Council archive · source document
MCU21-0156-ICN.N1730-89,91&93 Eumundi Noosa Rd NOOSAVILLE · MCU21/0156
INFRASTRUCTURE CHARGE CALCULATION DETAILS:
The infrastructure charge is calculated in accordance with Council’s Infrastructure Charges Resolution incorporating the charge apportionment (break-up) agreement with Unitywater in
compliance with the planning legislation and regulations applying at the time of issuing the notice.
NOOSA SHIRE COUNCIL CHARGES RESOLUTION (No.6) 2021 (Effective 20 August 2021)
The Noosa Plan 2006 Planning Regulation 2017 &
(Superseded planning scheme) The Noosa Plan 2020
Current at: 1 July 2021 for the 2021-2022 Financial Year
Column 1a Column 1b Column 2 Column 3 MCU21/0156
COUNCIL COUNCIL
Planning Regulation 2017 COUNCIL CHARGE CALCULATION
APPORTIONMENT CHARGE
Schedule 16 Prescribed amount NET
Use Use
(As inserted by the “Planning Legislation (Fees and Other (per Charges breakup agreement APPROVED EXISTING CHARGE
CHARGEABLE
Amounts) Amendment Regulation 2021”) of Prescribed amount) QTY QTY AMOUNT $
QTY
for each Residential lot
Residential - Reconfiguration of a lot Residential - Reconfiguration of a lot $30,677.65 60% $18,406.59 3 -3 -$55,219.77
(equivalent to 3 or more bedroom dwelling)
Residential uses
for each dwelling with 3 or more bedrooms $30,677.65 60% $18,406.59 4 4 $73,626.36
• Detached house
1 Dwelling house
• Ancillary dwelling unit for each dwelling with 2 bedrooms $13,147.56 18 18 $236,656.08
2 Dual occupancy
Multiple housing
3 Caretaker’s accommodation for each dwelling with 1 or less bedrooms
• Type 2 Duplex $21,912.60 60% $8,950.41 0 $0.00
4 Multiple dwelling (Council reduced rate by -31.9%)
• Type 4 Conventional
for each dwelling if Secondary dwelling to
$6,534.01 0 $0.00
Dwelling house (Council reduced rate by -50.3%)
Sub-Total, Residential = $255,062.67
Calculation at
Planning
Regulation
2021-2022
Financial Year
CALCULATED INFRASTRUCTURE CHARGE = $255,062.00
Transport and/or Stormwater network service reductions due to
Location $0.00
development location
Council Policy “Infrastructure Charges Rebates For Community
Rebate $0.00
Organisations”
REDUCTIONS
Trunk Infrastructure Offset Conditiion 30 for trunck pathway upgrade $0.00
Other $0.00
*NET INFRASTRUCTURE CHARGE PAYABLE = $255,062.00
PO Box 141 P. (07) 5329 6500 [email protected]
TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au ICN - Page 3
[OCR of page images]
INFRASTRUCTURE CHARGE CALCULATION DETAILS:
The infrastructure charge is calculated in accordance with Council’s Infrastructure Charges Resolution incorporating the charge apportionment (break-up) agreement with Unitywater in
compliance with the planning legislation and regulations applying at the time of issuing the notice.
NOOSA SHIRE COUNCIL CHARGES RESOLUTION (No.6) 2021 (Effective 20 August 2021)
The Noosa Plan 2006
Planning Regulation 2017 &
Current at: 1 July 2021 for the 2021-2022 Financial Year
(Superseded planning scheme) The Noosa Plan 2020
Column 1a Column 1b Column 2 Column 3 MCU21/0156
COUNCIL COUNCIL
Planning Regulation 2017 APPORTIONMENT | CHARGE COUNCIL CHARGE CALCULATION
us u Schedule 16 Prescribed amount NET
se se (As inserted by the “Planning Legislation (Fees and Other | (per Charges breakup agreement |APPROVED| EXISTING CHARGEABLE CHARGE
Amounts) Amendment Regulation 2021”) of Prescribed amount) Qty Qty arty AMOUNT $
fe h Residential lot
Residential - Reconfiguration of a lot Residential - Reconfiguration of alot (equivalent to Smee bedroom dwelling) $30,677.65 60% $18,406.59 3 3 -$55,219.77
Residential uses
for each dwelling with 3 or more bedrooms $30,677.65} 60% $18,406.59} 4 4 $73,626.36}
* Detached house 1 Dwelling hi
* Ancillary dwelling unit welling nouse for each dwelling with 2 bedrooms $13,147.56] 18 18 $236,656.08
2 Dual occupancy
Multiple housing 3 Caretaker’s accommodation i
* Type 2 Duplex a Multiole dusollie for each dwelling with 1 or less bedrooms $21,912.60 60% $8,950.41 0 $0.00)
«Type 4 Conventional pl ig (Council reduced rate by -31.9%)
for each dwelling if Secondary dwelling to
6,534.01 0 0.00)
Dwelling house (Council reduced rate by -50.3%) $6 .
Sub-Total, Residential = $255,062.67
Calculation at
Planning
Regulation
2021-2022
Financial Year
CALCULATED INFRASTRUCTURE CHARGE = $255,062.00
Transport and/or Stormwater network service reductions due to
Location $0.00
development location
Rebate Counc Paley Infrastructure Charges Rebates For Community $0.00
REDUCTIONS rv
Trunk Infrastructure Offset Condition 30 for trunck pathway upgrade $0.00
Other $0.00
*NET INFRASTRUCTURE CHARGE PAYABLE =| $255,062.00
Ti Q ~ TY PO Box 141 P. (07) 5329 6500 [email protected]
S
NOOS A. COUNCIL TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qid.gov.au ICN - Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
MCU21-0156-ICN.N1730-89,91&93 Eumundi Noosa Rd NOOSAVILLERelated documentApplication case desk ↗
About this file
- File size
- 614 KB (small file)
- File type
No other editions are linked here.