Council archive · source document
07/1849 - Op Works - Residential Subdivision [As Published] · 142007.1849
INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
‘infermaticn about prescribed tidal work refer to
Guide 24.
Hyou answered "YES" to Q12, the appfication
tiggers referral to the Port Authority.
The Port Authority is.a concurrence agency if the
development is —
* ‘within 200m of a shipping channel or an entry
and exit shipping corridor for the port
© within 1000m of a swing basin, a commercial
shipping- wharf, a mooring, anchorage or spoil
grounds; - . 1
within 1000m of a planned port facility
Identified in a tand use plan approved under
the Transport infrastructure Act 1994.
in all other situation the Port Authority is an
advice agency.
Marinas
For more information refer to. Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local
government is the assessment mariager for alll
prescribed tidal work.
If you answered "YES" to Q13, the application
triggers referral to Queensland Fire and Rescu
Service as an advice agency. :
12.
13.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark’8 and within the limits of a port
under the Transport Infrastructure Act 1994?
NO
(DYES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Does the application involve operational work that is tidal work for a marina! with more than 6
- vessel berths? - :
[XINO |
[1 YES - complete Part M of Form 1, or Part P of Form 4 if the tidal work is prescribed tidal work
Tidal works in strategic port land.tidal
* areas
For fhore Information refer to Guide 18,
Unless you answeted “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmentat Protection
Ageney (EPA) and Queenstand Transport (QT)
are concurrence agencies for the apptication.
Heritage :
For further information refer. to Guide 19.
lf you answered “YES” to Q15, the application
triggers referral to the Queenstand.Heritage
Council as concurrence agency for the
application.
Unless you answered “none of the above" to
Qt5(b), the application invotves referral to the
Environmental Protection Agency as an advice
agency for the application
15.
Does the application involve tidal works within a strategic port land tidal area20?
[X] NO
oO YES - complete Part M of Form 1
Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
NO :
[1 YES - complete Part C of Form 1
15(b)The application involves: (tick applicable boxes)
(i) a material change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
Oi iii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
Ci (iii) none of the above.
Declared catchment areas
For more information, including a list of the
dectared catchment areas within Queensland,
Fefer to Guide 13,
Uniess you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Resources and Water
(NRW).
if an agency other than NRW is the assessment
manager for the application, NRW is a
concurrence agency for the application in
relation to this matter.
16.
The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: {tick the applicable boxes)
Ci (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
QO (ii) devetopment assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994:
XJ (iii) none of the above
18 High water mark-is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide,
19 Marina is defined in the Transport Operations (Maritime Pollution} Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land,
Page 5.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1849 - Op Works - Residential Subdivision [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.