Original source · versioned page text
Approved Plans and Documents - OPW22/0303
9 February 2023
RAINWATER TANK MAINTENANCE CHECKLIST
Inspection Frequency 1 to 6 Monthly Date of Inspection
Location
Description
Asset ID
Site Visit by
Inspection Items Y N Actions Required (Details)
First flush diverter
Tank screens
Leaf filters/strainers
Tank opening damage
Internal inspection – including evidence of
access by animals
Vegetation condition satisfactory (health,
weeds etc)?
Water Quality check
Check pump condition including filters
Structural integrity of tanks including all
pipework
Removal of all accumulated sediment
Excellence with Economy in Engineering 13
https://mpncnetau.sharepoint.com/sites/administration/shared documents/8000-8999/8600-
8699/8662/reports/09-02-23 operational management and maintenance plan_issue b.docx`
Document Set ID: 22315062
Version: 1, Version Date: 20/02/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Approved Plans and Documents - OPW22_0303.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.