Skip to the record
Beware of cheap imitations.

Council archive · source document

RFI - Attachment 3 - Operational Waste Management Plan · MCU22/0094

of 52

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

2.3.         Refuse Bins and Equipment Requirements
Table 2.3 and Table 2.4 below outlines the number of bins and additional equipment required for the development. As waste volumes may vary
according to the development occupants’ attitudes to waste disposal and recycling, bin numbers and sizes may need to be altered to suit the
building operation. The table shows the maximum number of bins and equipment expected.
Table 2.3: Bin Requirements
  Refuse Stream                                  Bin / Equipment - Type or Size                                           Bins Required
  General Waste                                              240L                                                               4
  Combined Recycling                                         360L                                                               4


Table 2.4: Additional Equipment
  Description                                         Quantity               Notes – See Appendix A.2. for details
  Refuse / Cleaner Trolleys                                   TBD            To assist in manual transfer of refuse to the refuse room.
                                                                             Provides immediate disposal point within refuse generating areas. To be provided by
  Back-of-House Bins                                          TBD
                                                                             building operator.




2.4.         Refuse Storage
All refuse will be stored within mobile garbage bins (MGBs) supplied by council within a dedicated fully enclosed refuse room on the northern
corner of the building and positioned closest to the highest waste generating areas of the development.
The room is of a sufficient size to house all bins required in Table 2.3 with the additional equipment required in Table 2.4 stored within the
laundry/cleaners room next to the refuse room as required when not in use.
Figure 2.1 below shows a potential configuration for the refuse room. The configuration and size of the refuse enclosure is provided to ensure
the bins are accessible or easily manoeuvred and adequate clearances are maintained.
Bin washing facilities inclusive of a sewer connected drainage point will be provided within the room with rollover bunding less than 100mm high
located at the entrance of the room.




Site: Lot 4, 28 Eenie Creek Road, Noosaville
Reference: 23BRW0003                                                                                                                                               13

Used in these records

About this file

File size
6.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

RFI - Attachment 3 - Operational Waste Management Plan.pdf · 6.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.