Original source · versioned page text
Effluent Disposal Report_compressed
Notes
Levels shown are
approximate and are sourced
from local council mapping N
or information provided by
the client. These levels are
solely to demonstrate the
functionality of the system.
Actual floor height is to be
confirmed with the builder
prior to installation.
All pipe work from the
structure to the proposed Proposed
system should be covered Amenities Block
and adequately vented and Proposed Advanced (Approx RL 81)
Proposed
be vermin/insect proof. Secondary
0m 4000L
All work carried out should 29 Treatment Plant
Septic
meet relevant (Approx RL 83) Proposed
Tank
codes/standards and be done 4000L
by an appropriately qualified Septic
and licensed person. Tank
Proposed system should be
constructed in a way to Proposed Proposed
maximize evapotranspiration Amenities Block 450L
and minimize potential (Approx RL 84) Pump
pooling and runoff. Well
If plans were not available at
the time of investigation
further reporting and design Proposed
work may be needed prior to 4000L
council submission and Septic 32-40mm Pump Well line
installation. Proposed Tank (Burried in a 200mm sand layer)
Care is to be taken not to Amenities
compact,smear or damage Block
the soil structure during
installation (This can lead to
premature failure).
If structures have been built
since our initial investigation
(Including neighboring
82m
structures) please contact us
to confirm this will not
adversely effect the design.
Final landscaping and BH4
installation should discourage PT2
and limit causal pedestrian
BH5
access.(By way of plantings, 32mm Delivery line
PT3
border, mounds, visual and (Burried in a 200mm sand layer)
or physical deterrents)
The owner should obtain
knowledge on how to use
Slope
and maintain the proposed BH3
16-22%
system. Most of this is PT1
available from your chosen
supplier/installer.
This report must be Reserve Area Proposed Surface
approved by the local council Irrigation Area - 400sqm
prior to any work (10x 40m)
commencing. (Approximate RL 101)
The effluent disposal
report must be
accompanied by a Site
Classification Report. If
the Site Classification is
H1,H2, E or P an
articulation joint will need
to be designed by a
person licensed to do so.
Client- QRE Consruction
Site - 332 Eastern Branch Road, Kin Kin
Ground Drill Pty Ltd
Date - 11/11/22
Abbreviations Sunshine Coast, QLD.
Job# - 22/388
BH : Borehole DCP : Dynamic Cone Penetrometer QBCC # 150 345 80
Scale - 1 : 2000 @ A4 (Site features are approximate-Do not scale)
PT : Percolation Test HD : Heavy Droplet Lilac Sprinkler E: [email protected]
TV : Turf Valve RWT : Rain Water Tank W: www.grounddrill.com.au
P: 0407 035 220
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original