Original source · versioned page text
C2. Eng Report
Attached to the e-mail Response to Information Request - MCU17/0572 & OPW17/0611.
Original PDF page 98, section 1. The text section number identifies this passage in the reader.
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
O10 S10.1 ✓
Development design and operation facilitates nil increase in Methods to prevent gross pollutants entering stormwater
gross pollutants entering stormwater systems. systems and waterways are adopted that—
a) are low maintenance; To be complied with at detailed
b) prevent nutrient leaching in the event scheduled design / construction stages.
maintenance is delayed; and
c) facilitate human behaviour change (e.g. Refer to civil engineering report,
signage, bins). in specific stormwater quality
section prepared by this office.
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 5 of 5
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.