Council archive · source document
0014C22C.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
+ INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Vession 17.0, 2 October 2006
Fisheries matters 21. The application involves: (tick the applicable box/es}
For more information refer to schedute 2of the 1P LJ (i) anassessable material change of use for aquaculture - complete Part O; of Form 1;
Unless you answered “none of the above" to 021, CJ (ii) assessable operational work that is the construction or raising of a waterway barrier -
the application requires assessment by the — complete Part O3 of Form 1;
Dope Primary Indust and Fisheries C7 (iii) assessable operational work completely or partly within a declared fish habitat area-
if an agency other than DPISF is the assessment complete Part Oz of Form 1;
rey ioe open rdaten totems {Je | ‘CJ (iv) assessable operational work that is the removal, destruction or damage of a marine
(iv) and an advice agency in retation to item (v). plant - complete Part O2 of Form 1;
[J (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
{X] (vi) none of the above.
Integration of land use and public 22. The application involves: (tick the applicable box/es)—
transport de. 23, schedule 8A C1 (i) a material change of use assessable against the planning scheme for a purpose
the ah cckeule 2 ol heiP Seotlaton mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
Unless you answered “none of the above’, the schedule.
application triggers referral to QT as a concurrence CT] (ii) reconfiguring a lot—
aaency. CJ (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
[-](b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
@ (J (c) on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
LJ (d) for aresidential purpose within the 25 ANEF contour for an airport;
[J (e) for aresidential purpose resulting in 100 or more allotments.
(] (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
[“] (a) is completely or partly within a public transport corridor or a future public
transport corridor;
(J (b) will result in work that encroaches into an airport's operational airspace.
(iv) none of the above.
Railway safety and efficiency 23. The application involves: (tick the applicable box/es)—-
ears orate are to Guile 23 atherle BA CL (i) a material change of use assessable against the planning scheme for a purpose
Unless you answered “none of the above’, the mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
application triggers referral to QT as a concurrence schedule.
agency. (J (ii) reconfiguring a tot—
(J (a) on Jand that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
@ (_] (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
[J (c) on land that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
(J (d) on land that abuts rail corridor land, commercial corridor land or future railway
land and an easement abutting the corridor or future railway land is created;
[1 (e) on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
(1 (f} for a residential purpose resulting in 100 or more allotments.
(1 (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m3, on land that—
[J {a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
[J (b) is completely or partly within future railway land, or a railway tunnel easement;
(J (c) abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
£1 (iv) none of the above.
Page 7See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
0014C22C.001.pdfRelated documentPublic source context ↗
07/0070 - MCU - Boundary Realignment & 2 Detached Houses [As Published]Related documentApplication case desk ↗
07/0070 - MCU - Boundary Realignment & 2 Detached Houses [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.