Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

09/0103 - MCU - Detached House - Part 2 [As Published] · 132009.103

of 13

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

13° February 2009

Mr. Glen Conforti

Land Use

Sunshine Coast Regional Council oa eo
PO Box 141, : OO ey
Tewantin, “As
Queensiand, Australia 4565 oN us

 

Dear Glen,

 

Re: Lot: 96 Plan: N21838
81 Orient Drive, Sunrise Beach Q. 4567
Application for Material Change of Use.

Please find attached the Owner’s Consent Form for this application, duly signed
by our client, property owner Theresa O'Brien,

We have also taken the Opportunity to amend our documents slightly,

The changes include adjusted (correct) RLs and addition of a proposed bracing
wall intrusion into the southern side boundary setback as requested by our
engineer,

If you could discard the previous document sets it would be much appreciated,

If you have any questions regarding processing this application, please do not
hesitate to call,

Thanking you in anticipation,

Yours faithfully,

oe
Lee Foster

Director - Building Design

cc Theresa and John O'Brien

Page 1 of 1

 

Steprer Kida

2 4

Carole Tretheway

Scott Falconer
. B.oteg Daeg

 

 

 

 

Lee Foster

200

S. rach CLO WSer
PISA adress

HS Be QB:

Mousa eggs Wo 4537
Traneyos 2 ba 933
Nag e OS) sagt s

 

 

www kiddeo com au

Kidd + Co Designers
Full text of the other 12 pages

Page 2

a

Fae WG Tec, LT SNSS oe bay

To Sunshine Coast Regional Counci
Facsimile: 197) 8447 1969
Phone: io7i 8449 8200
PO Box 441
TEWANTN, QLD 4565

  

OWNER’S CONSENT

REG.STERED OWNER’S AS PER DEPT. NATURAL RESOURCES RECORDS
Name: THERESA AND JOHN O'BRIEN

Postal Adress: Cs Kidd # Co Des'grers, PO Box 262, Noosa heads, Qid 4567

PROPERTY DESCRIPTION:

Site Address: 61 ORIENT DRIVE, SUNRISE BEACH, Q

LotNo 96onN21938. Pronety NO
APPLICANT DETAILS:
Name: THERESA AND JOHN O'BRIEN

Postal Address: C.- Kidd + Co Designers, PO Bex 262, Noosa Heads Qld 4567

| We being the OWNERS mentioned above, consent to the above mentioned APPLICANT to
submitting a Development Application for Building » Plumbing » Operational Works / Materia‘
Change of Use on the above droperty and to receiving a Development Permit on that property,

Sigrature OKA lt 8 fi m

  

PM Registered Owner & Anplicant

  

Sigratura: ww,
'¥4y 104

Date...

NOTE: PLEASE USE BLOCK LETTERS WHEN COMPLETING THIS FORM

Page 3

 

P.001

1.5m SITE 3

Shaded area represents portion of Garage contained within the 1.5m SITE SETBACK

SCALE1:100

SITE BOUNDARY (SOUTHERN)

GARAGE STUDY - PLAN

 

GARAGE NATURAL GROUND LEVEL + 55m

GARAGE STUDY - 3D VIEWS

GARALA NATURAL SZOUNL:

 

Bay

   
    

+ Ahm

 

designers

20 Duke Street
Sunshine Seach GLO 456/

PO Box 262
Noosa Heads GLD 4567

felephone 07 5447 5033
Facsimile O/ 5447 9833

mto@kiddeo com au
www kiddco com au

Thies drawing st be read 7
conuncton with Engineers Drawings &
Reports

Constructon to comply
with all relevant SAA 8
BCA Codes & standard
Bldg By-law 19/5 & as
amended

Vertty all dimensions on
‘site prior > Commencement
of any works These
drawings are not to be
used for scaling
Copynght tor design &
drawings remain the
property of the authors

te)

 

P8. Amended for MCU App.
16 02.09
P7. issue tor MCU App. 27 01.09

Project

PROPOSED
RESIDENCE
Location

61 ORIENT DRIVE
SUNRISE BEACH

Clhent

O'BRIEN
Drawing Tite
GARAGE STUDY

Seale Date

as shown @A3 Feb '08
Drawn By Job No
LF/SC 0743
Drawing No issue No.

POO1 8

Page 4

4 5m above current ground line
4.5m (max) above natural ground line

4.5m (max) above natural ground line
4.5m (max) above natural ground line

3.5m above natural ground line
3.5m above natural ground line

current ground line

natural ground line (NGL) natural ground line (NGL)

current ground tine

 

MIN HEIGHT ABOVE NATURAL GROUND LINE = 3.045m
MAX HEIGHT ABOVE NATURAL GROUND LINE = 3.902m
AVERAGE HEIGHT ABOVE NATURAL GROUND LINE = 3.474m

____ GARAGE - SQUTH ELEVATION GARAGE STUDY - SECTION

P.002 ; SCALE1:100 P002  SCALE1:100

 

designers

20 Duke Street
Sunshine Beach GLD 4567

PO Box 262

Noosa Heads GLD 4567
Telephone O7 5447 5633
Facsimile Qf 5447 9833

into@kiddco com au
www kiddco com au

This drawing S to be read in
‘coqquncton wath Engineers Drawings &
Reports,

Constructon to comply
with all relevant SAA 6
BCA Codes & standard
Blig By aw 1975 6 as
amended

Verty al dimensions on
‘fle po to CoMMENceMeNt
Of any works, These
drawings are not to be
used for scaling
Copyngnt for design &
drawings remain the
property of the authors,

at

P& Amended for MCU App.
16 02 09
P7 Issue for MCU App 27 01 09

Project
PROPOSED
RESIDENCE

Locabon

61 ORIENT DRIVE
SUNRISE BEACH

Chent

O'BRIEN

Drawing Title
GARAGE STUDY

Scale Date

as shown @A3 Feb ‘08
Drawn By Job No.
LFISC 0743
Drawing No Issue No

POQ02 6

Page 5

 

(SMH
29.44U.

SITE PLAN

SCALE1:100

concrete path

ORIENT DRIVE

 

 

33

 

 

 

 

 

\ \e

existing tee to be removed
Norfolk wend pine

//

 

 

+

 

\

 

09
species wee

yoeqas wd

 

 

 

     
   
 

\

\

 

 

 

& 5
2? 5

2
& S

 

designers

20 Duke Street
Sunshine Beach GLO 4567

PO Box 262

Noosa Heads QLD) 4567
Telephone OF 5447 5633
Facsimile Of 544/ 5833

[email protected] au
www. kiddco.com.au

This drawing 6s tp be read in
conjunction with Engineers Orawings &
Reports:

Construction to comply
with all relevant SAA 8.
BUA Codes & standard
Bldg By daw 1975 & as.
anended

Very all dirnensions on

sfte prot to ConMencement
Ul any works These
drawings are nut to be
used for scaling
Copyrightfor design &
drawings remain the

   

wal Engineers
Spucturd Lngnes
Contant

Prone

tal

Surveyor

Suiveyur

Context

Prone

frat

Piivaite Carttier
Private Certher
Canter

Mrore

tinal

Hydraulic: Engineer
Hydrauke t agiseer
Context

Prone,

Emat

 

P8: Amended for MCU App.
16.02.09

P7: Issue for MCU App. 27.01.09
P&: Issue for information 12.12.08
PS: Issue for information 12.11.08
P4: Issue for information 07.17.08
P3: Issue for intonation 22.08.08
P2: Issue for information 25.07.08
P1. Issue for information 22.07.08
Proedt

PROPOSED
RESIDENCE
Location

61 ORIENT DRIVE
SUNRISE BEACH

Client

O'BRIEN

Drawing Tite

SITE PLAN

Seale Date

as shown @A2 Feb. 08
Drawn By dub No
LF/SC 0743
Orawing No Issue No.

9D.101 Pa

Page 6

Xo

 

 

SUBFLOQR PLAN

SCALE1:100

roy?

 
  
 
      
 
   
 
    
      
   
 
    
    
   
     
   

 

 

   

 

 

  
 

 

  

   
 

 
 

   
   
  
 
   
   
 
 

SMH

 
 

 

 

a 5nseer™ /
é oN
en Se *.
line of cul, landscaped rock wall, 20 \' \
base elevation RL 27.10 \
Tefer detail \
* \
sap y \ \
line of landscaped steps above kine of timber stairs above, \
j reer eng. detail \
subfloor timber batten screen, | ‘ \
refer ext finishes sched ' line of pool above,
subfloor block wall, | refer eng. detail \ an
refer eng. detail ! uy
. \ \ Oo
subfloor structural | \ cat
posts, refer eng I
\ \
\
\
subfloor block wall, \ \
refer eng. detail « ‘subfloor timber batten screen, \
Teter ext finishes sched | \
\ . / ve
\ line of building above ‘ \
| i I
terrace ¢ I %
line ot ppot above tA
v | \ v
| :
op | \
\
\
A
subfloor structural
posts, refer eng.
° 2,
3
subfloor timber batien screen, &
lo reler ext. finishes sched %
= \
\g- op biock bracing wail,
Sie tefer eng. detail \
| . line of cut, landscaped rock wall, 2.0m setback
| base elevation RL 26.50 1.5m setback
refer detail 5
‘ _SMH
A 25.25LL
© % © a © toa? © ©
v & v 4 v e ibe bab fy wv °

 

designers

2U Duke Street
Sunshine Beach Qt D 4507

PO Box 262

Noosa Heads Qt D 456/
Telephone 0/ 5447 5033
Facsimile Of 5447 5833

info@kiddco com au
www kiddeg.com au

Ths drawing 6 ty be rend 11
cunfunctun with Engineers Drawitgs &
Reports

Construction to comply
with all relevant SAA &
BCA Codes & standard
Billy By aw 19/5 Bas
amended

Very ali dinensions on
site pur to conmencement
any works These:
drawings are notio be
used for scaling
Copyright for design &
drawings remain the
Property of the authors,
CONSULTANTS,

9 Engaices
Spuctura bagtwer
Contiat

Phone

+ matt

Suneyur

Satveyur

Contin

Phone

tinal

Pivate Center

   

 

 

P8. Amended for MCU App.
16.02.09

P7?: Issue for MCU App. 27.01.09
P6: issue for intunnation 12.12.08
P5: Issue for information 12.11.08
P4: Issue for information 07.11.08
P23: Issue for information 27.08.08
P2 Issue for information 25 07 08
P41: Issue for information 22.07.08
Prowect

PROPOSED
RESIDENCE
Location

61 ORIENT DRIVE
SUNRISE BEACH

Chent

O'BRIEN

Drawing Tite

SUBFLOOR PLAN

Seale Date

as shown @A2_ Feb. 08
Drawn By Jub No
LF/SC 0743
Drawing No Issue No

SB.201 8

Page 7

Nua IN3EO

 

LOWER FLOOR PLAN

SD.202/ SCALE1:100

\
an wide ‘Native Landscape Zone’
: K line of block wall fence
abrove, refer eng deta 3 \
| line of entry deck over * \
ve \
’ ke \
7 low landscaped rod y pair
ths gael POOL TERRACE Il, v tine a deck over
oy pavers ~ - :
wey te \
tie |FFL 25.95} ie
4 hne of building over.
\ '
\ t \
: line of garage deck over lo \
an a 3
4 line of driveway over. \g \
\ = \
; 3 i
‘ . :
Q s \ aa \
1
4 \ \ :
‘\ “ fine of building over
7 | ‘ block bracing wall,
line of garage deck over | refer eng delail
|
‘ ‘ oY set 10 oo:
a \ water" g ‘ a
b 1

  

 

       
   
 

 
 

 
 

 

  
 

 

6

TOL 47
- x y 2

& 36.605

 

designers

20 Duke Street
Sunshine Beach QLD 4567

PO Box 262
Noosa Heads Ql D 4567

Telephone 07 5447 5633
Facsimile 07 9447 5833

info@kiddee com.au
www kiddco.com au

This drawing (s 0 be read in
conjunction wath Enyingers Drawings &
Reports

Construction to comply
with all relevant SAA &
BCA Codes & standard
Bidy Bydaw 1975 Ras
amended

Verty all dimensions on
site prior to commencement
Of any works, These
drawings are nut to be
used for scaling
Copyright for design &
drawings remain the
property of the authors.
CONSULTANTS
Studturel Engines
Souctuca Eoghieer
Uortat

Phone

t rat

Sugeyar

Surveyor

Contact

Vnone

t mal

Private Certtigr

 

Hydraulic Engineer
Hydraulic Figinesr
Canta

Vrone

broad

eS

P8: Amended for MCU App.
16.02.09

P7: issue for MCU App. 27.01.09
Pf: Issue for information 12.12.08
P5. Issue for information 12.11.08
4: Issue for information 07.11.08
P3: fssue for information 22.08.08
P2: Issue for information 25.07.08
P1: Issue for information 22.07.08
Project

PROPOSED
RESIDENCE
Location

61 ORIENT DRIVE
SUNRISE BEACH
Client

O'BRIEN

Orawing Ie

LOWER FLOOR PLAN

Page 8

 

 

 

 

 

         

 

   

     

 

 

  
 

a x - \
ee z.annse \
a 4 6n eDOM \ \ \
a \
— — IHC, \ \ \
a Vy '
—— \ \\ \
\ \ \
” 1
2 @ \ \
\ 14
\ \ 4
| line of pool temace below \
¥ \
' line of pool below \ \ \
“ * tine of root over \ \
«?) ' Vv \
\ \ ole
\ o %
% 1G
S &
z \
% \
4 | __ line of sun control battens over \ \
: : \ ;
1 ; __ line of fly-over ruof over
\ tou “ ALFRESCO ul . \
i) \ \
(| FFL [FFL 30.2| | ) \
\ 1 . nh
I \
|
bin enclosure
| \
) \
Lime Ton \
itile i
ce j ) \ \
{ | | - } \
line of awning over Loo - )
- \
2 = 1
DRIVEWAY ig - Ll | 1 \
exposed agg. é 1
/ 7 S | : — \ 2.0m setback \
‘cation of exists | _.\ DRYING YARD below ore 4.5m setback
iT gravel | ~ 1 block bracing wall,
St sO py fow rock landscape wall refer eng. detail
i: yy Res

 

7)

&

 

GROUND FLOOR PLAN

 

SCALE 1:100

 

 

     

Of $44¢ 5633
07 $447 5833

www. kiddo. con du

Ttrs drawing is tu be read in
confunctor with Engineers Drags &
Reports:

Constructor to comply
with all relevant SAA &
BUA Codes & standard
Big By faw 1975 & as
amended

Verity all drnenskns on
Site price tb con penoer ant

 

  

drawings teman the
property of the authors

 

Contint

 

P8: Amended for MCU App.
16.02.09

P7 Issue for MCU App. 27.01.09
P6: Issue tor information 12.12.08
PS. Issue for information 12.11.08
P4: Issue for information 07.11.08
P3: Issue for
P2: issue for information 25.07 08
P4: Issue for information 22.07.08
Priyect

PROPOSED
RESIDENCE
Location

61 ORIENT DRIVE
NRISE BEACH

 

 

6 BRIEN

Drawing lite

UPPER (GROUND)
FLOOR PLAN

Gale Date

as shown @A2) Feb. ‘08
Drawn By Jub No:
LFSC 0743

Drawing No bssue No.

Page 9

8d VUG US

Of, BSS] ON Bug)
eyo Osi4]
oN or Ag UME]
90,494 Z¥@) UMOYS se
ard Sa

NW Id 400Y

age, Bulag,

N30

wag)

HOW3d ASISNNS
3AM LNAMO 19

uageo7
FONACISAY
aasod0ud

polaig

20 20'2ZZ VONeLUOYU 10} BNSS] tf
90/0 SZ UORBULIOJUY 105 BNSS| 2
Q0'RO' 22 UONeLNOpUI 16) BNSS} Ec}
201} 20 UONEULOPN JO} BNSS{ “Hej
QO FL ZL UOIPULIOGLY 104 ANSS| “Gd
QO'ZY'Zy UONeLLIOJUT 40} ANSS] “Sq
60 LOZ “Ady NOW JO} ANSS| : Jef
607091

dy NOW 40} papuany Bd

 

jenny
80

 

BO
repr)

AU EL RINSE,
sm PUNTAAS,
STNWTTASNOO

suongne aug yo Ayadoud
Sug LRU SLUMP

\y ubisap 49) yy6kkdo:)
‘fx ayerys 0) pasn

29,0) ou aie SEWARD
agen) Spo Aue A
\uEHaOKeUIIO OY loud ays
Ho SuQIsuaUap fe ALAA,
papaie

6P 9 S261 et AG fir
PURPLES 'g SAPO) YE
BY WS IUPADgA I UA
Aye 07 UOgANUFSUO)

 

quoday
1g sfwaragy smauiB A UN RINLICD
uv peas oq] 04 St Fie WANrAp St]

NE OD -OONPIY MAM
AB OD QOPPHTG;Ul

LERS ZveG 20
€€9S 2epS 20

195% GIO ShPaly BSOON,
292 X08 Od

 

296P 1D Woeag BUIYSUNS,
BONS SING G2

sisauBbisap

 

 

EOAgeag
LVVOl

 

ypeqes wig Z

 

 

Lowa
dp
mo0j3q, Burpjing yo au]

sanyo YO*P 40 BU

 

puoquoyed
Tw 4S! |

TWV4 St

puoquc1co

suayed jOQUO UNS LuMUILUINe

00114 19S

NW1d 4004

 

Page 10

=

  

 

BOUNDARY LINE

i
st
 —_Y 33,745 RIDGE

__'¥ 32,900 SPRING POINT 3,
yw

/ v

f

~

a

27,200 0WER LeveL |

 

-NORTH ELEVATION

uy
2!
3
>
i
S
Zi
3S
S|
a

YY 34,100 SPRING POINT
200

V7 32,900 SPRING POINT

VY 30,200 MID LEVEL

WV 27,200 LOWER LEVEL

 

i y
YH 30,200 MID LEVEL y Vis\ xy

We
yn

\

WN

io

“SDE 501

 

 

 

 

HE ots
Ih, \s\ \s

“ie 1M Any

SCALE1:100

 

 

 

 

 

 

 

 

 

 
  
  

“$0501

 

 

 

 

 

 

 

 

 

EAST ELEVATION

SCALE1:100

 

(BL

 

 

et sees

jee

 

2

 

~~
ERRACE

== pe

MGV

  
      
 

725

  
    

V 34.675 TOP OF BLDG

|W 33,950 SPRING POINT

VY 31,200 UPPER LEVEL

Y 27,200 LOWER LEVEL

BOUNDARY LINE

 

Ss)
eb
caLy
@s
€F
ey
BAY
a)
ey
Gt)
cy
cs)
oP)
go
6)
GH)
quay
Gan
(MR)
iy
ew)
CAB)
RED
ew)
| Ged
GR)
| GP)
i GD
| GD
, GI®
iv)
| dep
, IED
| avy
5 de)
/aD
| aw
oD

 

EXTERNAL FINISHES LEGEND

(refer to A4 schedules for material description)

 

aluminium screen.

aluminium framed louvres, refer sched.
aluminium louvres, refer sched.

aluminium framed slider, refer sched.
aluminium framed door, refer sched.
aluminium framed window, refer sched.

sun contol battens, refer detail.

balustrade type 1, refer detail.

balustrade type 1, refer detail.

masonry blockwork.

ceiling lining

concrete slab.

down pipe.

fibre cement extemal cladding

fascia gutter.

rendered hebel block

metal awning, refer detail.

polycarbonate roof sheeting, refer schedule.
metal roofing.

natural ground line.

parapet wall.

powder coated alum. battens

fridge capping.

tain water head, refer detail

silicon butt join, refer detail.

skylight refer detail & schedule

structural post, refer engineer.

soffit lining |
structural footing, refer engineer. |
stair, refer engineer. |
timber deck. \
tapered exp. rafters !
timber floor. {
turbo vent. !
timber framed door, refer sched.

timber louvre, refer sched. i
timber framed window, refer sched.
weatherboard cladding

 

:

B

AZ

 

 

6

/ YO 33,950 SPRING POINT

V7 30,200 UPPER LEVEL

‘Y_29,200 GARAGE LEVEL

Vv 27,200 LOWER LEVEL

 

designers

20 Duke Street
Sunshine Beach QLD 4567

PO Box 267
Noosa Heads QLD 4567

Telephone O7 $447 5633
Facsimile 07 5447 5833

[email protected]
www kiddco.com au

This drawing ts tu be read in
conjunction with Enginvess Diawings &
Repats

Constucton to comply
with all relevant SAA &
BCA Codes & standand
Bldg By kaw 1975 & as
amended

Verity all dimensions on.
ste por to cornmencement
of any works. These:
drawings are nollo be:
used for scaling
Copyright tor design &
drawings remain tre
properly of the authors.
CONSULTANTS
Structural Engineers
Stucturd Faghieet
Comkixt

Prost

t reveal

Suveyor

Suimeyur

Cort

Phone

tonal

Private Certiier

Pitvate Carter

Contact,

Prone

Final

Hyurauix, Coginesr
Mydraubc Engineer
Contant

Prone

Ema

PB: Amended for MCU App.
16.02.09
7: Issue for MCU App. 27.01.09
P6: Issue for intormation 12.12.08
P5: Issue for information 12.11.08
P4. Issue for information 07.11.08
P3: Issue for information 22.08.08
P2: Issue for information 25 07.08
P41: Issue for information 22.07.08
Project
PROPOSED
RESIDENCE

Location

61 ORIENT DRIVE
SUNRISE BEACH

Chent

O'BRIEN

Drawing tthe

ELEVATIONS

Scale Cate

as shown @A2 Feb. '08
Drawn By Job No
LF/SC 0743
Drawing No bssue No

9D.501 Ps

Page 11

Q
Q
OW 34,750 TOP OF BLDG

   
 
 
  
  

 

) Y_33,950 SPRING POINT

“WV 32,100 TOP of WALL

) AY 25,000 GARAGE LEVEL oe

 

27,200 LOWER LEVEL

SOUTH ELEVATION

eel
\-SD.502 ’ SCALE1:100

  
  
    

BOUNDARY LINE

Mma)

   

BOUNDARY LINE 2

POPSET

 

®

   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BOUNDARY LINE

   
  

 

 

  

   

3 w wmeorane _ f 4 O@ ek Q.
_V33,950 SPRING POINT | |. - oe OR) _ (MR)
\/ ae

ry ewe =

   

 

 

 

NNER
Pop iye& hs “ .
\ 2 31,200 uPPERLEVEL, A, hiv :

 

 

cy 4p’ Val
/ Kio tw

 

 

 

i | fxs Va
Mg nN

\ A

—

 

  

 

 

 

WY 27,200 LOWER LEVEL

 

 

 

WEST ELEVATION

“$0.502 SCALE1:100

 
  
  
  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

_ WV 4750 TOP OF BLOG

VY 33,950 SPRING POINT

YW 32,100 TOP OF WALL

_ WV 30,200 MIO LEVEL

—_Y_29,200 GARAGE LEVEL

) _ Y27,200 LOWER LEVEL

 

 

 

:

Ui |

EXTERNAL FINISHES LEGEND

 

(refer to A4 schedules for material description)

cs)
ep
A)
@s
@o
aw
(ay
ey
G12)
GK
cD
es)
(oP)
Fey
Ss)
Goat
quay
Gav
(ut)
fob
ew)
CAB)
(Re)
ey
Ge)
GK
GP)
a
(SF)
ei
ab)
qe
ary
cy)
oD
ay
aw
(we)

aluminium screen.

aluminium framed louvres, refer sched.
aluminium louvres, refer sched.
aluminium framed slider, refer sched.
aluminium framed door, refer sched.
aluminium framed window, refer sched.
sun control battens, refer detail.
balustrade type 1, refer detail.
balustrade type 1, refer detail.
masonry blockwork.

Ceiling lining.

concrete slab.

down pipe.

fibre cement extemal cladding.
fascia gutter.

rendered hebel block

metal awning, refer detail.
polycarbonate roof sheeting, refer schedule
metal roofing.

natural ground line.

parapet wall.

powder coated alum. battens

nidge capping.

rain water head, refer detail.

silicon butt join, refer detail.

skylight refer detail & schedule.
structural post, refer engineer.

soffit lining

structural footing, refer engineer.
stair, refer engineer.

timber deck.

tapered exp. raflers

timber floor.

turbo vent.

timber framed door, refer sched.
timber louvre, refer sched.

timber framed window, refer sched.
weatherboard cladding

BOUNDARY LINE

Nh 38
YN?

—-

4 U) ¥ 33,200 SPRING POINT
AN.
aN \ v
4 ;
} OY 30,200 MiD LEVEL

) WY 27,200 LOWER LEVEL

| (Gb (interpolated)

 

 

designers

20 Duke Street
Sunshine Beach GLD 4567

PO Box 262
Noosa Heads QLD 4967

Telephone 07 5447 5635
Facsimile 07 $447 5833

info@kiddco com.au
www kiddco.com.au

This drawing 6s to be read in
conjunction with Engineers Drawings &
Reparts,

Constructan to comply
with all devant SAA &
BUA Codes & standard
Bidy Bytaw 1975 & as
amended

Verity al dimensions on
site por to commencement
of any works, These
drawings ary noo De:
used for scaling
Copyright for design &
drawings remain the
property of the authors,

CONSULTANTS

  

Coat
Phone

$ ral
Sungya

Surveyor

Caehat

tone

Cmat

Pryate Certlier
Private Octttier
Conhact

Phone

(mat

Hydraulic Engineer
Hydrauke Liagineer
Conta

Phone

Frivaal

P8: Amended for MCU App.
16.02.09

P7. Issue tor MCU App. 27.01.09
P6: Issue for information 12.12.08
P5; Issue for information 12.11.08
P4: Issue for information 07.11.08
3: Issue for information 22.08.08
P2: Issue tor information 25.07.08
P14: Issue for information 22.07.08
Project

PROPOSED
RESIDENCE

Location

61 ORIENT DRIVE
SUNRISE BEACH
Chest

O'BRIEN

Driswingg Tithe

ELEVATIONS

Seale Date
as shown @A2_ Feb. 08
Drawn By Job No.
LF/SC 0743
Drawing No Issue No

SD.502 Ps

Page 12

BOUNDARY LINE

 

 

: | 8m HEIGHT (current)

 
 

 

 

 

 

_SECTIONA

SCALE1:100

existing (current) ground levei ; i 2
Be
, € A
, eh ?
natural ground level (interpolated) |
proposed finished ground level +
$D.601 -
2
4
zl
x
>
8S &
2 7 34,750 TOP OF BLDG
QZ 33,950 SPRINGPOINT |
1
| MAW)
WV 32,100 TOP of WALL : JL

existing (current) |
ground level | |
v

vm VW 23,200 GARAGE LEVEL
\4

natural ground
level (interpolated)

 

 

‘WH 27,200 LOWER LEVEL

proposed finished
ground level

 

 

(BAXFG)
wa

Mw
we

SECTION B

‘SD.601

SCALE1:100

‘Tl
|. fill to raise FGL
~ (in onder to comply with height mit regulations)

STAIRWELL

  

  
   

(in order to comply with height limit regulations)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

   

 

 

@) g
| Sm HEIGHT LMT (interpolated a, ‘2
i vy 3
; |
(Fs)
MASTERBED1| 4 < we)
|
|
1K- (WB)
i ex landscaped rock wali
cH) = | | :
fill to raise FGL
(in order to comply with height limit regulations)
- |—> 8m HEIGHT LIMIT (interpolated)
Y ¥ TV
ac co °
) FT 5 am HEIGHT (urrony J
a
KITCHEN DINING Sa) LIVING

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SECTION C

“SD.601 ” SCALET-100

 

| EXTERNAL FINISHES LEGEND

(refer to A4 schedules for material description)

CS) aluminium screen.

@ aluminium framed louvres, refer sched.
CL) aluminium louvres, refer sched.

@S aluminium framed slider, refer sched.
@0) aluminium framed door, refer sched.
@W aluminium framed window, refer sched.
(8A) sun control battens, refer detail.

1) balustrade type 1, refer detail.

@2) balustrade type 1, refer detail.

LK) masonry blockwork.

CEL) ceiling lining.

CS) concrete slab

@P) down pipe

(FC) fibre cement extemal cladding.

G) _ fascia gutter

@H® rendered hebel block

(MA) metal awning, refer detail.

@ak) polycarbonate roof sheeting, refer schedule.
(MR) metal roofing.

&G natural ground line.

@w) parapet wall.

a8) powder coated alum. battens

(RE) ridge capping.

@™) rain water head, refer detail.

G8) silicon butt join, refer detail.

Sk) _ skylight refer detail & schedule.

SP) structural post, refer engineer.

GL) © soffit fining

(SF) structural footing, refer engineer.
i _ stair, refer engineer.

Cv) timber deck.

dt tapered exp. raflers

CIF) timber floor.

GY) turbo vent.

dS) timber framed door, refer sched.
CD timber louvre, refer sched.

(IW) timber framed window, refer sched.
(w8) ~weatherboard cladding

 

BOUNDARY LINE

 

‘WY _33,750 ToP OF BLDG

(VW 30,200 UPPER LEVEL

W_27,200 LOWER LEVEL

existing (current)
ground level

proposed finished

ground level

natural ground
level (interpolated)

 

designers

20 Duke Street
Sunshine Beach Qt 4567

PQ Box 262
Noosa Heads QLD 456/

Telephone Of 5944/5633
Facsimile 07 5447 5833

intu@kiddeo com au
www kiddeu.com au

This drawing ts tu be read in
conjunction with Engineers Drawings &
Reqaats

Construction to carnply
with all relevant SAA &
BUA Codes & standard
Bluy By kaw 19/5 & as
amended

Vertty all dimensions on
ssite poor to cornmmence nant
Ul any works These:
drawings ane not tu be:
used for sealing
Copyright for design &
drawings tarnain te
propery of the authors.
CONSULTANTS
Sludural Engineers
‘Structural F ngieer
Comat

Prone

t mat

‘Surveyor

Comat

Prone

tmal

Pivale Certfier
Private Contiter

Contd

Prone

Brnaat

Hyuraule Engineet
Hydrauke Lage eer
Contant

Phone

tinal

P8: Amended for MCU App.
16.02.09
P7: Issue for MCU App. 27.01.09
P6: Issue for intormation 12.12.08
PS: Issue for information 12.11.08
P4: Issue for information 07.11.08
P3: Issue tor intonnation 22.08.08
P2: Issue for information 25.0/.08
P11: Issue for information 22.07.08
Project
PROPOSED
RESIDENCE
Locatun

61 ORIENT DRIVE
SUNRISE BEACH

Chent

O'BRIEN

Drawing fie

SECTIONS

Suale Date

as shown @A2_ Feb. '08
Drawn By Job No
LEIS 0743
Drawing No Issue No

9D.601 8

Page 13

 

| EXTERNAL FINISHES LEGEND

{refer to A4 schedules for material description)

4

designers

BOUNDARY LINE
BOUNDARY LINE

(AS) aluminium screen.
@ aluminium framed louvres, refer sched

 
 
  
  

(AL) aluminium louvres, refer sched.
V7 34,750 TOP OF BLOG

20 Duke Street

(3) aluminium framed slider, refer sched. i

e> inka ed | 8m HEIGHT LIMIT (interpolated) 7 Sunshine Beach QLD 4567
+ @O aluminium framed door, refer sched l

F\ Juminium fr window, refer sched. FG FG PO Box 26?

€¥9 aluminium framed window, refer sched gm HEIGHT (current) fo) > €9) ‘ Noosa Heatls QLD 4567

Telephone Q7 5447 S633
Facsimle 07 447 5833

(BA) sun control battens, refer detail.
1) balustrade type 1, refer detail. : o OR EE ei

 

 

G12 balustrade type 1, refer detail
t% masonry blockwork.

CL) ceiling lining

CES) concrete slab

(oP) down pipe

GC) fibre cement extemal cladding.

(FG) fascia gutter.
€H8 rendered hebel block

 

 

 

 

   

   

 

— “VY _31,200 UPPER LEVEL

 

 

[email protected]

www kiddo. com au

This drawing 6 to be readin
conjuncton with E nyineers Drawings &
Reports,

Constructor to comply
with all rekevarit SAA &

    

a) metal awning, refer detail. BLA Codes & standard
, . 1 Bidy By lew 197 & as
@a% polycarbonate roof sheeting, refer schedule. proposed finished : i amended
qu) metal roofing. ground level | & ; propesen ished Venty ai dimensions on
Gi) natural ground line exis (euren : (a 3 g MS WY _27,200 LOWER LEVEL ste prs Waneesnenaat
Le parapet wall ground level | | | | existing (current) thaws cavutiobe
| a’) powder coated alum. battens | ' | ground level sate salen
(RE) ridge capping ! | \ u bo. bo ea natural ground ' Copynight for design &
@) rain water head, refer detail. | fill to raise FGL level (interpolated) drawings rensan the
| GBD silicon butt join, refer detail. {in order to comply with height init regulations) property of the autos
(SK) skylight refer detail & schedule. ‘ CONSULTANTS
structural post, refer engineer. *
soffit lining natural ground | \ Guten
structural footing, refer engineer level (interpolated) Ine
stair, refer engineer. ou wy
timber deck. Saver
tapered exp. rafters SECTION D Contr
timber floor. OS Cima
turbo vent. SD.602 SCALE1:100 Private Ceri
timber framed door, refer sched. ‘ ee te
timber louvre, refer sched Front
timber framed window, refer sched. Lival
weatherboard cladding ‘haw ee
Unt
Nice ge
val

P8: Amended tor MCU App.
16.02.09
P7: Issue for MCU App. 27.01.09
P6: Issue for formation 12.12.08
5; Issue lor information 12.11.08
P4: Issue for information 07.11.08
P3: Issue for information 22.08.08
P2: Issue for information 25.07.08
P+: Issue for information 22.07.08
Pryect
PROPOSED
RESIDENCE
Location
61 ORIENT DRIVE
SUNRISE BEACH
Client

O'BRIEN

Drawing lite
SECTIONS

Scale Cate

as shown @A2_ Feb. ‘08
Drawn By Job No
LF/SC 0743

Drawing No Issue No.

SD.602 8

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

09_0103 - MCU - Detached House - Part 2 [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.