Skip to the record
Search everything, all in one place.

Council archive · source document

07/1849 - Op Works - Residential Subdivision [As Published] · 142007.1849

of 23

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997
Works in tidal areas, coastal
management districts and fish habitat
areas

If you answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wild
Rivers Code.

lf you answered YES to Q5 and ticked box i} in
Q6, your application is required to be referred to
the EPA.

Note: If specified works are proposed in a local
goverment area, it is prescribed tidal work - the
relevant local government will be the
assessment manager with the EPA as a
coneurrence agency

if you answered YES to Q5, and ticked box i) or
iil) in Q6, your application requires referral to
OPIF.

if you answered NO to O5 and ticked box j) in
Q6, the application will not be accepted.

If you answered NO to Q5, ticked box ii} in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not required, or if a
Fequired permit is held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
Not be accepted.

{f you answered NO at Q5 and ticked box iil) in
Q6, the application may be made if the works are
ina PA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.

For more information about specified works refer
to Guide 27

IDAS Assessment Checklist, Version 20, 2 April 2007

Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

(no Clyes

The application is for one or more of the following:

0 i) Operational works that is tidal works or works in a coastal management district (ensure you

have completed Part M and/or Part P of Form 1); of

oO ii} Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 4); or

(7 ili) Buitding or operational works in a fish habitat area (ensure you have completed Part Oz of Form 1).

 

Residential, commercial or industrial
development

If you answered YES to Q7, your application is
Not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild
river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2.

if you answered NO to Q7 and ticked either box
#} or ii) in Q8, the assessing agency is the
relevant toca! govemment, The application must
be assessed against and must comply with the
Wild Rivers Code.

8.

ls the application for residential, commercial or industrial development in a designated urban

area?

(no Dyes

If NO, does the application for residential, commercial or industrial development involve:
Ol i) a material change of use made assessable in a local government planning scheme

(ensure you have completed Part D of Form 1); or

im it) operational works associated with reconfiguring a lot (ensure you have completed Part F

of Form 1}.

 

Animal husbandry activities

If you answered YES to Q9 your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wikd Rivers Act
2005 and refer to Guide 27.

Does the application involve a material change of use for animal husbandry activities (as defined

under the Wild Rivers Act 2005) in a PA?

NO Oo YES (ensure you have completed Part R of Form 1)

 

Agricultural activities

if you answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.

The assessing agency is NRW.

Note: Applications for agricultural activities will
hot be accepted if proposed in a HPA. For more
details and a definition of agricultural activities
see the Wid Rivers Act 2005 and refer to Guide
27.

The production of fodder in a PA, and pasture
improvement using low impact soil disturbance
fechniques Is not an agricultural activity as
defined under the Wid Rivers Act 2005. For
more infomation see Guide 27.

 

10.

Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in

a PA?

O NO (1 YES (ensure you have completed Part Q of Form 1)

lf YES is the application for:

(1 i) a material change of use; or

LJ ii} operational works.

 

Page 12

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1849 - Op Works - Residential Subdivision [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.