Original source · versioned page text
Town Planning Report
Attached to the e-mail Ent & Dining Business - Type 2 Recreation Amusement & Fitness (swim school) - MCU17/0550.
5. Additional Planning Considerations
5.1 Waste Management
The existing site has a waste collection point which will be utilised by the proposed land use.
All waste associated with the fit-out of the site will be collected in a skip bin located within
the tenancy during construction and emptied as required.
Given the proposed use of the site as a swim school there will be very little waste generated
from the site on an ongoing basis. Waste generated from the site will be incorporate a
typical small office / retail waste stream including paper and general waste. In addition to
this when children come to site, this will generate waste nappies from younger children. All
waste can be easily disposed of in either a small commercial bin or standard wheelie bin and
picked up on a weekly basis.
Figure 7.0 – Waste Storage Area
5.2 Amenity
The use is not anticipated to have a negative impact on surrounding land uses given the
proposal seeks a change of use only and internal fit-out and will complement the existing
commercial character of the area. Given the scale of the proposed use and the operating
hours between 7am – 8pm Monday to Sunday the development will not have any impact on
the amenity of the surrounding locality as the use is entirely contained within an existing
building with no openings to the rear of the tenancy open during the hours of operation. It
is also noted that there is an existing tenancy – Noosa Cross-Fit Gym within the same
complex. These two uses are compatible and similarly defined under the Noosa Plan 2006.
16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.