Amended Negotiated Decision Notice RAL20-0021 [As Published]
i. A grassed detention swale is not supported as CEPTD requirements can be achieved
with low shrubbery and native grasses, the planting of vegetation reduces
maintenance costs into the future.
3. CURRENCY PERIOD OF APPROVAL
The currency period for this development approval is stated in the conditions below.
4. ASSESSMENT MANAGER CONDITIONS
Approved Plans
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
20-5179AN B Plan of Proposed Reconfiguration of Lot 3 23.04.2021
on RP 113733
2. All lot numbering on the subdivision plan to be submitted to Council for the plan sealing
application must remain as shown on the Approved Plans.
3. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
Currency Period
4. This development approval lapses if the use has not happened by 30 April 2025, unless an
application to extend the currency period is approved by Council.
Performance Bond
5. Prior to arranging a Prestart meeting for the operational works, a security bond in the form
of a cash bond or trading bank guarantee to the sum of $30,000 must be submitted to
Council, to secure the performance of all conditions of this approval. The cash bond or
trading bank guarantee will be returned on performance of the conditions of approval less
any costs incurred by Council in respect of enforcing performance of this permit. Council
reserves the right to call upon the bond or guaranteed sum to effect compliance with
conditions.
Dedication of Land as Reserve
6. The area identified as ‘Lot 100 Park’ on the approved plans must be dedicated to the Council
in fee simple on trust as a reserve for the purpose of an Environmental Park purposes.
Condition 6 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
infrastructure.
Works within Protected Land
7. The following works must be undertaken within the land to be dedicated to the Crown as a
reserve for the purpose of an Environmental Park and Lot 99 RP881300:
a. The construction of a pathway in accordance with drawing number 2035-01 (master
Layout & SWMP Plan 1of 3) Rev E dated 16.04.2021.
b. Rehabilitation of the park area within the proposed Lot 100 – Environmental Park.
c. Revegetation of the riparian width only of the constructed waterway within proposed
Lot 100 and existing Lot 99 in RP881300.
Page 2 of 19
Document Set ID: 21606483
Version: 1, Version Date: 07/09/2021