Development Application part 1 of 2 Cover Letter - IDAS Form 1 and 6 - Neighbours Consent Letter · OPW11/0064

of 15

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                           SCRC CORRESPONDENCE



                               V^IVOP^II9^6dl1'
   THIS IS THE NEXT PART OF A
 MULTIPLE PART RECORD
          Part t   Of '?

Application number: 02, // C9^^
Full text of the other 14 pages

Page 2

Page 3

                                                                 LSArchitecture
                                      Bennetts Road Norman Park QLD 4170 1 PO Box 3442 Norman Park QId 4170
                                                   E [email protected] I   W www.lsarchitecture.com.au
                                                                                               T 07 3324 8194




Friday, February 25, 2011



Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre QId 4560




RE:     Operational Works Application
        Sewerage Infrastructure Upgrade
        On land at 13-15 Wesley Court Noosa


I enclose the following documents forming part of the planning application for operational
work assessed under the planning scheme;

      • Cheque for $1426
      • Application IDAS form 1
      • Application IDA form 6
      • Neighbours consent- 17 Wesley Court
      • Unity Water Plan
      • Tate Engineers Drainage Plan




Please contact us if you require clarification of any of the above or if you require any additional
information.




Regards,




Lyndon Sanders

Page 4

                                                                                                    0 [_L-
                                                                                                         ,_i i____
     MEN Integrated Development Assessment System form                                                     ►


Application Details - IDAS form 1
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)


You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
•      complete this form (Application details - IDAS form 1)
•      complete any other forms relevant to your application
•      provide any mandatory supporting information identified on the forms as being required to accompany your
       application.
All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.

Applicant details (note: the applicant is the person responsible for making the application and need not be the
owner of the land. The applicant is responsible for ensuring the information provided on all IDAS application forms is
correct. Any development permit or preliminary approval that may be issued as a consequence of this application will
be issued to the applicant.)

Please note: If there is more than one applicant, provide additional applicant details by clicking the "Add another
applicant" button below.


Name/s (individual or company name in full)                   LSArchitecture

For companies, contact name                                   Lyndon Sanders


Postal address                                                PO Box 3442, Norman Park Qld 4170


Contact phone number                                          3324 8194


Mobile number (non-mandatory)                                 0418 769 468


Fax number (non-mandatory)

e-mail address (non-mandatory)                                [email protected]




1. What is the nature of development proposed? (tick all applicable boxes)


q     material change of use of premises
q     building work
      operational work
q     reconfiguring a lot




    Department of Infrastructure and Planning                            QPlan                      Queensland
                                                                                                    Government

Page 5

2. What type of approval is being sought?

® development permit
q preliminary approval
q both - provide details below


3. Is the application for a mobile and temporary environmentally relevant activity (ERA)?


® No

q    Yes - complete table A and then go to question 5




4. Location of the premises (complete table B and/or table C as applicable. Identify each lot in a separate row)

Table B - street address/lot for the premises or street address/lot on plan for the land adjoining or adjacent to the
premises

                                                                              Lot on plan
                Street Address
                                                                              description
                                                                                               Local government area
                Unit   Street       Street name and official       Post          Plan type       (e.g. Logan,Cairns)
                                                                        Lot No
                                                                            No.
                No.     No.          suburb/locality name          code         and plan no.

            1          13-15    Wesley Court NOOSA             4567      38       SP233300     Noosa

® Street address / lot on plan
  Street address / lot on plan for the land adjoining or adjacent to the premises (appropriate for development in
q water e.g. jetty, pontoon)
Table C - premises coordinates (appropriate for development in remote areas, over part of a lot or in water e.g.
channel dredging in Moreton Bay)

                Coordinates (note: place each set of
                coordinates in a separate row)                         Zone                         Local government
                                                                                      Datum
                                                                     re ference                    area (If applicable)
                  Easting       Northing    Latitude   Longitude
                                                                                  q GDA94
                                                                                  q WGS84
            1
                                                                                  q other




5. Total area of the premises on which the development is proposed (indicate hectares or m2)

2111sgm
6. Current use/s of the premises (e.g. vacant land, house, apartment building, cane farm, etc.)


        1       Vacant Land



7. Provide a brief description of the proposal (e.g. six unit apartment building, 30 lot residential subdivision etc.)


Single Dwelling




                                                                                                cation Details - IDAS form
                                                                                                rsion 10 18 December 2009

Page 6

8. Is owner's consent required for this application? (refer to notes at the end of this form for more information)

q No
® Yes - complete either table D, table E or table F as applicable


Table D (note: do not complete this table if lodging the application on-line using Smart eDA)


Name of owner/s of the land        James Timothy Dyer

I/We, the above-mentioned owner/s of the land, con           the making of this application.


Signature of owner/s of the land


Date                                     S tic                 PA          2
Table E


Name of owner/s of the land

q The owner's written consent is attached or will be provided separately to the assessment manager


Table F


Name of owner/s of the land

  By making this application, I, the applicant, declare that the owner has given written consent to the making of
q the application.


9. Does the application involve a state resource? (e.g. the application involves state land, or taking quarry
materials. Refer to the notes at the end of this form for more information)

® No                            q Yes - complete table G


10. Identify if any of the following apply to the premises (tick applicable box/es)


       adjacent to a water body, watercourse or aquifer (e.g creek, river, lake, canal) - complete table H
       on strategic port land under the Transport Infrastructure Act 1994 - complete table I

LI     in a tidal water area - complete table J


Table H       Name of water body, watercourse or aquifer

          1


11. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow,
    water, etc.)

® No      q Yes - ensure the type, location and dimension of each easement is included in the plans submitted




                                                                                               plrcation Details - IDA S form 1
                                                                                               Version 1.0 18 December 2009

Page 7

12. Does the proposal include new building work or operational work on the premises? (including any
    services)

q No ® Yes - ensure the nature, location and dimensions of proposed works are included in plans submitted

13. Is the payment of a portable long service leave levy applicable to this application? (refer to the notes at the
    end of this form for more information)

® No - Go to question 15                  q Yes


15. Has the local government agreed to apply a superseded planning scheme to this application under
    section 96 of the Sustainable Planning Act 2009?


® No
q    Yes - provide details below


16. List below all of the forms and supporting information that accompany this application (include all IDAS
forms, checklists, mandatory supporting information etc. that will be submitted as part of this application. Note: this
question does not apply for applications made online using Smart eDA)

                                                                                                Method of lodgement to
                             Description of attachment or title of attachment
                                                                                                 assessment manager

            1


17. Applicant's declaration


® By making this application, I declare that all information in this application is true and correct (note: it is
    unlawful to provide false or misleading information).




                                                                                                              ^cember 2009

Page 8

    Notes for completing this form

Question 8:
•      Section 263 of the Sustainable Planning Act 2009 sets out when the consent of the owner of the land is required
       for an application. Section 260(1)(e) of the Sustainable Planning Act 2009 provides that if the owner's consent is
       required under section 263, then an application must contain, or be accompanied by, the written consent of the
       owner, or include a declaration by the applicant that the owner has given written consent to the making of the
       application.
•      Owner's consent is not required for a mobile and temporary ERA.

Question 9:
• Section 264 of the Sustainable Planning Act 2009 provides that if a development involves a state resource, a
   regulation may require the application to be supported by certain evidence prescribed under the regulation.
   Schedule 14 of the Sustainable Planning Regulation 2009 prescribes the state resources for which evidence is
   required to be given, and the evidence required, to support the application.

Question 13:
• The Building and Construction Industry (Portable Long Service Leave) Act 1991 prescribes when the portable
   long service leave levy is payable.
•      The portable long service leave levy amount and other prescribed percentages and rates for calculating the levy
       are prescribed in the Building and Construction Industry (Portable Long Service Leave) Regulation 2002.

Question 14:
• The portable long service leave levy need not be paid when the application is made, but the Building and
   Construction Industry (Portable Long Service Leave) Act 1991 requires the levy to be paid before a development
   permit is issued.
•      Building and Construction Industry Notification and Payment Forms are available from any Queensland post
       office or agency, on request from QLeave, or can be completed on the QLeave website at
       www.qleave.qld.gov. au. For further information contact QLeave on 1800 803 481 or www.gleave.gid.gov.au.

Privacy -the information collected in this form will be used by the Department of Infrastructure and Planning (DIP) in
accordance with the processing and assessment of your application. Your personal details will not be disclosed for a
    purpose outside of the IDAS process, except where required by legislation (including the Right to Information Act
    2009) or as required by Parliament. This information may be stored in a departmental database. The information
collected will be retained as required by the Public Re_eords Act 2002.

OFFICE USE ONLY                        tCounter 1

Date received                      MAR 2011      Reference numbers           FI(.) ^ ( DOro
NOTIFICATION OF ENGAGEMENT OF A PRIVATE CERTIFIER


                                                          Council. I have been engaged as the private certifier for the
To:
                                                          building work referred to in this application.



Date of                                                                       BSA Certification      Building
                        Name
engagement                                                                    license number         classification/s




                                                                                              oplication Details - IDAS form I
                                                                                               Version 1.0 18 December 2009

Page 9

QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)


                                                                              Date receipted
                                      QLeave Project   Amount                 form sighted by Name of officer who
              Description of the work                             Date paid
                                      Number           paid ($)               assessment      sighted the form
                                                                              manager

        1


The Sustainable Planning Act 2009 (SPA) is administered by the Department of Infrastructure and Planning. This
form and all other required application materials should be sent to your assessment manager and any referral
agencies.




                                                                                        lersron 7,U 16 Veceinber 2005

Page 10

                               Integrated Development Assessment System form


Building or operational work assessable
against a planning scheme - IDAS form 6
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)

This form must be completed for development applications for building works or operational work assessable against
a planning scheme.
You MUST complete ALL questions unless the form indicates otherwise. Incomplete forms or forms without all
necessary information and documentation will result in your application not being a properly made application.
For all development applications, you must:
•     complete Applicant details - IDAS form I
•     complete any other forms relevant to your application
•     provide any mandatory supporting information identified on the forms as being required to accompany your
      application.

All terms used on this form have the meaning given in the Sustainable Planning Act 2009 or the Sustainable Planning
Regulation 2009.

This form can also be used for development on strategic portland under the Transport Infrastructure Act 1994.

1. What is the nature of the work that requires assessment against a planning scheme? (tick applicable box/es)

q building work - complete table A                    ® operational work - complete table B


Table B

          What is the nature of the operational work made assessable in the planning scheme? (tick applicable box/es)


          q road works                    q stormwater                   q water infrastructure
          q drainage Works                q earthworks                   ® sewerage infrastructure
          q landscaping                   q signage                      q clearing vegetation under the planning scheme
          q other - please specify below

          What type of approval is being sought? (if you have indicated multiple works in the above question, please
          use an attachment to this form to detail each approval request)

          ® development permit                 q preliminary approval               q both - specify below

          Is the operational work necessary to facilitate the creation of new lots? (e.g. subdivision)

          ® No           q Yes - specify the number of lots being created

          Are there any current approvals associated with this application? (e.g. material change of use)

          ® No           q Yes - provide details below




                                                          M
                  of Infrastructure and Planning                          QPlan                              Queensiand
                                                                                                              Government

Page 11

2. What is the dollar value of the proposed building work? (inc GST, materials and labour)         $ 35000




                                        Building and operational work assessable against a                  e - IDAS form 6
                                                                                             Version 1 0 18 December 2009

Page 12

3. Confirm the following mandatory supporting information accompanies this application
                                                                               Confirmation
                                                                                            Method of lodgement
                                                                               of lodgement
All applications for operational works

site plans drawn to scale which show the following:
• the location and site area of the land to which the application relates
    (relevant land)
• the north point
• the boundaries of the relevant land
• the allotment layout showing existing lots, any proposed lots (including
    the dimensions of those lots), existing or proposed road reserves,            confirmed
    building envelopes and existing or proposed open space (note:
    numbering is required for all lots)
•   any existing or proposed easements on the relevant land and their
    function
•   any access limitation strips
•   all existing and proposed roads and access points on the relevant land


a statement about how the proposed development addresses the local
government's planning schemes and any other planning documents                 q confirmed
relevant to the application
Applications for operational works involving earthworks (filling and excavating)


drawings showing:
• existing and proposed contours
• areas to be cut and filled
•   the location and level of any permanent survey marks or reference
    stations used as datum for the works                                       q confirmed
•   the location of any proposed retaining walls on the relevant land and
    their height
•   the defined flood level (if applicable)
•   the defined fill level (if applicable)

Applications for operational works involving roadworks


drawings showing:
• existing and proposed contours
• the centreline or construction line showing chainages, bearings, offsets
    if the construction line is not the centreline of the road and all
    intersection points
• information for each curve including tangent point chainages and
    offsets, curve radii, arc length, tangent length, superelevation (if
    applicable) and curve widening (if applicable)
• kerb lines including kerb radii (where not parallel to centreline) and
    tangent point changes (where not parallel to centreline)
• edge of pavement where kerb is not constructed                               q confirmed
• position and extent of channelisation
• location and details of all traffic signs, guideposts, guardrail and other
    street furniture
• pavement markings including details on raised pavement markers
• catchpit, manhole and pipeline locations
• drainage details (if applicable)
• cross road drainage culverts (if applicable)
• concrete footpaths and cycle paths
• location and details for access points, ramps and invert crossings
• changes in surfacing material

                                                Ling and operational work assessable against a planrnny scheme - IDAS form 6
                                                                                                Version 10 18 December 2009

Page 13

qqq
                                                                               Confirmation
                                                                                            Method of lodgement
                                                                               of lodgement
Applications for operational works involving stormwater drainage

drawings showing:
• existing and proposed contours
• drainage locations, diameters and class of pipe, open drains and
   easements
                                                                               q confirmed
• manhole location, chainage and offset or co-ordinates and inlet and
   outlet invert levels
•   inlet pit locations, chainage and offset or co-ordinates and invert and
  kerb levels
Applications for operational works involving water reticulation


drawings showing:
• kerb lines or edge of pavement where kerb is not constructed
• location and levels of other utility services where affected by water
    reticulation works
•   pipe diameter, type of pipe and pipe alignment
•   water main alignments
                                                                               q confirmed
•   water supply pump station details (if applicable)
•   minor reservoir details (if applicable)
•   conduits
•   location of valves and fire hydrants
•   location of house connections (if applicable)
•   location of bench marks and reference pegs

Applications for operational works involving sewerage reticulation

drawings showing:
• location of all existing and proposed services
• location of all existing and proposed sewer lines and manhole locations
• location of all house connection branches
• kerb lines or edge of pavement where kerb is not constructed
• chainages                                                               q confirmed
• design sewer invert levels
• design top of manhole levels
• type of manhole and manhole cover
• pipe diameter, type of pipe and pipe alignment
• location of house connections (if applicable)
• sewer pump station details (if applicable)
Applications for operational works involving street lighting


drawings showing:
• location of all light poles and service conduits
• location of all other cross road conduits
• type of wattage and lighting
•   any traffic calming devices                                                q confirmed
•   additional plans for roundabouts and major roads (if applicable)
•   details of any variations to normal alignment
•   details of lighting levels




                                                ding and operational work assessable against a planrrg scheme - IDAS form 6
                                                                                               Version 1 0 18 December 2009

Page 14

                                                                             Confirmation
                                                                                          Method of lodgement
                                                                             of lodgement
Applications for operational works involving public utility services
drawings showing:
• any existing light poles and power poles
•   any existing underground services
                                                                             Elconfirmed
•   details of proposed services
•   alternation to existing services

Applications for operational works involving landscaping works
drawings showing:
• the location of proposed plant species
•   a plant schedule indicating common and botanical names, pot sizes
    and numbers of plants
•   planting bed preparation details including topsoil depth, subgrade
    preparation, mulch type and depth, type of turf, pebble, paving and         confirmed
    garden edge
• the location and type of any existing trees to be retained
• construction details of planter boxes, retaining walls and fences
• the proposed maintenance period
• irrigation system details


Notes for completing this form:
•   This form can also be used for development applications for building works or operational works assessable
    against the land use plan for Cairns airport land or Mackay airport land. Whenever a planning scheme is
    mentioned, take it to mean the land use plan for the airport land.


Privacy -please refer to your assessment manager for further details on the use of information recorded in
this form.


OFFICE USE ONLY            Zit    Counter

Date Received           2 MAR 2UT       Reference Numbers


The Sustainable Planning Act 2009 is administered by the Department of Infrastructure and Planning. This form and
all other required application materials should be sent to your assessment manager and any referral agencies.




                                               ling and operational work assessable against a planning scheme - WAS Corm

Page 15

                                                        RRY M & NICHOLAS P H LEECH
                                                        WESLEY CT.




We the undersigned of 17 Wesley Court Noosa permit access into our property for the purposes of
providing upgrade .-:orks to the Unity Water Sewer infrastructure between manhole 35254 and 352-5



                                                                          fd AA (, ^► ^cr
IV^u^J F-              r^ a4u V& .           444
p,9 rd-c



Signed


                                                              KERRY M & NICHOLAS P H LEECH

                                       /Lh4          CA-,    P A &-r^
Dated

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application part 1 of 2 Cover Letter - IDAS Form 1 and 6 - Neighbours Consent Letter.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.