            21st October 2022

            Ref:        MCU22/0097

            Ms G Schramm
            PO Box 141
            Tewantin, QLD 4565


            Attention:          Georgina Schramm

            Dear Ms Schramm,

                        Re:     Information Request – Pomona Distilling
                        At:     14-16 Reserve St, Pomona QLD, 4568

            With reference to the abovementioned development application and the subsequent
            information request from Council, we have prepared a response to the engineering matters
            raised as follows.

            Stormwater Management
               9. Provide a preliminary Stormwater Management Plan demonstrating how the
                  stormwater generated by the hardstand of the proposed smokehouse and other
                  impervious areas (landscaped, carpark) will be collected and released. The
                  Stormwater Management Plan must be prepared by a suitably qualified person
                  and include, but not be limited to:
                  a) a Lawful Point of Discharge; and
                  b) details (FSLs, invert levels, etc.) of the existing on-site stormwater system

            Please see the attached Stormwater Management Plan which includes the requested
            details.

            Vehicle Access
              10. Provide additional comment demonstrating how the proposed access will
                   function. The additional comment should make reference to:
              a. the type (foot, vehicle, etc.) and volume of traffic the access will serve; and
              b. if both venues can function independently without the proposed access.

            The driveway will continue to function as per it’s existing use. A concrete footpath
            along the southern side of the driveway access will cater for foot traffic, while the
            existing car parking area will accommodate up to 20 vehicles at a time with two
            scooter spaces also provided.

            In accordance with the NSW RTA Guide to Traffic Generating Developments 2002, the
            average restaurant facility trip generation rates (a trip defined as a one directional
            movement, either a vehicle entering or a vehicle leaving the site) can be estimated as:

                    -   Evening peak hour vehicle trips – 5 per 100m² gross floor area
                    -   Daily vehicle trips – 60 per 100m² gross floor area
                    -   Mean vehicle occupancy – 2.2 people / vehicle

P +61 7 5211 1003             A 75 Noosa Dr, Noosa Heads Qld 4567   E [email protected]   recorconsulting.com
Log in to download the original file

Appendix B - Engineering Cover Letter Response.pdf · 181 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.