Original source · versioned page text
C2. Eng Report
Attached to the e-mail Response to Information Request - MCU17/0572 & OPW17/0611.
Original PDF page 41, section 1. The text section number identifies this passage in the reader.
Noosa Shire Council – The Noosa Plan
Building Works Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
O4 S4.1 ✓
Filling or excavation does not adversely affect sewer, Fill material placed over services does not impose any
stormwater or water utility infrastructure. additional surcharge loading on the service.
To be complied with at detailed
Editor’s note design / construction stages.
Council encourages building methods that avoid the use of fill,
such as suspended floor construction and stepping down slopes All proposed buildings works
rather than cutting and filling. outside of line of influence for
stormwater infrastructure.
S4.2 ✓
Where excavation is carried out-
c) a minimum cover of 600mm is maintained around
all utility infrastructure (to top, sides and base of To be complied with at detailed
services); or design / construction stages.
d) a retaining wall is provided to support the soil
surrounding the service;
S4.3 ✓
Compaction with a vibrating roller is not carried out
within 600mm of any utility infrastructure.
To be complied with at detailed
design / construction stages.
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 3 of 20
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.