Council archive · source document
RFI - Attachment 3 - Operational Waste Management Plan · MCU22/0094
Plans and drawings: the text below has words only, no drawings.
Original PDF page 24, section 1. The text section number identifies this passage in the reader.
3.2. On-going Management The tables below are for the demonstration of required tasks during the operational phase of the development and therefore intentionally left blank. Responsibilities have to be assigned for all on-going refuse management operations. This is generally done by a building manager, staff and / or cleaners. The following lists (Table 3.3 to Table 3.9) are designed to help managing responsibilities and monitor the refuse operations in order to maintain efficient services and a safe environment. Consideration should be given to the appointment of a ‘recycling champion’ to oversee all refuse management related activities and the implementation of recycling programs within the development. Table 3.3: General Refuse Management Checklist Objectives Checked Remarks Organising of weekly pick-ups for all refuse streams. Liaise with Noosa Council as required. Managing daily cleaning cycle and refuse transfer between refuse storage / collection areas. Check bin fill levels and rotate / swap bins as required 3.2.1. Safety Transferring refuse bins and using refuse management equipment are considered hazardous tasks. Therefore, contractors must ensure that a full risk assessment of equipment, surfaces and related gradients is complete. The contractor must provide procedural documentation to appropriate personnel prior to delivery of equipment and occupancy of the development. Table 3.4: Safety Checklist Objectives Checked Remarks Abiding by all relevant occupational health and safety legislation, regulations and guidelines to ensure site safety for visitors, staff and contractors. Assessment of any manual handling risks and preparation of a manual handling control plan for waste and bin transfers. Provision of equipment manuals, training, health and safety procedures, risk assessments and personal protective equipment to staff / contractors in order to control hazards associated with all waste management activities. Site: Lot 4, 28 Eenie Creek Road, Noosaville Reference: 23BRW0003 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 3 - Operational Waste Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.