SHALL BE ACCORDANCE
                                                                               NO DISTURBANCE TO VEGETATION IS TO TAKE PLACE        PERTAINING TO INSPECTION AND MAINTENANCE OF             SECTION 8 OF AS 3798 GUIDELINES OF EARTHWORKS FOR     KERBS, MEDIANS, INVERTS IN THE SAME LOCATION AS      WITH IPWEA STANDARD DWG NO. DS-060.                                                                   APPROVED PLAN
                          ALL 'WORKS AS CONSTRUCTED' INFORMATION SHALL BE
                                                                               BEYOND THE BOUNDARIES OF THE CURRENT STAGE OF        DEVICES, DATES OF RAINFALL WATER QUALITY TESTING,       COMMERCIAL AND RESIDENTIAL DEVELOPMENTS, SHALL        THE JOINTS IN THE CONCRETE PAVEMENTS WHERE                                                                                                              OPW22/0303 21 APR 2023
                          SUPPLIED IN BOTH HARD COPY AND ELECTRONIC DATA
                                                                               DEVELOPMENT.                                         BASIN DEWATERING                                        BE PROVIDED UNDER ALL BUILDING AREAS AND ROADS.       APPLICABLE.                                          KERB ADAPTERS SHALL BE PROVIDED IN KERB AND
                          FORMAT     TO    THE    RELEVANT    AUTHORITIES
                                                                               SEDIMENT IS TO BE PREVENTED FROM ENTERING            (DEWATERING OF BASINS AND DAMS MUST INCLUDE A                                                                                                                      CHANNEL IN ACCORDANCE WITH NOOSA SHIRE COUNCIL
                          REQUIREMENTS.
                                                                               STORMWATER GULLY PITS BY PLACING A PORTABLE                                                                  THE CONTRACTOR SHALL BE RESPONSIBLE FOR               SUBSOIL DRAINS SHALL BE MIN 100Ø CORRUGATED          REQUIREMENTS.
                                                                               SEDIMENT BARRIER.                                    SPACE FOR SIGN OFF BY THE CONTRACTOR THAT WATER
                                                                                                                                                                                            ORGANISING THE COMPACTION TESTS AND APPOINTING        POLYETHYLENE PIPE TO AS 2439 AND CONSTRUCTED IN
                          DIMENSIONS SHALL NOT BE OBTAINED BY SCALING THE                                                           QUALITY RESULTS ARE WITHIN APPROVED LIMITS.)                                                                                                                                                                                                          CONSULTANT: MPN CONSULTING PTY LTD
                                                                                                                                                                                            THE GEOTECHNICAL SUPERVISION UTILISING THE            ACCORDANCE WITH NOOSA SHIRE COUNCIL STANDARD         THE CONTRACTOR SHALL BE RESPONSIBLE FOR
                          DRAWINGS.
                                                                               DURING CONSTRUCTION, TEMPORARY DIVERSION                                                                     ENGINEER WHO COMPLETED THE SITE INVESTIGATION IN      DWG.                                                 LOCATING GULLY PITS IN RELATION TO THE NOMINAL                                     CONTACT: LACHLAN STEPHENSON
                                                                               DRAINS, SEDIMENT FENCES AND, OR SEDIMENT TRAPS       THE ENVIRONMENTAL LOG SHALL BE KEPT ON SITE AND                                                                                                                    FACE OF KERB AND KERB AND CHANNEL.
                          'U.N.O.' STANDS FOR UNLESS NOTED OTHERWISE.                                                                                                                       ACCORDANCE WITH AS 3798                                                                                                                                                                       (RPEQ 16903)
                                                                               ARE TO BE CONSTRUCTED AT REGULAR INTERVALS DOWN      IS TO BE MADE AVAILABLE FOR INSPECTION BY COUNCIL                                                             SUBSOIL DRAINS ARE TO BE USED IN ALL AREAS, EXCEPT
                                                                               SLOPE PRIOR TO ANY BREAKS IN CONSTRUCTION (SUCH      OFFICERS AT ALL TIMES.                                  6. SERVICES                                           WHERE SUBSOIL DRAINS ARE SHOWN BENEATH               MINIMUM COVER TO ROOF WATER PIPES TO BE 450mm                                      TELEPHONE: (07) 3335 4595
                          IN CASE OF DOUBT, ASK!                               AS A WEEKEND) OR IF RAIN IS IMMINENT.                                                                        PRIOR TO THE COMMENCEMENT OF WORKS THE                TRAFFICABLE AREAS THE PIPES ARE TO BE WATER TIGHT    EXCEPT WHERE LESS COVER IS NECESSARY TO
                                                                                                                                                                                            CONTRACTOR IS TO IDENTIFY AND BE SATISFIED OF THE     UPVC CLASS PN12 OR RCP CLASS 2.
                         IMPORTANT SAFETY NOTICE                                                                                                                                                                                                                                                       DISCHARGE TO STREET KERB AND CHANNEL.                                                                                        DATE 25.11.2022
                                                                               INSTALL SEDIMENT FENCES TO CONTROL SHEET FLOW        BULK EARTHWORKS NOTES                                   CORRECT LOCATIONS OF ALL EXISTING SERVICES
                                                                               OR SEDIMENT TRAPS TO CONTROL CONCENTRATED                                                                    WHETHER INDICATED OR NOT ON THE PLANS. ANY            SUBSOIL DRAIN CLEAN OUTS ARE TO CONSTRUCTED IN       THE CONTRACTOR SHALL VERIFY THE INVERT LEVEL AT
                          MPN CONSULTING PTY LTD RECOGNISES THE                FLOW.                                                                                                        DAMAGE TO EXISTING SERVICES IS TO BE RECTIFIED AT     ACCORDANCE WITH TMR STANDARD DRAWING NO.             THE CONNECTION WITH EXISTING STORMWATER PIPES
                          IMPORTANCE OF OCCUPATIONAL HEALTH AND SAFETY.
                                                                                                                                    1. GENERAL                                              THE CONTRACTORS EXPENSE.                              SD1116 AND PLACED AT 50m MAXIMUM CENTRES..
                                                                                                                                    EARTHWORKS SHALL BE CARRIED OUT IN ACCORDANCE                                                                                                                      PRIOR TO LAYING PIPES.
                          HOWEVER, MPN CONSULTING PTY LTD HAS NOT BEEN         SERVICE TRENCHES ARE TO BE REVEGETATED WITH                                                                  THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE SET
                                                                               GRASS SODS AND TOPSOIL SAVED DURING EXCAVATION       WITH THE PROCEDURES SET DOWN IN AS 3798                 OUT OF ALL SERVICES & AUXILIARY ITEMS WITHIN THEIR    ALL SAFETY SIGNS AND BARRICADES SHALL BE ERECTED
                          ENGAGED TO DEVELOP, CHECK, SUPERVISE OR CONTROL                                                                                                                                                                                                                              ALL TRENCHES SHALL BE BACK FILLED UNDER THE ROAD
                          WORKERS OR METHODS OF WORK.                          OF THE TRENCHES (AS APPROPRIATE)                     GUIDELINES ON EARTHWORKS FOR COMMERCIAL AND             CORRECT ALLOCATION AREA.                              TO COMPLY WITH TMR STANDARDS AND AS 1742.
                                                                                                                                    RESIDENTIAL DEVELOPMENTS.                                                                                                                                          IN LAYERS NOT EXCEEDING 150mm COMPACTED
                                                                               CUT AND FILL BATTERS ARE TO BE STABILISED WITH TOP                                                                                                                                                                      THICKNESS NOT LESS THAN 100% MAXIMUM DRY DENSITY
                          MPN CONSULTING PTY LTD DOES NOT HAVE THE             SOIL AND SEEDED AS SOON AS PRACTICAL.
                                                                                                                                    A LAYER OF 100mm THICK ROADBASE MATERIAL MINIMUM
                                                                                                                                                                                            ROADWORKS NOTES                                       WHERE LANDSCAPING IS REMOVED IN NEW PAVEMENT         STANDARD COMPACTION TEST (AS 1289).
                          CAPACITY OR AUTHORITY TO CONTROL WORKERS OR                                                                                                                                                                             AREAS EXCAVATE 500mm MINIMUM BELOW UNDERSIDE OF
                                                                                                                                    CBR 15 IS TO BE PLACED AND COMPACTED ON BUILDING                                                              NEW PAVEMENT TO REMOVE ALL ROOT AND ORGANIC                                                                                              2      25.11.22 FOR APPROVAL                                          KC      LS
                          METHODS OF WORK.                                                                                                                                                  FILL AND SUB GRADE SHALL BE COMPACTED AS DETAILED                                                          TRENCH BACKFILL TESTING SHALL BE CARRIED OUT ON
                                                                                                                                    AREAS IMMEDIATELY ON COMPLETION OF BULK                                                                       MATERIAL FROM PAVEMENT AREA. COMPACT AREA TO A
                                                                                                                                                                                            IN EARTHWORKS NOTES.                                                                                       EACH ALTERNATE COMPACTED LAYER AT A MAXIMUM 50m                                     1      11.11.22 FOR COORDINATION                                      KC      LS
                          NOTHING IN THESE DESIGNS SHOULD BE INTERPRETED                                                            EARTHWORKS.                                                                                                   MAXIMUM DRY DENSITY OF 100% STANDARD                 CENTRES AND NO MORE THAN 3m FROM MANHOLE                                           ISSUE DATE                       AMENDMENT                             BY     APP
                          AS GOING BEYOND THE STRUCTURAL INTEGRITY OF THE                                                                                                                                                                         COMPACTION. FOLLOWING COMPACTION PLACE SELECT        STRUCTURE.
                                                                                                                                    FILL BATTERS ARE TO BE OVER FILLED AND COMPACTED        THE CONTRACTOR IS TO INITIALLY EXCAVATE THE
                          SUBJECT MATTER OF THE DESIGNS AND THEY SHOULD                                                                                                                                                                           FILL MATERIAL (MINIMUM CBR 15) IN LAYERS NOT                                                                                                 COPYRIGHT: THIS DESIGN AND PLANS ARE NOT TO BE USED OR REPRODUCED
                                                                                                                                    TO 1.0m BEYOND FINAL BATTER FACE THEN CUT BACK TO       PAVEMENT TO LEVEL THEN ARRANGE 4 DAY SOAKED CBR                                                                                                                                                               WHOLLY OR IN PART WITHOUT WRITTEN PERMISSION OF MPN
                          NOT BE USED AS AN INDICATOR OF THE APPROPRIATE                                                                                                                                                                          EXCEEDING 150mm COMPACTED THICKNESS TO THE           THE CONTRACTOR IS TO ENSURE THE METHOD OF                                                          CONSULTING PTY LIMITED 2018 ©
                                                                                                                                    FINAL BATTER.                                           TESTS ON THE SUBGRADE AND NOTIFY THE
                          METHODS OF WORK ON, IN OR AROUND THE SUBJECT                                                                                                                                                                            UNDER SIDE OF NEW PAVEMENT MATERIAL TO M.D.D.        COMPACTION OF THE BACKFILL IS SUITABLE FOR THE
                                                                                                                                                                                            SUPERINTENDENT WHO WILL DETERMINE FINAL
                          MATTER.                                                                                                                                                                                                                 RATIO OF 100% STANDARD COMPACTION. (AS 1289).        CLASS OF PIPE INDICATED ON THE DRAWINGS.
                                                                                                                                    SOFT SPOTS IN CLAY ARE TO BE DRAINED BY RUBBLE OR       PAVEMENT THICKNESS AND ARRANGE PAVEMENT
                                                                                                                                    AGRICULTURAL DRAINS TO PREVENT 'SUMPS' FORMING.         APPROVAL FROM THE RELEVANT AUTHORITY.
                          CONCERNS ABOUT THE CONDUCT OF WORKERS OR                                                                                                                                                                                WHERE NEW LANDSCAPING IS TO BE ESTABLISHED IN        IF NECESSARY THE CONTRACTOR IS TO ADJUST HIS
                                                                                                                                                                                                                                                  EXISTING PAVEMENT AREA, REMOVE A.C. SURFACE,                                                                                            ABN: 39 062 191 799                                             P: 61 7 3335 4555
                          METHODS OF WORK SHOULD BE RAISED WITH THE                                                                                                                         ALL SUB GRADE AREA SHALL BE PROOF ROLLED AND                                                               COMPACTION METHODS TO SUIT THE PIPE CLASS.
                                                                                                                                    AT COMPLETION OF CONSTRUCTION THE CONTRACTOR                                                                  CONCRETE KERBS AND ROAD BASE TO A MINIMUM DEPTH
                                                                                                                                                                                                                                                                                                                                                                                          39 Sherwood Road, Toowong, Qld, 4066                   E: [email protected]
                          APPROPRIATE SAFETY OFFICIAL ON SITE.                                                                                                                              COMPACTED TO MAXIMUM DRY DENSITY RATIO OF 100%
                                                                                                                                    SHALL ARRANGE FOR AN INDEPENDENT LICENSED                                                                     OF 300mm. INSTALL SUBSOIL DRAINAGE TO THE
                                                                                                                                    SURVEYOR TO CARRY OUT A 'WORKS AS CONSTRUCTED'          STANDARD COMPACTION (AS 1289) WITH MOISTURE                                                                WHERE THE TRENCH IS EXCAVATED IN WATERLOGGED
                          PEDESTRIAN SURFACES                                                                                                                                                                                                     PERIMETER OF THE NEW LANDSCAPE AREA AT A DEPTH       GROUND OR WHERE THE FOUNDATION IS CONSIDERED
                                                                                                                                    SURVEY AND SUBMIT THE DETAILS SHOWN ON A PLAN TO        CONTENT WITHIN THE RANGE OF 2% WET TO 0% DRY OF
                                                                                                                                                                                                                                                  OF 300mm BELOW SUBGRADE LEVEL. FILL WITH TOP SOIL    UNSUITABLE IN THE OPINION OF THE SUPERINTENDENT, A
                                                                                                                                    THE SUPERINTENDENT.                                     STANDARD OPTIMUM MOISTURE CONTENT. ANY SOFT
                                                                                                                                                                                                                                                  TO A DEPTH OF 100mm BELOW TOP OF KERB. REFER TO      LAYER OF CRUSHED ROCK, 40mm TO 20mm SIZE OR
                          ALL SURFACES SUBJECT TO PEDESTRIAN TRAFFIC SHALL                                                          2. SOILS REPORT                                         SPOTS ENCOUNTERED ARE TO BE EXCAVATED AND
                                                                                                                                                                                                                                                  ARCHITECTS AND / OR LANDSCAPE CONSULTANTS            OTHER MATERIALS APPROVED BY THE INSPECTING
                          MEET    THE    MINIMUM    PENDULUM    OR    RAMP                                                          A SOILS INVESTIGATION HAS BEEN CARRIED OUT BY CORE      REPLACED WITH SELECT MATERIAL (MINIMUM CBR 15) AS
                                                                                                                                                                                                                                                  DETAILS FOR FINAL PLANTING.                          ENGINEER SHALL BE LAID IN A 500mm THICK LAYER
                          RECOMMENDATIONS CONTAINED IN TABLE 3 OF                                                                   CONSULTANTS        PTY     LTD,    REFERENCE    No.     DEFINED IN EARTHWORKS NOTES.
                          AUSTRALIAN STANDARD HANDBOOK HB197:1999 - AN                                                                                                                                                                                                                                 BELOW THE CULVERT BASE OR PIPE. THESE AREAS ARE
                                                                                                                                    J001701-006-R-Rev1, DATED OCT, 2022.                                                                          THE CONTRACTOR SHALL ARRANGE FOR AN                  TO BE INSPECTED BY THE GEOTECHNICAL ENGINEER TO
                          INTRODUCTORY GUIDE TO THE SLIP RESISTANCE OF                                                                                                                      ALL FILL MATERIAL EXCLUDING ROAD PAVEMENT IS TO BE




                                                                                                                                                                                                                                                                                                                                                                   NOT FOR CONSTRUCTION
                                                                                                                                    THIS REPORT MUST BE READ IN ITS ENTIRETY PRIOR TO                                                             INDEPENDENT LICENSED SURVEYOR TO CARRY OUT           ASSESS WHETHER FURTHER EXCAVATION IS REQUIRED
                          PEDESTRIAN SURFACE MATERIALS. COMPLIANCE WITH                                                             CONSTRUCTION BEING UNDERTAKEN.                          PLACED IN LAYERS NOT EXCEEDING 150mm COMPACTED
                                                                                                                                                                                                                                                  'WORKS AS CONSTRUCTED' SURVEY AND SUBMIT DETAILS     OR OTHER MEASURES CAN BE ADOPTED.
                          THE RECOMMENDATIONS SHALL BE VERIFIED BY TESTING                                                                                                                  THICKNESS AND COMPACTED TO DENSITIES OUTLINED IN
                                                                                                                                    3. SITE PREPARATION                                     THE EARTHWORKS NOTES.
                                                                                                                                                                                                                                                  SHOWN ON A PLAN TO THE SUPERINTENDENT AT
                          TO EITHER:- AS/NZS 4586:2004 - SLIP RESISTANCE
                          CLASSIFICATIONS OF NEW PEDESTRIAN SURFACE                                                                 CLEAR THE SITE OF ALL DEBRIS INCLUDING EXISTING                                                               COMPLETION    OF     CONSTRUCTION.   'WORKS    AS    THE CONTRACTOR SHALL ARRANGE FOR AN                                                 LOT 22 MEDIHUB
                                                                                                                                                                                                                                                  CONSTRUCTED' SURVEY IS TO SHOW BUT NOT BE LIMITED
                          MATERIALS, OR AS/NZS 4663:2004 - SLIP RESISTANCE                                                          BUILDING RUBBLE AND CONCRETE SLABS, TREES
                                                                                                                                    EXCEPTING THOSE TO BE RETAINED, GRASS AND TOP
                                                                                                                                                                                            ALL ROAD PAVEMENT MATERIAL IS TO BE PLACED IN
                                                                                                                                                                                                                                                  TO LEVEL AND LOCATION OF NEW KERB, KERB AND
                                                                                                                                                                                                                                                                                                       INDEPENDENT LICENSED SURVEYOR TO CARRY OUT A
                                                                                                                                                                                                                                                                                                       'WORKS AS CONSTRUCTED' SURVEY TO SUBMIT DETAILS
                                                                                                                                                                                                                                                                                                                                                                                           NOOSA BUSINESS CENTRE
                          MEASUREMENT OF EXISTING PEDESTRIAN SURFACES AS                                                                                                                    LAYERS NOT EXCEEDING 150mm COMPACTED THICKNESS
                          APPROPRIATE IN BOTH INSTANCES COMPLIANCE SHALL                                                            SOIL TO A DEPTH OF MIN. 100mm AND ORGANIC MATERIAL      AND COMPACTED TO 95% MODIFIED MAXIMUM DRY
                                                                                                                                                                                                                                                  CHANNEL, CONCRETE INVERT AND KERB RAMP AND ANY       SHOWN ON PLAN TO THE SUPERINTENDENT AT                                              28 EENIE CREEK ROAD
                                                                                                                                    SUCH AS TREE ROOTS WHERE REQUIRED. STRIPPED TOP                                                               DETAILS RELATED TO FINAL ROAD WORKS.                 COMPLETION     OF    CONSTRUCTION.    'WORKS   AS                                   NOOSAVILLE, QLD 4566
                          BE DEMONSTRATED BY APPLYING CLAUSE 5.3 - MEANS OF                                                                                                                 DENSITY.
                          DEMONSTRATING COMPLIANCE OF AS/NZS 4586:2004 -                                                            SOIL TO BE STOCKPILED ON SITE FOR REUSE IF                                                                                                                         CONSTRUCTED' SURVEY IS TO SHOW BUT NOT BE LIMITED
                          SLIP RESISTANCE CLASSIFICATION OF NEW PEDESTRIAN                                                          REQUIRED OR REMOVED FROM SITE.                          COMPACTION TEST RESULTS AND TEST LOCATIONS FOR                                                             TO LEVEL AND LOCATION OF ALL DRAINAGE STRUCTURES,
                                                                                                                                                                                                                                                                                                       PIPES SIZES AND INVERT LEVELS.
                                                                                                                                                                                                                                                                                                                                                                                                         CONSTRUCTION NOTES
                          SURFACE MATERIALS.                                                                                        PRIOR TO THE PLACEMENT OF ANY FILLING PROOF ROLL        BASE COURSE TESTING SHALL BE SUBMITTED TO AND
                                                                                                                                    THE SITE USING SIX PASSES OF A 10 TONNE MINIMUM         APPROVED BY THE SUPERINTENDENT PRIOR TO PLACING
                          IN GENERAL, THE CLASSIFICATION OF A SURFACING                                                             STATIC WEIGHT VIBRATORY PAD TYPE ROLLER.                SURFACE. SHOULD ANY TEST FAIL, THE CONTRACTOR                                                              PRIOR TO WORKS GOING ON MAINTENANCE OR A WORKS
                                                                                                                                    SUBGRADE TO BE COMPACTED TO 100% MAXIMUM DRY                                                                                                                       COMPLETION   CERTIFICATE   IS   PROVIDED,  THE                                     DESIGN: KC             DRAWN:      KC          SCALES:       AS SHOWN
                          MATERIAL OR FINISH SHALL BE MADE ON A WORST CASE                                                                                                                  SHALL REWORK THE AREA AS REQUIRED OR AS DIRECTED
                          BASIS AS DETERMINED BY PENDULUM TESTING USING                                                             DENSITY STANDARD COMPACTION TO E1.1 AS 1289.            TO OBTAIN THE SPECIFIED COMPACTION. BASE COURSE                                                            CONTRACTOR SHALL ARRANGE FOR A CCTV TO BE                                          CHKD:                  APPRD:                  DATE:
                          BOTH THE FOUR S AND TRL RUBBER SLIDER. WHERE                                                              MOISTURE CONTENT OF THE SUBGRADE IS TO BE WITHIN        MATERIAL SHALL NOT BE PLACED UNTIL THE KERBS HAVE                                                          CARRIED OUT.
                                                                                                                                                                                                                                                                                                                                                                                               mpn JOB             DRAWING No.                                        REV
                          ADDITIONAL TEST RESULTS ARE AVAILABLE (OIL -WET                                                           THE RANGE OF 2% WET TO 0% DRY OF STANDARD               ACHIEVED 20MPa STRENGTH.
                          RAMP, WET/ BAREFOOT RAMP) THESE MAY BE TAKEN INTO
                          CONSIDERATION.
                                                                                                                                    OPTIMUM MOISTURE CONTENT.
                                                                                                                                                                                                                                                                                                                                                                                            8662 CN.0.102C 2

                                                                                                                                                                                                                                                                                                                                                                                              FOR APPROVAL
Document Set ID: 22315064
Version: 1, Version Date: 20/02/2023

Used in these records

About this file

File size
15.4 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans and Documents - OPW22_0303.pdf · 15.4 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.