Noosa Shire Council – The Noosa Plan
Earthworks Code
Performance Criteria and Acceptable Solutions
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
suppress dust; To be complied with at detailed
b) provision of dust stabilised or sealed internal design / construction stages.
roads;
c) protective covering of exposed areas that are
left for more than 2 weeks; and
d) if there is no valid development permit for the
site, disturbed areas are revegetated using
species identified in PSP3 - Landscaping
Plants and Guidelines;
S4.2 ✓
Earthworks are undertaken only during the hours of 7am
to 6pm, Monday to Friday and 7am to 6pm on Saturday.
No work is undertaken on Sunday or public holidays. To be complied with at detailed
design / construction stages.
Vegetative Waste S5.1 ✓
O5 Cleared vegetation is transported off-site for disposal in
an approved green waste disposal facility;
Vegetation cleared from a development site is disposed of in To be complied with at detailed
an environmentally responsible manner. design / construction stages.
S5.2 ✓
Cleared vegetation is mulched on-site and reused for
landscaping of the finished development;
To be complied with at detailed
design / construction stages.
S5.3 ✓
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 2 of 5
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.