Skip to the record
Accept no imitations.

Council archive · source document

0014C22C.001

of 61

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

*
     _ INTEGRATED PLANNING ACT 1997                                                                               IDAS Assessment Checklist, Version 17.0, 2 October 2006
          Whether particular buildings may be | 16.       An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
          occupied for residential purposes               referral to the local government as the concurrence agency.
          For more information go to schedule 2 table 1 of the
          IP Regulation.
          Assessment period 15 days. No response is a
          deemed refusal.
          Design and siting                          17.  An application may trigger referral to the local government as the concurrence agency if the building work
         For more information go to schedute 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
         {P Regulation,                              18.  An application may trigger referral to the local government as the concurrence agency if the building work
          Assessment period 5 days. No response is a      does not comply with the qualitative statement for building clearance and site cover.
          deemed refusal.                            19.  An application may trigger referral to the local government as the concurrence agency if the building work
                                                          does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
                                                          Development Code, part 11 or 12.
          Fire safety in particular budget           20.  An application may trigger referral to the local government as the concurrence agency to determine the
          accommodation buildings                         building will comply with the fire safety standard under the Building Act 1975 when the building work has
          For more information go to schedule 2 table 1 of the been completed.
         IP Regulation.
          Assessment period 15 days. No response is a
          deemed refusal,
          Higher risk personal appearance            21.  An application may trigger referral to the tocal government as the concurrence agency to determine if the
         services                                         building work
          For more information go to schedule 2 table 4 of the e complies with the performance criteria of the Queensland Development code part 15; and
         IP Regulation and the QDC part 15.               e     the work does not comply with an acceptable solution stated in the part.
          Assessment period 15 days. No response is a
@         deemed refusal.
          Building work for residential service | 22.     An application for building work for premises in which residential care service under the Residential
          For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
          IP Regulation and the QDC part 20.               referral to the tocal government as the concurrence agency.
          Assessment period 15 days. No response is a
          deemed refusal.
          Building work for removal or               23.   An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
          rebuilding                                       referral to the local government as the concurrence agency.
          For mora information go to schedule 2 table 1 of the
          IP Regulation.
          Assessment period § days. No response is a
          deemed refusal.
           Building work for rainwater tank in       24,   An application may trigger referral to the local government as the concurrence agency to determine if the
          designated rainwater tank area                   building work or structure complies with the relevant performance criteria if -
           For more information go to schedule 2 table 1 of the e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
           IP Requietion and the QC part 25,                   building work, in 4 designated rainwater tank area; and
         Assessment period 15 days. No response is a        e   Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
          Geemed renal                                          solution for a relevant performance criteria.

                                                                                            Page 11

Used in these records

About this file

File size
4.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0014C22C.001.pdf · 4.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.