2. All structures associated with the boat ramp must be constructed wholly within the approved
Resource Entitlement Area.
3. Structures shall be designed and constructed such that they are free standing within the
waterway and property and are not connected to the revetment wall.
4. There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall.
5. Lighting associated with the use shall be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
6. Use of the boat ramp is for private purposes only; no commercial operations are to be
undertaken.
7. Boat repair activities will not be permitted on site.
8. Wastewater and sullage shall only be disposed of at approved pump out facilities.
9. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
1994 and the Environmental Protection (Water) Policy 1997.
10. The approval or conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangements to ensure adequacy of design and work. Also any
approval granted does not warrant that such plans and specifications have been checked in
detail, nor does it absolve the owner of the land from complying with all the conditions of this
approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or
statutory regulations in the execution and/or performance of said works. The Council does not
accept any responsibility for the accuracy of such plans and specifications as approved.
11. Certification by a Registered Professional Engineer of Queensland shall be submitted to
Council prior to the return of any bond monies held by Council. The certification shall state that
the boat ramp has been constructed in accordance with best practice methods, is in
accordance with Coastal Protection and Management Act 1995, is structurally sound, and will
have no detrimental affect on the existing revetment walls.
12. A final inspection and approval of the structure by Council’s Inspector is also required prior to
the return of any bond monies held by Council. Please contact Council’s Operational Works
Assessment Branch to arrange the inspection.
13. The Development Permit for Operational Works (Prescribed Tidal Works – Boat Ramp) lapses
if the works have not been completed by 15 September 2011, unless an application to extend
the relevant period is approved by Council.
14. The boat ramp shall be licensed with the Council upon completion of the structural work and
shall be licensed annually thereafter.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Referral Address
Agency
Prescribed Tidal Works Concurrence Maritime Safety Marine Operations (Brisbane)
not in a canal and has Queensland MacArthur Avenue East
no more than 6 vessel PINKENBA QLD 4008
berths
Page 2 of 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2009.00001065.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 140 KB (small file)
- File type
No other editions are linked here.