Original source · versioned page text
Approved Plans and Documents - OPW22/0303
FORM A — EARTHWORKS AND FUNCTIONAL (HYDRAULIC) STRUCTURES Purpose: To ensure earthworks bulking out, trimming and profiling and the key levels of functional (hydraulic) structures are in accordance with design drawings and specifications. The earthworks and structures dictate the movement of stormwater through the bioretention system and are a critical element in the function of the system. ITEMS CHECKED As constructed survey completed and attached to this form errno nent nt niet Photos taken and attached to this form | = = =e Se Eee Set-out of system is correct | Base levels are at correct elevation (£50 mm) Base at correct grading (0.5%) SATISFACTORY ACTION (IF UNSATISFACTORY) INITIAL Punch out holes in overflow pit are correct size, correct level and above invert level of outlet pipe (+25 mm) Overflow pit is correct size and crest and invert is at correct level (25 mm) Outlet pipe invert levels are correct (upstream and downstream) (£25 mm) Outlet pipe is free draining Overflow weir (if required) is correct length and at correct level +25 mm) | Overflow weir (if required) is keyed into bund Bunds/embankments surrounding the system are at correct levels or above | HOLD POINT: Superintendent and bioretention designer inspection and sign-off before proceeding. Comments (attach and refer to additional pages if necessary) NB: As constructed survey and drawings and photos attached. Signed by superintendent: Print name: Date: Document Set ID: 22315062 Version: 1, Version Date: 20/02/2023 Signed by bioretention designer: Print name: Date:
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Approved Plans and Documents - OPW22_0303.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.