Original source · versioned page text
C2. Eng Report
Attached to the e-mail Response to Information Request - MCU17/0572 & OPW17/0611.
Original PDF page 164, section 1. The text section number identifies this passage in the reader.
All Optus pits and manholes should be a minimum of 1.0m in from the back of kerb or within 15m of street intersection after the completion of your work. All Optus conduit should have the following minimum depth of cover after the completion of your work:- • Footway 600mm • Roadway 1000mm at drain invert and at road centre crown In cases where it is considered that these clearances cannot be maintained at the completion of works advice is to be sought form the Optus Damages and Relocations Team FURTHER ASSISTANCE Assistance can be obtained by contacting Optus Network Operations Asset Analysis on 1800 505 777 Where an on-site location is provided, the owner is responsible for all costs associated with hand digging or use of non-destructive water jet method (pot holing) to visually locate and expose Optus plant. If plant location drawings or visual location of Optus plant by digging reveals that the location of Optus plant is situated wholly or partly where the owner plans to work, then Optus Damages and Relocates Team must be contacted through Optus Network Operations Asset Locations to discuss possible engineering solutions. OPTUS ENGINEERING DRAWING SYMBOLS Optus Communications Page 4 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.