possible for the future dwelling on the site with residents able to seek refuge in a PMF event within
future dwellings.
The applicant has also submitted a Stormwater Management Plan and Engineering plans detailing
proposed driveway works required to address address the risk of flooding associated with access
and egree from the site.
Councils Development Engineer has reviewed the information and provided the following
comments:
Council’s flood mapping indicates that the site will be impacted by flooding (along the
watercourse) and indicates that Jirrima Crescent is also impacted by flooding (approximately
150m south of the subject site). In order to determine a suitable standard for the internal
access it was agreed that the internal access be constructed to the same immunity as Jirrima
Crescent. The existing flood model was accessed by Council’s external consultant and the
criteria provided to the applicant’s engineer. The submitted SWMP provides comment on the
determined immunity and the engineering design for the access driveway has included
drainage features for conveyance of water and the required flood immunity. Relevant
conditions have been included in the recommendation.
The western part of the site is mapped as being affected by the flood hazard overlay. It is
noted that the proposed plans indicate a building envelope within Lot 2 that is clear of the
flood hazard mapping overlay. It is considered that no further action is required to ensure
that development is not located within the flood hazard overlay.
Biodiversity, Waterways and Wetlands Overlay Code
The lot includes a mapped waterway that transects the central portion of the site running in a
northerly direction and has a mapped riparian buffer area with a width of approximately 165m. The
waterway has historically been dammed with scattered regrowth vegetation consisting
predominantly of Melaleuca Quinquenervia along the banks of the waterway with a small section
at the southern end mapped as biodiversity significance.
Figure 4 - Noosa Plan 2020 – Biodiversity, Waterways and Wetlands Overlay
The applicant proposes that the full extent of the riparian buffer should not be protected by a
vegetation covenant due to it not meeting the definition of an ‘ecologically important area’. The
applicant states the Noosa Plan 2020 Ecological Important Area definition means it is limited to the
natural waterway, riparian zone and riparian vegetation defining the riparian zone is the land within
10m of the adjoining waterway. As part of the applicant’s response to Councils information request
the applicant states:
In response to council’s information request, it was proposed that the waterway transecting
the site would be rehabilitated 10m either side of the defining bank, which is consistent with
Page 5 of 13
Document Set ID: 22511485
Version: 7, Version Date: 31/07/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.