Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Approved Plans MCU25/0053 & OPW25/0074

of 17

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 10, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                                             GENERAL NOTES
                                                                                                                                                                                                                                                             VERIFY ALL DIMENSIONS AND LEVELS BEFORE COMMENCING WORK. DO NOT SCALE FROM DRAWING.

                                                                                                                                                                                                                                                             COPYRIGHT
                                                                                                                                                                                                                                                             THE COPYRIGHT OF THESE DOCUMENTS AND ALL WORKS EXECUTED FROM THESE DOCUMENTS
                                                                                                                                                                                                                                                             SHALL REMAIN THE PROPERTY OF THE ARCHITECT OR ON CREATION VEST IN THE ARCHITECT.
                                                                                                                                                                                                                                                             THESE DOCUMENTS MAY ONLY BE USED TO PRODUCE THE PROJECT FOR THE CLIENT AND IN THE
                      NOOSA COUNCIL                                                                                                                                                                                                                          LOCATION DESCRIBE HEREON

                                                                                                                                                                                                                                                              7               MCU RFI RESPONSE                                                    22.09.25
                      APPROVED PLAN                                                                                                                                                                                                                           6               CONSULTANT ISSUE                                                    02.05.25
                                                                                                                                                                                                                                                              5               CONSULTANT ISSUE                                                    30.04.25
                   MCU25/0053 & OPW25/0074                                                                                                                                                                                                                    4               UPDATED BASEMENT, STRUCTURE                                         11.03.25
                                                                                                                                                                                                                                                              3               GENERAL UPDATES                                                     30.01.25
                     21 NOVEMBER 2025                                                                                                                                                                                                                         2               CONSULTANT COORDINATION                                             16.01.25
                                                                                                                                                                                                                                                              1               STRUCTURAL ENG INFORMATION                                          08.01.25

                                                                                                                                                                                                                                                              REV DESCRIPTION                                                                     DATE
                                                                                                                                                                                                                                                              REVISION SCHEDULE

                                                                                                                                                                                                                                                              LEGEND

                                                                                                         A                                                                    B                          C                                                    CODE                        DESCRIPTION

                                                                                                                                                                                                                                                              AFG-01                      ALUMINIUM FRAMED GLAZING - TYPE 1
                                                                                                                                                                                                                                                              AFG-SD2                     ALUMINIUM FRAMED GLAZED SLIDING DOOR - 3-PANEL XXO
                                                                                                2005                                         11210                                     4400                   2500                                            BAL-01                      BALUSTRADE TYPE 1




                                                                               SITE BOUNDARY




                                                                                                                                                                                                                          SITE BOUNDARY
                                                                                                                                                                                                                                                              BLK-200                     190mm CORE-FILLED BLOCKWORK
                                                                                                                                                                                                                                                              CNC-PF                      CONCRETE - PAINT FINISH
                                                                                                                                                                                                                                                              PIL                         CONCRETE PILING
                                                                                                                                                                                    8M HEIGHT


                                             ROOF
                                             RL 9.800


                                                                                                                         AFG-01
                                                                                                                                                                                                                BLK-200




                                                                    3450




                                                                                                                                                                                         3075
                                                                                                                             BED 1                 WIR         BED 2               BED 3

                                             01_FIRST FLOOR
                                             RL 6.350




                                                                                                                                                                                                                AFG-01




                                                                    3650




                                                                                                                                                                                               3285
                                                                                                                    POOL TERRACE                                                   BED 4                 SIDE COURT

                                             00_GROUND FLOOR
                                             RL 2.700                                                                                                                                                                                                 DFL
                                                                                                                                                                                                                                                  RL 2.400
                                                                                                                                                                                   NATURAL GROUND LINE




                                                                    3400
                                                                                                                                     PLANT               BIN      GARDEN

                                             -01_BASEMENT                                                                                                                                                                                   PIL
                                             RL -0.700




                                                        SECTION 5
                                             1          1 : 100

                                                                                                                                                                                                                                                             GENERAL NOTES:
                                                                                                                                                                                                                                                             1.         REFER TO ARCHITECTURAL & INTERIOR FINISHES SCHEDULES FOR
                                                                                                                                                                                                                                                                        SYSTEMS, LININGS & FINISHES.
                                                                                                                                                                                                                                                             2.         ALL WET AREAS TO HAVE WET AREA PLASTERBOARD OR EQUAL.
                                                                                                                                                                                                                                                             3.         FALLS TO SCREED TO BE PROVIDED TO WET AREAS TO COMPLY WITH
                                                                                                                                                                                                                                                                        AS1428.1 GRADES FOR BATHROOM AND SHOWER FLOORS.
                                                                                                                                                                                                                                                                        UPPERMOST FFL NOTED ONLY.
                                                                                                                                                                                                                                                             4.         ALL WALLS AND PARTITIONS TO ALLOW FOR STRUCTURAL
                                                                                                                                                                                                                                                                        DEFLECTION AND STRUCTURAL MOVEMENT.
                                                                                                                                                                                                                                                             5.         REFER TO NCC REPORT & ACOUSTIC REPORT FOR ACOUSTIC
                                                                                                                                                                                                                                                                        REQUIREMENTS. ACOUSTIC LINING TO ALL TIMBER FLOORS.
                                                                                                                                                                                                                                                             6.         REFER TO NCC REPORT & ESD REPORT FOR THERMAL
                                                                                                                                                                                                                                                                        REQUIREMENTS.
                                                                                                                                                                                                                                                             7.         FIRE HYDRANT AND FIRE HOSE REEL INSTALLATIONS TO COMPLY
                                                                                                                                                                                                                                                                        WITH AS2419 AND AS2441.
                                                                                                                                                                                                                                                             8.         VERIFY ALL DIMENSIONS/SETOUTS ON SITE PRIOR TO
                                                                                                                                                                                                                                                                        CONSTRUCTION.
                                                                                                         A                                                                    B                          C                                                   9.         REFER TO CONSULTANT DRAWINGS FOR SERVICES LOCATIONS AND
                                                                                                                                                                                                                                                                        SIZES. CONTRACTOR TO VERIFY PRIOR TO CONSTRUCTION.
                                                                                                                                                                                                                                                             10.        REFER TO ELEVATIONS FOR FURTHER FINISHES AND PANEL SETOUT
                                                                                                                                                                                                                                                                        INFORMATION.
                                                                                                                                                                                                                                                             11.        ALL STRUCTURAL STEEL TO BE HOT DIPPED GALVANISED, REFER
                                                                           SITE BOUNDARY




                                                                                                                                                                                                                            SITE BOUNDARY
                                                                                                                                                                                                                                                                        STRUCTURAL ENGINEERS DETAILS
                                                                                                 2005                                         11210                                     4400                   2500                                          12.        OVERFLOW LOCATIONS TO BE COORDINATED WITH HYDRAULIC
                                                                                               SETBACK                                                                                                       SETBACK                                                    ENGINEER, OVERFLOW REQUIRED BY THE HYDRAULIC ENGINEER TO
                                                                                                                                                                                                                                                                        BE COORDINATED WITH THE ARCHITECT.
                                                                                                             8M HEIGHT                                                                                                                                       13.        REFER TO ELEVATIONS FOR FACADE SCREEN SET-OUT.
                                                                                                                                                                                                                                                             14.        ALL EXPOSED CONCRETE WALLS/COLUMNS TO BE CLASS 2 FINISH.
                                                                                                                                                                                                                                                                        ANY BACK OF HOUSE CONCRETE WALLS/COLUMNS TO BE CLASS 3
                                             ROOF
                                                                                                                                                                                                                                                                        FINISH.
                                             RL 9.800
                                                                                                                                                                                                                                                             15.        DISCONTINUOUS CONSTRUCTION AS REQUIRED TO COMPLY WITH NCC
                                                                                                         CNC-PF                                                                                                                                                         REQUIREMENTS.
                                                                                                                                                                                                                                                             16.        ROOF VENTILATION REQUIRMENTS BY OTHERS. CONTRACTOR TO
                                                                                                                                                                                                                                                                        VERIFY PRIOR TO CONSTRUCTION.
                                                                    3450




                                                                                                                                                                       HALL
                                                                                                         BAL-01

                                             01_FIRST FLOOR
                                             RL 6.350




                                                                                                                                         AFG-SD2
                                                                    3650




                                                                                                                                                                                                                                                             bureau^proberts PTY LTD
                                                                                                                                                                                                                                                             ABN 53 073 087 993 ACN 073 087 993
                                                                                                                                                                                                                                                             LEVEL 14, 100 CREEK STREET, BRISBANE QLD 4000, GPO Box 3204 QLD 4001
                                                                                                                                                                                  FAMILY                                                                     P: 07 3221 0672 F: 07 3221 0683 EMAIL : [email protected] www.bureauproberts.com.au
                                                                                                                                                                                                                                                             CLIENT:
                                             00_GROUND FLOOR
                                             RL 2.700                                                                                                                                                                                                 DFL    SEYMOUR GROUP
                                                                                                                                                                                                                                                  RL 2.400   PROJECT:
                                                                                                             NATURAL GROUND LINE                                                                                                                             NOOSA RESIDENCE
                                                                                                                                                                                                                                                             ADDRESS:
                                                                    3400




                                                                                                                                                                         GARAGE                                                                              7 NOOSA PARADE

                                             -01_BASEMENT
                                             RL -0.700                                                                                                                                                                                                       DRAWN BY:                                                                                  NORTH:
                                                                                                                                                                                                                                                                                                      TH
                                                                                                                                                                                                                                                             CHECK BY:
                                                                                                                                                                                                                                                                                                      JC
                                                                                                                                                                                                                                                             PROJECT
                                                                                                                                                                                                                                                             ARCHITECT                                JC
                                                                                                                                                                                                                                                             DESIGN
                                                                                                                                                                                                                                                             ARCHITECT                                AB
                                                                                                                                                                                                                                                                                                                                                            SCALE:


                                                        SECTION 6                                                                                                                                                                                                                                                              5             1 : 100 [A1]
                                             2          1 : 100
                                                                                                                                                                                                                                                             DRAWING TITLE:

                                                                                                                                                                                                                                                             SECTIONS 5 & 6

                                                                                                                                                                                                                                                             CAD FILE REF:                                                                                   DATE:
                                                                                                                                                                                                                                                             C:\_Revit Local\24048_7 Noosa Parade_B.A_larissaf4R2ZR.rvt
                                                                                                                                                                                                                                                                                                                                                    22.09.25
                                                                                                                                                                                                                                                             PROJECT NO:                             PHASE:               DRAWING NUMBER:             REVISION:


                                                                                                                                                                                                                                                             24048                                        B.A.            AR 40.03                             7
                                                                                                                                                                                                                                                                                                                                                 22/09/2025 3:37:15 PM


Document Set ID: 24149760
Version: 1, Version Date: 26/09/2025

Used in these records

About this file

File size
6.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans MCU25_0053 & OPW25_0074.pdf · 6.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.