Council archive · source document
Decision Notice - 010.2009.00000945.001 [As Published] SUPERCEDED · 142009.945
2009/945
ensuring that the sediment and erosion control measures have been designed by an RPEQ or
CPESC and constructed:
18.1. In accordance with "best practise" methods,
18.2. Revised by an RPEQ or CPESC to address the issues raised by changes in the
projected construction schedule and methods,
18.3. Revised to address predicted rainfall events, and
18.4. Achieve the desired environmental outcomes.
Council’s Chief Executive Officer may request further controls to be installed should approved
measures be inefficient.
19. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will
be imposed on construction works during the maintenance period, which is a minimum period
of 12 months duration. Such bond must be lodged by, and shall only be accepted from the
Developer for the works.
20. The works to become Council assets will not be accepted "On Maintenance" until the
landscaping is completed.
21. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply
5 REFERRAL AGENCY CONDITIONS
Not Applicable.
6 APPROVED PLANS
The approved plans for this development approval are listed in the following table:
Plan No. Rev. Plan Name Date
09541 C1 E Earthworks Plan by Tod Consulting 10 September 2009
09541 C2 D Earthworks Plan by Tod Consulting 10 September 2009
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” (Form 2Development
Application) under the Integrated Planning Act 1997 must be made. Amended plans clearly
indicating the changes must be lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
Page 4 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2009.00000945.001 [As Published] SUPERCEDEDRelated documentApplication case desk ↗
About this file
- File size
- 57 KB (small file)
- File type
No other editions are linked here.