C2. Eng Report
Attached to the e-mail Response to Information Request - MCU17/0572 & OPW17/0611.
Original PDF page 179, section 1. The text section number identifies this passage in the reader.
whichever the least. Regardless of whether the surface is being raised or lowered, any work impacting the
depth of cover of Telstra underground assets should not commence before consultation with Telstra Network
Integrity representatives, to discuss the possibility of ‘protection’ or relocation (including lowering of the
asset)”.
For clearance distances relating to Telstra pillars, cabinets and RIMs/RCMs please contact Telstra Plan
Services.
If Telstra plant is situated wholly or partly where you plan to work (i.e. in conflict), then Telstra's Network Integrity
Group must be contacted to discuss possible engineering solutions.
Please phone 1800 810 443 or email [email protected]
You are not permitted to relocate or alter or repair any Telstra assets or network under any circumstances.
It is a criminal offence under the Criminal Code Act 1995 (Cth) to tamper or interfere with
communication facilities owned by a carrier. Heavy penalties may apply for breach of this prohibition,
and any damages suffered, or costs incurred by Telstra as a result of any such unauthorised works
may be claimed against you.
Only Telstra and its contractors may access and conduct works on Telstra’s network (including its plant and
assets). This requirement is to ensure that Telstra can protect the integrity of its network, avoid disruption to
services and ensure that the relocation meets Telstra’s requirements.
If Telstra relocation or protection works are part of the agreed solution, then payment to Telstra for the cost of
this work shall be the responsibility of the principal developer, constructor or person for whom the work is
performed. The principal developer or constructor will be required to provide Telstra with the details of their
proposed work showing how Telstra's plant is to be accommodated and these details must be approved by
the Regional Network Integrity Manager prior to the commencement of site works.
Please phone 1800 810 443 or email [email protected]
Further information -
https://www.telstra.com.au/consumer-advice/digging-construction/relocating-network-assets
Damage to Telstra's network must be reported immediately -
https://service.telstra.com.au/customer/general/forms/report-damage-to-telstra-equipment
You will be held responsible for all plant damage that occurs or any impacts to Telstra’s network as a result of
your construction activities. This includes interfering with plant, conducting unauthorised modification works
and interfering with Telstra’s assets in a way that prevents Telstra from accessing or using its assets in the
future.
Telstra reserves all rights to recover compensation for loss or damage to its cable network or other property
including consequential losses.
_____________________________-----______________________________________________________________
FURTHER INFORMATION - CONTACTS
NATURAL DISASTERS
Natural Disasters include (amongst other things) earthquakes, cyclones, floods and tsunamis.
In the case of such events, urgent requests for plans or information relating to the location of Telstra network
can be made directly to Telstra Network Integrity Team Managers as follows:
NSW – John McInerney 0419 485 795
NT/WA/QLD – Glenn Swift 0419 660 147
SA/VIC/TAS - David Povazan 0417 300 947
TELSTRA CORPORATON ACN 051 775 556 DOC Version 28 (20th October 2017)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.