C2. Eng Report
Attached to the e-mail Response to Information Request - MCU17/0572 & OPW17/0611.
Original PDF page 95, section 1. The text section number identifies this passage in the reader.
PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES COMMENTS
nutrient reduction requirements; with SPP 2017.
S1.5 ✓
Stormwater outlets that directly discharge to naturally acidic
environments are managed to prevent eutrophication;
To be complied with at detailed
design / construction stages.
Refer to civil engineering report,
in specific stormwater quality
section prepared by this office.
Stormwater outlets directly into
existing Council infrastructure.
S1.6 ✓
Suitable methods are incorporated to prevent the spread of
invasive environmental weed species at stormwater outlets.
To be complied with at detailed
design / construction stages.
Refer to civil engineering report,
in specific stormwater quality
section prepared by this office.
Water demand S2.1 ✓
O2 Captured water is plumbed to be available for all
Urban development reduces the need for mains water by external uses including gardening, irrigation, ponds
capturing and utilising run-off from appropriate areas on and outdoor cleaning. To be complied with at detailed
site. design / construction stages.
Solution: ✓ = Acceptable Solution
A/S = Alternative Solution
N/A = Not applicable to this proposal
Page 2 of 5
July 2017
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.