Council archive · source document
RFI - Attachment 3 - Operational Waste Management Plan · MCU22/0094
Plans and drawings: the text below has words only, no drawings.
Original PDF page 26, section 1. The text section number identifies this passage in the reader.
3.2.4. Education and Communication On-going education is important to ensure people continue to use the facilities as originally intended. If applicable, building management should be involved in education of building occupants and encouraging tenant participation in recycling activities. All leasing contracts should contain clauses pertaining to waste management arrangements and use of any associated equipment. Table 3.7: Education and Communication Checklist Objectives Checked Remarks Communication of refuse management arrangements to visitors, staff and contractors as required. Consideration of promotional opportunities for any successes e.g. awards programs. 3.2.5. Refuse Minimisation Refuse minimisation is an important part of any site operation. At a minimum, the following should be implemented. Additional refuse minimisation options can be found in Appendix B. Refuse minimisation requires regular reviewing to ensure operational sustainability of refuse volumes, equipment and economic feasibility. It is recommended that refuse weights and movements are noted and reviewed. An external review is usually conducted 12 to 18 months after the implementation of the plan. Table 3.8: Refuse Minimisation Checklist Objectives Checked Remarks Regular review of material quantities to avoid over-ordering. Consideration of secondary and recycled materials where possible. Encouraging refuse minimisation through education and signage (see below). Reduce refuse through continuous monitoring and review (see below). Consideration of onsite composting activities. May be implemented as educational activity Site: Lot 4, 28 Eenie Creek Road, Noosaville Reference: 23BRW0003 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
RFI - Attachment 3 - Operational Waste Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.