Skip to the record
Accept no imitations.

Original source · versioned page text

Attachment C - 2007 decision notice

of 10

Page text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                         8



                                      Local Laws, Policies & State
                                      Regulation Requirements
                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


     THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
                             CONDITIONS OF APPROVAL

1.      The applicant is informed that payment via credit card transaction will not be an acceptable method of
        payment for development contributions conditioned in this permit.

2.      The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and Local Law
        No. 12, prevents a builder or building contractor carrying out building work on a building site in a way that
        makes or causes audible noise to be made from the building work:-

        2.1.   On a Sunday or public holiday, at any time; or

        2.2.   On a Saturday or a business day, before 7.00am or after 6.30pm.
        A maximum penalty of $1,500 applies to an offence under this legislation.
3.      Any building works partly or completely seaward of the Coastal Building Line under the Coastal Protection
        and Management Act 1995 requires referral to the Environmental Protection Agency.

4.      Pursuant to the Building and Construction Industry (Portable Long Service Leave) 1991 Act if the cost of
        operational works exceeds $80,000, then a portable long service leave levy is required to be paid. In
        accordance with Section 77.(1) of the Act, Council is required to sight the approved form issued by the
        Building and Construction Industry (Portable Long Service Leave) Authority that confirms that the
        requirements of the Act have been satisfied. A statutory declaration outlining the cost of the operational
        works must be submitted to Council with the lodgement of any application for operational works over the
        site.

5.      Prior to the commencement of the development, a plumbing assessment must be obtained from Noosa
        Council’s Plumbing Services Section in accordance with the Plumbing & Drainage Act 2002 (as
        applicable).




AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@e80859de\@[email protected]
Log in to download the original file

Attachment C - 2007 decision notice.pdf · 100 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.