C2. Eng Report

Attached to the e-mail Response to Information Request - MCU17/0572 & OPW17/0611.

of 189

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 29, section 1. The text section number identifies this passage in the reader.

                                                    Proposed Service Station – 175 Eumundi Noosa Road, Noosaville
                                                                                 Ref: 20769 C R001 Rev 06 09.02.17
                                                                                                    February 2018


16       CONCLUSION
         The site appears to be well serviced by reticulated water, stormwater infrastructure, sewerage,
         communications and electricity. These services will need to be connected during development.
         Information discussed in this report is inferred from DBYD records and information gathered via site
         investigation.

         To understand with greater certainty the requirements from Unitywater (UW) for this development, a
         Service Advice Notice Request has been prepared and lodged with UW with an expected issue date
         November 2017. The required infrastructure will be subject to the conditions attached to the
         Development Approval to be provided by Noosa Shire Council and any nominated referral agencies.

         As outlined in Section 8 of this report, ADG recommends no inclusion of on-site detention measures
         due to no net increase in post-development peak flow and an overall site reduction of impervious
         areas.

         In preparing this report, we have achieved all requirements for Stormwater Management Plans as
         described in QUDM 2013 standards, as well as a pollutant load reduction as required by the SPP
         2017 and Noosa Shire Council standards. ADG recommends the use of the following treatment
         devices to meet the treatment targets specified by the relevant authorities:

            SPEL Puraceptor (High-Risk Area Only)

            StormSack (or approved equivalent)

            Gross Pollutant Trap (GPT)

            First Flush Device/s

         Detailed engineering diagrams and management requirements for the proposed development are to
         be submitted to Council for approval prior to any works commencing on site in accordance with an
         Operational Works Approval with design certification prepared by a qualified stormwater engineer or
         scientist.




BRISBANE / SYDNEY / MELBOURNE / GOLD COAST / SUNSHINE COAST / DARWIN / PERTH                              Page 28
Log in to download the original file

C2. Eng Report.pdf · 8.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.